Consider Special stock in MRP run

Hi all,
Is it possible to consider the special stock (table MSLB) when I run MRP (MD01)?
The type os special stock is 'O'
Thank in advance,
Felipe Simionatto
Edited by: fsimionatto on Feb 8, 2012 8:09 PM

Special stock cannot be included in the MRP run, either you have to make it unrestricted or implement a BAdI or userexit.
BAdI/Enhancement implementation may not be very reliable :
The following BAdi's are available for MRP related stuff
MD_ADD_COL_EZPS           BAdI: Extra Columns for Evaluation PP-MRP Reqmnts P
MD_ADD_COL_OVERVIEW       BAdI: Display of Additional Columns in the Material
MD_ADD_ELEMENTS
MD_ADD_ELEMENTS           BAdI for Adding Additional Requirements/Receipts
MD_CHANGE_CALENDAR        BAdI: Change Calendar for Range of Coverage Calcula
MD_CHANGE_MRP_DATA        BAdI: Change Data when Importing MDPSX
MD_DISPLAY_ELEMENT        BAdI for Changing Display of MRP Elements
MD_DISPLAY_ELEMENT
MD_EXPORT_TREE            Order Report: Export Contents of the Order Tree
MD_EXT_SUP                BAdI for Determining the Issuing Storage Location
MD_INTERACT_PLANNING      BAdI for Deactivating Changeability of MRP Elements
MD_LAST_LOT_EXACT         BAdI for Calculating Last Lot Exactly in Individual
MD_M61R_DELKZ_POPUP       Definition: Display data for MRP element (MD04)
MD_M61R_EXT_REQS_TXT      Definition: Supplement data of MRP element for ext.
MD_M61X_EXT_REQS_GET      Definition of selection of external rqmts in FuGr M
MD_MODIFY_PRODVERS        BAdI for Modifying Production Version
MD_MODIFY_SOURCE          BAdI for Modifying Source Determination in MRP
MD_MRP_LIST               BADI for further processing of MRP list
MD_MRP_PARAMETERS         BAdI: Change Planning Parameters
MD_MRP_RUN_PARALLEL       Add-Ins for parallel planning run of requirements p
MD_PIR_FLEX_CONS          BAdI for flexible planned ind. req. consumption/red
MD_PLANNING_RESULT        BADI for Issuing Planning Result
MD_PLANNING_SCENARIO      BAdI for Maintenance of Add. Parameters in Planning
MD_PLDORD_BOMEX_CIF       BAdI: Deactivation of BOM Forced Explosion in CIF
MD_PLDORD_CHANGE          BAdI for Changing Planned Orders
MD_PLDORD_POST            BAdI: Update of Planned Orders
MD_PLDORD_SCHEDULING      BAdI: Schedule Planned Orders
MD_PLDORD_TIME_STAMP      BADI for publishing time stamp problems
MD_PURREQ_CHANGE          BADI for changing purchase requisitions
MD_PURREQ_POST            BADI for updating purchase requisitions
MD_PURREQ_REL_STRAT       BAdI for Deactivating Release Strategy for MRP Purc
MD_STOCK_TRANSFER         BADI: Change the Requirement Date During Stock Tran
MD_SUBCONT_LOGIC          BADI: Determine Subcontracting Logic
Available userexits for MD01.
LMDR2001                                User exits restr. profiles of opt. pur.ord.-based load bldg
LMDZU001                                User exits in additional planning
Edited by: Jeevan Sagar on Feb 8, 2012 2:30 PM

Similar Messages

  • To consider subcontract stock during mrp run

    Dear all,
    while mrp run it is not considering subcontractor stock .Is there any setting in spro so that it will consider subcontractor stock into consideration.
    with regards
    cp vijaya kumar

    Dear,
    Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • How to make Open Sales Orders consider unallocated stocks in MRP run

    Dear Experts,
          Maerial BOM   MATERIAL TYPE    STRATEGY GROUP        PLANNING STRATEGY      DESCRIPTION
                                                                                    Req-DM      Req-CU
    3.    TF180TK               fert                           20                                                       KE             make-to-order
    2.    TH300TK               halb                          20                                                       KE             make-to-order
    1.    TA300TK               roh                           10                                  LSF              KSL           make-to-stock  
    As listed above material in line no.1  is required to produce 2 and
                                                           2 is required to produce 3.
    I have open open sales orders for material TF180TK(fert).
    What settings do I need to effect,  to make the System consider Stocks & Open Purchase Orders for material  TA300TK (roh) which are not allocated to these Sales Orders , when  MRP run is carried out at plant level using MD01? 
    Regards

    Dear Bisolaaina,
    I Think by mistake this duplicate thread might have been created so pls close it
    Regards
    Madhu

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

  • Consider subcontracting stock in MRP

    Hello experts,
    Does anybody know what customizing is necesary for a material to consider the subcontracting stock in MRP??
    For that material, in in MRP3 view, I have assigned a checking rule for availavility check that has the flag w/o subcontracting unmarked, but it seems that it is not enought.
    Can anybody help me?
    Thanks !
    Laura

    Dear Laura,
    Sub-contracting stock is a special stock and it will not be considered during MRP run.
    You can define a MRP area for the sub-contractor and try to run MRP for that area alone.
    Check this thread to explore more,
    Re: subcontracting stock
    Regards
    Mangalraj.S

  • Plant stocks in MRP run

    Hi All,
    I have a material maintained in 3 plants say A, B, C. The stock is also maintained in all 3 plants. The production happens only in plant C. MRP is run in plant C.
    But while MRP run, I want that system should consider the stock in all plants - A, B, C.
    Regards,
    Manish

    Hi
    It can be achieved only by APO.
    In R/3, we can run MRP at Plant Level (Maximum). When you run MRP at Plant C, System will consider the stock at C Only.
    From Plant C to Plant A requirements should flow (It can be done by using special Procurement Key)
    From Plant A to Plant B Requirements can flow by using special procurement Key
    Here we should understand that from Plant C requrements can flow to Plant A only directly.
    Generally we will requirements that system should consider the stock in all plants as well as requirements should go to 1 or more plants automatically.
    We can do this by using Quota arrangement. But it doest not solve the issue.
    regards,
    Nag

  • How to consider unrestricted stock for the run of MRP project?

    Hi every one!
    We are facing a problem using MRP on project stock.
    We would like that the MRP takes unrestricted stock into consideration while calculating quantities to order for project stock.
    For example, a project request 100 pieces of material X.
    We have already 25 pieces of material X in unrestricted stock and 0 in project stock. 
    When I run MRP (MD51), it creates a Purchase Requisition of 100 pieces on the WBS element I have defined and not 75 as expected!!!
    By searching in documents and forums, I have read I have to set the value "2 - Collective requirements only" into the field MRP4 > BOM explosion/dependent requirements > Individual/coll. of the Material Master.
    I have done it but it doesn't change anything.
    Thanks in advance for your support!!!
    Bogdan

    Hello guys!
    As told, here I come with news about my problem.
    Finally, the Strategy Group didn't solve our problem.
    We didn't solve our problem as planned but we have found another way to work.
    Instead of including the unrestricted stock in the MRP project, we use transaction CO46 to have an overview of the unrestricted stock of all the components of the project's BOM.
    Based on that overview, the user can make stock transfers of the available quantities from the unrestricted stock to the project stock.
    I hope it can help people having the same problem!
    Bogdan

  • Ways to consider the stocks provided to vendor on the MRP output

    Hi Gurus,
    I have a requirement where the business want the stocks provided to vendor to be considered when running the MRP in plant.
    This is a subcontracting vendor and when checking the MD04, the stocks was displayed as special stocks. Is there any way that we can consider subcrontract stocks for MRP?
    I have checked already the MRP areas, but I since we have a lot of existing plants in our system. I intend to not use the MRP area as it might cause issues to planning in our existing plants. Is there any other way?
    Please let me know your thoughts on this.
    Edited by: ellen gatchalian on Jan 30, 2012 1:08 PM

    Hi Elen,
    I believe by having BAdI- MD_SUBCONT_LOGIC implemented in your system, you can consider Subcontracting Stock in MRP.
    Check with technical team to do the needful coding.
    Hope it will help.
    Regards,
    Anup

  • Include QI stock in MRP

    Hi there,
    Please suggest me where I need to do the configuration so that the material in QI is considered as available in MRP run.......
    Is it done in T-code OPJJ... I am not sure because as per my undertanding this check is done during the order creation as release......
    Regards
    Kaushik

    Hi,
      When mrp run system always consider QM stock for net requirement calculation.
    You don't have option to include or remove the QI stock.
    Option available for
    1. Stock in transit
    2. Blocked stock
    3. Restricted use stock.
    In OPJJ, this is only useful for availability check. Availability check is different from net req calculation ie, procurement or planning proposal.
    Regards,
    Dharma

  • Stock Report ( With Special stock Indicator E)

    Dear Experts ,
    I have done the  initial uploading for the stock of finished goods via 561-E for sales order stock ( make to stock ) & 561 for make to order stock .
    When i run MC.9 , the system outputs only make to stock materials .
    & when i run MBBS the system outputs only make to order stock .
    How can i see the entire stock ( make to order & make to order ) in a sinle reprt?

    Dear Brother
    Please use Transaction code MB52 and check in special stock indicate and run the report all data for special stock will be appear.
    Regards

  • Automatic MRP Run while saving SO

    Dear All,
       our customer requirement is when ever they make a sales order there should be an automatic MRP Run for all the materials available in Sales order.
    How to map this scenario.
    Useful answer will be definately awarded.
    Regards,
    HT

    Hi
    Firstly you plan what kind of planning you again do, whether : Make to stock or Make to order,
    If it is make to stock: then we have keep then a re-order point planning at MRP setting at material master and maintain mrp type as VV (Re-order planning). when ever the stock comes to re-order point stock, automatically MRP run takes place.
    If it is Make to order: then maintain the item category group as 0001 (Make to order planning) and after create Sales Order, we have do the MRP Run at MD02, and MD50.
    Reward if it helps
    Regards
    Prasanna R

  • Block Stock consider during MRP Run and Stock availibility check

    Dear All,
    I am facing the stock availibility check , Sytem consider the Defective material which is Block in same storage location ,and system not generate the Planned order .
    -Blocked Material stock 100, and requirement 100 then system not generate the planned. Client need the system generate planned order 100 , Because 100 material is defective.
    I have configured the system scope of availibility , Block stock check remove , but problem is not solve.
    Thanks
    Rajesh Tiwari

    Dear ,
    Can you please re-check your MRP plant parametrs in OPPQ wether   you have selected blocked stock( Available Stock tab )  option by chance ?
    Please de-select the same  and re-run MRP.Generally MRP does not consider block stock  in net requirement calcualtion .One more thing  , MRP does material avilablity check as per OMJJ set up ( define availbality chek ) but does not consider the same while doing net requirement calcualtion to generate PR rather it goes down to MRP plant parametrs ( oppq or oppr )
    Hope this is clear
    Regards
    JH
    Edited by: Jiaul Haque on Sep 16, 2010 9:29 AM

  • STOCK OF FINISHED PRODUCT BY PIR NOT CONSIDERING WHILE TAKING MRP RUN

    DEAR SAPGURUS,
           I have finished product stock of 50 nos through planned independent requairement. now i am creating sales order for finished product but mrp run generate the planned order for finished product. I dont have planned order for finished product because material already have stock. what can i do please give solution.
    thanks.
    Regards
    Atul

    Hi Atul,
    Please describe your problem better, it's not easy to understand...
    Strategy 10 is net reqirement planning:
    - SAP considers only PIRs as requirements, SOs are not considered
    - SAP considers stock levels
    - requirements should be LSF (check in MD04)
    If you input sales order SAP won't create PldOrd for it. If you have stock and you want to create more to fulfil you SO, you have to input PIR accordingly and run MRP.
    Please clarify your problem...in a way that we may understand it.
    http://help.sap.com/saphelp_47x200/helpdata/en/60/9ea1536fbd11d191820000e8a5f6e6/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/e0/71bb199c9f11d191920000e8a5f6e6/frameset.htm
    Thanks,
    Csaba

  • Exclude special stock (project) from MRP run

    Hi,
    Would need to exclude special stocks representing project stocks from MRP calculation. Could not seem to find a way to control this via config similar to options available for blocked and in-transit stocks.  Is there an option to do this in config?  Thanks...

    Hi,
    You can exclude the stock by creating storage location MRP.
    Create separate str location for project stock by MMSC.
    In the material master of mrp 4 view, str location indicator - select Exclude str loc from mrp  for new ie, project str loc.
    Check your Plant & str location by checking Plant/ data view in material master whether you have excluded the correct str location which you have newly created.
    When mrp run system exclude this str location.
    Regards,
    Dharma

  • To run MRP without considering unrestricted stock

    Hi,
    Is it possible to run MRP without considering unrestricted stock of the material?
    Best Regards,
    Sitaraman

    Dear All,
    Thanks a lot for your response to this thread.
    In fact i tried the option of providing value 1 to exclude the storage location stock from the MRP. But it did not fulfil my requirement.
    My requirement is as below:
    The business wants to create the material requirement by manual reservations.
    Also for this MRP run except this manual reservations all other issue elements, receipt elements and stocks should not get considered.
    With checking group configuration i am able to exclude all other issue, receipt and stock elements. But in this settings there is no option to exclude the unrestricted stock.
    What happened when i tried giving 1 in MRP 4 view to exclude the storage location stock, the system not only excludes the stock but also it excludes the storage location from MRP run. Meaning...
    Plant   XXXX
    SLOC YYYY
    SLOC - YYYY current stock: 100
    Manual reservation created (requirement) for SLOC -YYYY : 50
    The expectation out of MRP run is, to create procurement proposals for 50 numbers with out considering SLOC - YYYY stock of 100 and not to exclude the SLOC YYYY itself.
    Best Regards,
    Sitaraman

Maybe you are looking for

  • Cannot delete disk image from timecapsule.

    I have two disk image's on my time capsule and one is for a computer I no longer have.  Therefore I wanted to delete the time-machine disk image.  I recently upgraded to Yosemite. In order to delete I have tried the following: Mounting the time capsu

  • Exit Code: 7 when installing Premiere Elements 10

    while installing permiere elements 10 encountered several errors. Exit Code: 7 -------------------------------------- Summary -------------------------------------- - 0 fatal error(s), 8 error(s), 7 warning(s) WARNING: DW031: Payload:{3F023875-4A52-4

  • Edit Multiple items.Is There a way?

    I have a very large number of recorded Tv-shows in my mac,I want to edit them all together.So that I can place them in the Tv Shows library instead of the movies library.They are about 200 Episodes So I can't do it one by one.How can I edit the Video

  • CB21AG and a Wyse Client Bridge v90 Running Windows XPe

    Has anyone successfully installed the driver and ADU on a Wyse v90 running Windows XPe? When I attempt to install the Cisco software for the wireless NIC we are using onto a Wyse V90 running Windows XP embedded, I get the following message. This file

  • Differenciate Between Hash....

    Hi there, Please help me with differences between HashTree, HashTable & HashMap Also what exactly is HashCode ??? Thanx in advance Harmeet