Considering stock in other plants' storage location

Hi all,
E.g. For 1 material I have stock in 2 plants A and B. Major consumption being in plant A (say 80%). So when I execute MD07 for this material with MRP controller for plant A (collective overview),  in the 'plant stock' column I would like the stock to be sum of stock in plant A and plant B. Is it possilble ?
Regards,
Yogesh

Hi,
For that you can use MD48, but it is per material. If you want such feature for multiple materials, then you will have to build a custom report (for stocks refer to table MARD). As std SAP ECC does not have this feature.
Hope it clarifies.
Regards,
Vivek

Similar Messages

  • Stock transfer between Plant/Storage location to Plant/Storage location

    Dear Experts,
    This is a MM component of SAP Retail.
    We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
    To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
    When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
    I do see the following set up in SPRO and I have done the following.
    Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
    Step2: Assign Delivery Type and checking rule according to storage
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
    Step3: Define Shipping Data for Stock Transfer between Storage Locations
    SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

    Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
    Step5: Shipping Point Assignment According to Storage Location
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
    Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
    Question.No:2
    I do see the following setting.
    Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
    Display the IMPLEMENTATION
    Double click on the method GET_SUPPLYING_SL
    Click the Execute button
    Click the detail button on IF_EX_MD_EXT_SUP
    Execute GET_SUPPLYING_SL
    There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
    Kindly provide your inputs.
    Thanks,
    Vasanthan

    Dear,
    Have You configure MRP in second plant (where you want to transport the Material).
    Please try with this and do again Po for stock transport.
    Regards
    Piyush Patel

  • Report on QI, Blocked, Returned Stocks at Plant & Storage location level

    Hi,
    Would like to know any reports which gives QI, Blocked, Returned stocks at Plant & Storage location level.
    Regards,
    Vengat

    hi,
    What do you exactly mean say by "Returned  stock"..
    Also go through by MMBE tcode ...
    Regards
    Priyanka.P

  • Stock report based on stock type with a storage location

    Is there a standard SAP report that will give me the stock information based on the storage location and stock type (unrestricted, QI, blocked, etc?)...for instance if I want to find all QI stock in a certain plant/storage location?  I want it to show a list of materials and their quantities, not on an individual basis as in MMBE.
    Thanks!

    Thanks again for your response.  I've used your last mentioned method before but with MMBE you have to enter a material number.  We want a report of all materials in a particular stock type.
    I was able to achieve this by goign to MB52 and setting up a filter on a layout.  My users can now select that filter on the selection screen to get the desired result.
    Thanks again for you attempts to help!

  • Stock Transfer between 2 Storage locations

    Dear All
    I want to configure Stock Transfer between 2 Storage locations.
    I have activated the same in configuration but can anybody provoide complete details at to how the process happens.Is there any standard document type to be used like UB in case of stock tranasfer between plants,do we craete SD Delivery etc.
    Regards
    Vaibhav Mahajan
    Edited by: Csaba Szommer on Aug 22, 2011 12:56 PM

    Hi
    Stock Transfer between 2 Storage locations,there is no seperate configuration needed( like stock transport order b/w plants  doc type UB), just goto MIGO
    There are 2 options are there for Stock Transfer between 2 Storage locations
    1. one step procedure movement type 311(from unrestricted to unrestricted)
                                                                   323(from quality to quality)
                                                                   325(from blocked to blocked)
    2. Two step procedure movement type 313 and 315(only possible from unrestricted to unrestricted stock)
    During this transfer no accounting document will generate because you are transferrring the stock within the plant,
    Thanks

  • Inspected stock posting to multiple storage location without batch

    Hi,
    At the time of Usage Decision, I want to post the inspected stock to multiple storage location i.e., Rejected Stock to Scrap Storage Location, Qualified Stock to Unrestricted Use Storage Location.
    Quick response will be appreciated.
    Anandkumar KS

    The scrap line has no storage location since that stock is typically written off and scrap cost center is defined in configuration.
    A possible alternative is to set up VMENGE08 and VMENGE09 with the same material movements you want to use.  You obviously aren't using the 553 movement type as that writes off the material.  That could give you two lines to use for your scraping.  I can't remember if these stock posting lines give you the storage location option or not and I don't have a sandbox available to test today.  If you need to post more then two grades in one inspection lot, you'll have to do the first two postings, save the UD, then come back in and do a second posting for the next two grades.
    Read the configuration help file you'll find in confg for "Define Inventory Postings" under the QM config.
    You can also change the displayed names of the stock posting lines.  That's explained in the config file as well.
    Craig

  • Material block for sale in plant-storage location level

    Dear experts,
    Please help me how to block a material to sale in plant-storage location level.
    Thank you.
    Regards,
    Badruddoza

    The standard sales block (MVKE-VMSTA) in material master is valid for sales organisation / distribution channel combination (VKORG, VTWEG) - this means you cannot do it for Plant / SLoc combination,
    What does it mean to block it at plant / sloc level? Generally in SO you do not specify the storage location. Or you are speaking about MRP also? In this case you could use SLoc-MRP (with proper availability check in delivery) for your material but the problem is that a plant might be assigned to several sales area and this SLoc would be hidden for them also.
    Could you please specify what would you like to achieve, what sales block means according to you?
    Regards,
    Csaba

  • MRP with stocks in other plant

    Hi,
    Scenario: 5 stocking Plants + 1 Manufacturing plant under a company code.
    For a finished product, all 6 Plants have stock.
    For MRP, the demand of the finsihed product from all 6 plants is combined and fed as PIR feeding at manufacturing plant.
    Question: How to make  SAP to consider stock of all plants and generate the planned order for the difference Qty?
    E.g. PIR at Mfg plant = 100 Nos.
           Stocks at 5 Stocking plants = 50 nos
           Stocks at 1 Mfg plant          = 10 nos
    Hence on MRP run, system to generate planned order for 100 - (50+10) = 40 Nos at mfg Plant.
    Thanks

    Hi Nitin,
    SAP's planning is based on lean-manufacturing practices - i.e. you will never have stocks in excess of requirements (plus safety stock).  So, in reality, you will not need to "adjust" your production for stocks lying at stocking plants (stocks at stocking plants would be just equal to safety stock logic defined at each plant).
    Now say some demand at any of the stocking plants got cancelled, and you end up with excess stocks at that moment.  So in next MRP-run, system will delete some future STOs.  Or, if there is nothing to delete, then MRP-list will show exception message # 25, and you can decide how to move that excess stocks.
    So, in conclusion, adjustment of production, based on stocks at all 6 plants, will NOT be needed.  Just produce as per MRP proposals, and be on the lookout for exception message # 25.  (Hope you are using special procurement key for demand transfer from stocking plant to production plant).
    - Chetan

  • PLANT-STORAGE LOCATION  Relation

    Hello To everybody,
    I just configured all the MM module but while creation a PO im seeing a message that says that the PLANT-STORAGE LOCATION relation doesn´t exist or the Storage Location is Bloqued.
    I just review OX09 and everything is ok, anyone has seen these before ?

    Hi,
    First of all check all your assignments.
    ie., Whether Storage Location is Created w.r.t to Plant,
         Wherher Plant is assigned to Company code or not.
    Secondly,
    Whenever you create a Material, you have to check your periods(For the Accounting Purpose).
    so go to OMSY -> Transaction code, and check the period settings.
    if not Maintain them in OBY6 -> Company code global Data.
    Thanks

  • Finding Plants\Storage locations associated with the Routes

    Hi,
    I need to find all possible Plants/Storage Locations associated with the Route in hand.(These routes can be found in TVRAB table).Is there any mapping done in SAP between Routes and Plants or Routes and Departure Points ?
    If anyone has any inputs regarding this, it will be really helpful.

    Hi,
    To determine the route we need to know the Plant and the Shipping point or connection point/port.
    I think we can find the routes in table TVRO or VBLK.
    and for route descirption we go for the TVROT
    First check the tables for the Plant and shipping point then we can link to the route.
    Pls check this link
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/560dee545a11d1a7020000e829fd11/frameset.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/17/c0b758903111d2b42f006094b9b9a0/content.htm
    Regards
    Lekha

  • Transfering Subcon stocks to Other Plant of same vendor

    HI i need your help.
    We are transfering to a new company code, new plant.
    On old plant we have materials issued to vendor for subcon.
    Is there a way to transfer those stocks to other plant of same vendor?
    Can you also help me on this process (subcon)
    to send the materials in vendor i have to create subcon PO first,
    then transfer the materials of the assembly to vendor using what tcode and what movement type?
    Im new to this..
    regards,
    Najah

    Hello
    Here both Plant are under same company code, no need to configure the clearing accounts.
    During transfer posting ,
    The inventory value of the plant (valaution area) Transaction event BSX will be reduced and same will posted in the stock account BSX of the other plant.
    Entries will be :
    Example    
                            Valuation class          Value     G/L account
    Plant 1   BSX              3000                 -XXXX    300000 
    Plant 2   BSX              3000                 +XXXX   300000
    If both plants are in different company codes, then clearing accounts will comes into picture when you transfer post with 301 'O'.
    Warm regards
    Ramakrishna

  • How to consider the stocks of other plants in MRP run

    Hello All,
    I have a requirement in  which  A finished material which it´s planning and production is on PLANT 1 and and is transfered to plant 2 (there is no production and no planning on this plant, it is used for storage only). In that case, I would like the MRP to check the stock of finished material both in plant 1 and 2 for creating planned orders .
    I know  this can  be possible  with APO .  but is there any other way round we can do this like MRP area or scope of planning or some z developemenmts.
    Thanks in advance
    Regards
    Anupam Sharma

    Is there any stock at production plant?  Where does the goods issue to sales occur?
    If both plants can have stock and sales can occurs in both plants then it is the issue not only stock but also sales order consumption with planned independent requirement.  You need to have two BADI to do so.  First is the one you mentioned and the flexible PIR also (MD_PIR_FLEX_CONS).
    If only storage plant has stock and sales occurs here, then you may want to explore special procurement type produce in other plant and make storage plant a planning plant.  The receipt of production order at production plant will posted into storage plant directly.
    If sales occurs in storage plants, and there are stock in both plant, use special procurement type transfer from others (40 as standard).  When you run MRP, the system will check stock at storage plant first, then if shortage, create stock transfer request to production plant.  At production plant, the stock transfer request will be your demand to offset with stock there before create planned order.
    Like other comments stated previously, SAP cannot handle the multiple plants planning very well.

  • Stock transport order between storage locations and assignment category type E not in MRP

    Hello Gurus,
    I have a stock transport order between 2 storage location which belongs to the same plant. Besides the stock transport order is allocated to a sales order (account assigment category E). When I run the MD03, the system take into account the quantity of the stock transport order as a future entry and this is wrong. I need that the MRP has not into account the stock transport order as an entry.
    As an important information, If I modify the stock transport order removing the account asignment category E (sales order), then the MRP doesn't take into account it, so this is correct.
    Could anybody tell me how to get it?
    Thanks in advanced.

    Laura,
    It is normal that MRP will consider an STO as a receipt element; this is basic planning.  It is unclear to me why you think you do not want it to do so, but I will assume you have some logical reason.
    Contrary to what some others may have suggested, changing the scope of check for availability checking has no effect on which elements are considered for MRP.  MRP is a completely separate functionality from Availability Check.
    For Location > Location STOs (within a plant), then, you normally have the receipt element of the STO in the destination storage location, and the requirements element of an equal amount in the source storage location.  Net of these two elements is zero, unless you have already issued the STO at the source location.
    Changing the Account assignment from "E" means that the STO will not be relevant for your Sales order (in other words, when you receive this STO into the destination storage location, it cannot be used for your sales order).  In a general MTO scenario, it also means that the proceeds of this STO (the stock you received) cannot be used for ANY sales orders.
    One way that some people make an STO 'not relevant' for MRP is to alter the destination storage location such that it is not relevant for MRP.  You can change the MRP relevancy of the storage location in MM02 > MRP4 tab
    Best Regards,
    DB49

  • Stock valuation down to Storage location level

    Dear all,
    System setup for stock valuation is till Plant level. And understand that's how data stored in table MBEW and MBEWH until plant level only.
    Eventhough that is system standrd, is that possible to get the stock valuation until Storage location level?
    For eg: In MB5B, there is opening stock, closing stock and the material movement posting. I need to get opening and closing stock for each storage location.
    Could you please comment if there are tables store these data? Kindly comment.

    Hi Afshad Irani,
    Thanks for your reply. Understand from the previous post that stock valuation for storage location can be done via table MARDH or report MC.9, but this tools are excess base on period/month basis.
    My case, i need to report storage location stock for both (1)last month 06.2010 and (2)yesterday's stock 06.07.2010. So i can use MARDH table to report (1)last month stock for each storage location. While for (2) yesterday stock, table MARDH isn't help.
    Could you please advice further?

  • Downlading Material stocks and its Value, storage location wise

    Dear Experts,
    As we are reimplementing SAP, we need to download the
    a)     stocks Plant and storage location wise for all the materials. Bcoz stocks are maintained in different storage locations.
    b)     Value of stocks for each material in the Plant and storage location wise, Bcoz stock qty will be different in different location and hence the value will be dependent upon the qty ?
    How can we extract this ? From which tables do we need to extract  this ?
    Can any one guide on this ?
    Regards     
    Javeed Ahamed.

    Goto MB52 report ,change the layout asper your requirement and extract to excel.To extract follow this
    go to menu bar
    system-- list-- save -- local file
    alternatively you can take it MBEW table also(se16n)

Maybe you are looking for