Consingement Stock during the availibility check

Dear All ,
During the availibility check I want to consider  the customer consingment  .
E.G   if the plant level stock is 300 and customer consingement  stock is 30  then the ATP quantity should be 330 wen i am performing the Availibility check ...
Pls help me in this regard
Thanks in advance
Regards
Satish

hi,
you cannot take into consideration the stock available at consignee for availability check. the consignment stock is treated as special stock unlike unrestricted.
For transactions such as make-to-order production, consignment or returnable packaging processing that create special stock, the availability check is performed against special stock.
The following elements can be included in the availability check:
Stock
safety stock
stock in transfer
quality inspection
blocked stock
regards
sadhu kishore

Similar Messages

  • GATP - User exit during product availability check

    Hi,
    Is there any method (e.g. user exit)  to confirm the stock based on batch characteristic in APO during product availability check? i.e. before confirmation of the stock some validation needs to be put by reading the batch characteristics.
    Let me know if further clarification is required.
    Regards,
    RS

    Hi Manimaran,
    thanks for the reply,
    Actually we are not using class 400. The confirmation of stock should be done by reading the batch characteristic value because we want to put validation on the characteristic value. This should happen during product availability check.
    Is this possible based on batch class (023) and without using class 400.
    Regards,
    RS

  • VL10A - Stock on hand Availability Check before creation of delivery

    Hi,
    I'm trying to figure out how to control the creation of delivery via VL10A to first check for actual receipted stock before allowing the delivery to be created.
    eg. Material X has inbound delivery date 01.07.2011.  Sales Order has delivery date of 01.07.2011, thus schedule line has confirmed date of 01.07.2011.
    On 01.07.2011, inbound delivery has not yet been GR'd into stock, VL10A runs with current date set and outbound delivery is created for Sales Order, despite the stock not being available to deliver.
    Where does this check (for available stock on hand) need to be performed?
    Is there a setting in the input parameters in VL10A? If so which specific parameter on what tab controls this?
    If not, does this need to be handled in the Availability Check & Transfer of Requirements configuration of the sales order, so that the schedule line is not confirmed until the goods are in stock?  If so, what specific config is required to achieve this.
    During my research I have found responses indicative of both areas however no specific examples are available. Thanks for your help
    Jodes

    Hi
    Please check OVZ9 . In availability check control you can control the in/outward movements.
    Hope it helps
    Karthik

  • How to address missing parts during material availability check

    The system prompts that a particular component is missing during material availability check of a production order. Said component is available in the system upon verification in MMBE.
    We noted that the goods receipt date of the material is way beyond the requirement date, hence the system still prompts that it is missing.
    What we did to correct this is to change the basic start date of the production order thus changing the requirement date of the material.
    The resolution unfortunately, brought another problem, another planned order was generated, which consequently generated another purchase requisition.
    What is the proper way of addressing the missing parts prompt during material availability check?

    Hi
    Not able to understand why you are using BAPI & function module.
    It is a simple function of avaialbility check.
    For this you have to fill the availability chk field in material amster of all components &  givecheckinh rule  inOPPQ .
    After creation of process order, you can check COR2 it self.
    It is a std functionality.
    It should definitely work.
    Regards
    YMREDDY

  • Does BOP respect the availability check setting made in Schedule line category?

    Hi Gurus,
    Does BOP respect the settings made for availability check in schedule line category?
    Thanks,
    Nihar

    Hi Sourabh,
    In the Schedule line Category, we have an option Availability check right?
    Business requirement is to suppress Availability check at schedule line category level, where Availability check box is not selected.
    When I trigger availability check manually, the confirmation happens on the day requested & no additional schedule lines are created.
    For the same order, if I run the BOP with the above settings made in schedule line category; order is confirmed & is checking against stock & lead time.
    My question is: Online ATP respect the availability check setting made in schedule line category. Does BOP respects the same as Online ATP?
    I hope I was clear!
    Thanks,
    Nihar

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL

    dear Friends,
    our users want to  WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL SHOULD BE ENABLE,
    at present we maintaing KP in Material Master.  if we activated what will happen?
    please advice.
    with regards,
    Rajesh G

    Hi,
    The availability check is generally used for goods movements(GR,GI,reservation) & not for PRs.
    Regards,
    Vijay

  • What is the Availability check relevant for batches in Std. SAP except CH

    Hi,
    What is the Availability check value in material master relevant for batches in standard SAP except CH.
    As far as I know CH will enable to have automatic batch determination at sales order level. In the same manner, do we have any other availability check value in standard SAP like CH which will enable batch determination at delivery level.

    Don't post the same question repeatedly. Keep one thread open and close the other threads.
    You have already posted the same at  Wha is batch relevant availability check value in standard SAP except CH
    Regards,

  • An internal error occurred during the authorization check.

    Hi,
    Need help,
    While deleting chain in order to create Meta chain.I am getting this Error message.
    Thanks

    Hi,
    I am creating a meta chain.When i am trying to add local chain in it.Through general services tab >> start process.A dialog box appears asking me to delete one of the chain and the other one will act as both.When i am clicking yes then i am getting this msg.
    An internal error occurred during the authorization check.
    Edited by: Niraj Sharma on Aug 12, 2009 11:19 AM

  • Issue with sales order when doing the availability check.

    In MD04 we have a material avail date of 12.05.2011.    The order was then changed to 13.05.2011 delivery date to reflect this availability,  but then delivery time was added e.g GI time and route time which then showed the sales order in MD04 as 18.05.2011.    However,  if we run the availability and take the 18.05.2011  and key this in the delivery date,  it shows in MD04 as 13.05.2011.  It seems like the availability check is only looking backwards,  and I can't find a setting in ATP relating to this.  In MM they have foward and back consumption in days on MRP3.  Do these fields impact this.
    regards
    Kylie

    Check in OVLY what is maintained to your sale order type
    thanks
    G. Lakshmipathi

  • Changing the Availability Check key in an existent Sales Order line

    Hello gurus.
    Is it possible to modify the Availability Check key (VBAP-MTVFP) of a material in an existent Sales Order line?
    I changed it in the material master, but since documents are not automatically updated, I wanted to modify this value in an existing sales order line. I am not even able to find the field in it.
    I had to delete the order line and create it again, but then I have troubles getting the exact same confirmed date that I had before.
    Any help? Thank you.

    You cant see at item level.  To see in sale order, click from top menu bar, Environment -- Availability.   Now you can see the availability check on top of the screen.
    Meanwhile, I dont think, this field will be in editable mode once partial delivery is made in which case, LSMW also wont help you.
    If your requirement is desperate to change the availability check, to me the available option is close the existing sale orders, create fresh orders after changing the availability check in material master.  On the other hand, if you want to change only in sale order, then the option is LSMW as you cant even succeeed in TCode MASS
    thanks
    G. Lakshmipathi

  • Regarding skip the availability check in BAPI_PO_CREATE1

    Hi Abapers,
         Can you suggest any enhancement, to skip the availability check in function module BAPI_PO_CREATE1?
    (My requirement is, availability check should not be triggered, because delivery has been completed already).
    Regards
    Subash
    Edited by: subash Arthanari on Dec 2, 2008 10:56 AM

    u can pass field  Delivery Completed" Indicator
    structure BAPIMEPOITEM
    field   NO_MORE_GR
    like:-
    wa_item-material = p_matnr.
    wa_item-plant = '3200'.
    wa_item-quantity = 100.
    wa_item-conf_ctrl = 'Z01'.
    wa_item-ACKN_REQD = 'X'.
    WA_ITEM-ERS = ''.
    wa_item-NO_MORE_GR= 'X'.
    APPEND wa_item TO it_item.
    wa_itemx-po_item = p_int.
    wa_itemx-material = c_x.
    wa_itemx-plant = c_x .
    wa_itemx-stge_loc = c_x .
    wa_itemx-quantity = c_x .
    wa_itemx-item_cat = c_x .
    wa_itemx-acctasscat = c_x .
    wa_itemx-conf_ctrl = 'X'.
    wa_itemx-ACKN_REQD = 'X'.
    WA_ITEMX-ERS = 'X'.
    wa_itemx-NO_MORE_GR= 'X'.
    APPEND wa_itemx TO it_itemx.

  • Transit time of routes from the availability check

    is it possible to exclude the transit time of routes from the availability check

    Dear Varada,
    no, it is not possible to exclude the route transit time from the availability check process. The ATP process and transportation scheduling are always running together because we have to deliver to the required relivery date. Therefore the availability check always takes into consideration the transportation scheduling.
    I hope, this information helps you a little bit further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Availability Check  in production order

    hi everyone!
    there is a finished product A, whose compoent is B, and A:B=1:1. now, B's stock is 100PC. we created a production order which product A 80PC, and availability check is "all material is availability".
    then we created a new production order, which product A 70PC, and availability check is "all material is availability" too.
    but in fact, B is shortage.
    Therefore, please tell me how I do material availability check?
    thanks!
    DanDan

    Hi Dandan,
    Check RLT mark in OPJJ, (replenishment lead time)
    That use during availability check,during the availability check, the system checks the replenishment lead time.In your case B items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be available.
    Regards,
    R.Brahmankar

Maybe you are looking for