Construction industry doubt
Hi friends,
my company is in the construction industry and are implementing ecc6. they make buildings and facilities for the oil and gas sector.
the general process is that we receive a RFQ from the client, we bid and if we win the bid will be issued a PO.
i wanted to know what will be the SD process(correct me if i am wrong), which i presume will be
inquiry, quotation, sales order with DIP with WBS assignment which will create a WBS in PS or will it be a that once a project structure and WBS once created in PS will create SAles order?
Regards,
Steps to be followed in Construction industry......
1. Once you received the PO u have to create Quotation in T Code VA21.....
2. Then Create Project Structure in PS Module (which includes all WBS elements).
3. Assign WBS element to Sales order Item. (PS module will create WBS, only assignment of WBS has done in SD
4. Create Sales Order With the Ref to Quotation.
5. Create Billing Document.
Thanks & Regards,
Ratish
Similar Messages
-
SAP best Practice for Construction industry in GCC countries
Dear Pals
Pleas let me now the link for the SAP Best Practice document for Construction industry in GCC countries.
Thanks & regards
RajaramHi,
Try the link gien below:
http://help.sap.com/bp_bl603/BL_AE/html/index.htm
Regards,
Amit -
SAP Best Practices for Building construction industry
Hi All:
Is there any best practices available in the building/house construction industry? Can you please guide me through that?
Thank you.
Regards,
- RohanYes they do
Look here:
http://www.simplysap.com/sap-news/sap-articles/sap-adds-60-offerings-family-of-sap-best-practices.htm
http://www.sap.com/industries/eng_construct/index.epx
http://download.sap.com/download.epd?context=D6B5CC86EFFB6EF10CE24BDC2B076371A3E006D336E32EFF63C3CD11CF5450FDA274E617019330E191ABE803C04F532DCFB4A0F8A50E3F32 -
Material master codification & inventory mgmt- construction industry
Hi,
I am designing the process for a client in the construction industry. The implementation will include integration with PS module. The client is working on different projects and the materials requirement for each project differ from the other.
Example:
Though i may have pipe at a broad level, the requirement of pipes is based on the diameter of pipes and this would ideally form multiple material codes.
I want to know, if any of you have come across such a scenario where creation of material master to the lowest level of specification will be very tedious. And also the same material specification may not be used in more than a project.
But at the same time, the client wants to track his inventory based on the specifications of pump received and issued / consumed.
thankshi,
would appreciate any help on this.
thanks -
Constructions Industry - Use of SO BOM
Hi,
We are using ECC 6 and my client is a constuction company.
The company is using SAP material no - material type DIEN and this is entered during SO creation.
We dont keep any inventory as the nature of the business is construction/service.
For example - we have SO - Construction of 2Storey Building - Material No = C2S
There is a template that constitute the activity being done for C2S ( ie: Excavation, Pilling, BackPilling etc) which has its corresponding cost equivalent.
The sum up cost of the activity is the SO price which include some mark up.
At the moment, this activity is manually calculate and outside of SAP.
My client now want to incorporate the template/activity with cost to SAP - the intention is that- when a Sales Order coming in. The template will automatically captured for that order with the corresponding price et..
Not sure but it seems the concept is to activate the BOM.
Pls consider me as totally newbie on BOM, i understand its concept but i dont know how it will be done through SAP setting..
Appreciate if i got the right approach and value all the help of how to achieve it in SAP.
Thanks in advance.
SheHi She,
The requirement detailed by you is a typical requirement, which most of the customer wants irrespective of industry. This requirement cannot be and should not be addressed in SAP logically. The reason being that the cost of procurement will vary. In the example of Construction industry, labour price will vary from place to place withing same city, other charges like electricity consumed will also differ based on service provider, if the site is not easily approachable by regular or large teucks / containers, the cost of transportation will vary, and so on..... This is a part of wish list a client will always have, but it is important to draw a line, beyond which even a development should not be proposed. The value will as it be required to be entered manually on most occasion, as there will be no standard price of procument.
Even if a thought is given for Development, the impact of development on the system, volume of added master data, time to be considered to trigger the event during transaction, feasiablity and system performance also require to be considered.
Regards,
Rajesh Banka -
Hi,
I have 10 years of experience in construction industry.My area of expertise is in project management.I before 5 years I have a strong desire to work in IT industry. But not able to get a chance.But I need a career profile change to IT industry. So I choose to do SAp ps leaning *** certification from authorised training partner. module.please suggest
1. whether this is advisable.
2. Whether I need to resign from my current job.
3. What salary I can expect from SAP job profile, as my current salary is 7 to 8 lacs.
4. Whether I will get a job immediately after certification.
5. Howmuch SAP PS certification Job requirement in market.
Please advise.
Thanks,
PriyadarshanHi Sama,
Kindly go through below link and all you questions will be answered.
Career Center
Regards
D.Singh -
Construction Industry Scheme (CIS)
Construction Industry Scheme (CIS) was part of the Oracle Public Sector Financial module. According to Oracle this is now included as part of Oracle Financials v11i. Can anyone confirm that the CIS functionality is included in 11i? Has anyone been involved in implementing CIS functionality in 11i?
ThanksCIS remains a part of OPSF and will be available with the launch of 11.5.2
There has been talk of this being absorbed
into the core product but as far as I am
aware this is still only talk.
The only part, so far, of OPSF which has
gone core in release 11i is Gross Based VAT. -
Reg: Construction Industry Blue print
Hi Experts
I need User Manual, BBP & con.docu for construction industry.
also i would liketo know which cost planning is appropriate one.
How to link with SD
clinent requres subcontracting cost month wise.
pl help me in the above aspects
Thanks
kumarHi,
It may help you.
http://help.sap.com/saphelp_sm40/helpdata/EN/45/f6da633a292312e10000000a11466f/content.htm
Regards
Chandra -
Construction Industry Variation Orders?
I am working for a construction company. We are using SAP ecc6 (EHP5).
We have service purchase orders which represent contracts with suppliers. The purchasing documents are subject to release and the number of release codes depends on the value.
We have a requirement to handle "Variation Orders" against this contract and the variation should also be subject to release procedure on its own value. We have added complication that we can have negative value variations.
Each variation should have an associated print document detailing the value of the variation.
Does anybody know of any functionality to handle variations in construction industry?
thanks
KevinCIS remains a part of OPSF and will be available with the launch of 11.5.2
There has been talk of this being absorbed
into the core product but as far as I am
aware this is still only talk.
The only part, so far, of OPSF which has
gone core in release 11i is Gross Based VAT. -
Material Groups for Construction Industry
Dear All,
I would like to know some examples of material groups which were used in Construction Industry. Please provide some examples.
Regards,
S.SureshHi Suresh,
Some of the material groups for construction industry is follows
Cement, Steel (May be two as Structural steel, Reinforcement steel), Aggregates (like sand, blocks, flyash, gravel, metal etc), Admixer chemicals, Plumbing material, Sanitary material, Scaffolding material, Doors, windows & ventilators, Paints, Pipes & fittings etc.
Thanks & Regards,
VB -
i have worked on EC & O mapping BOS and Real Estate sales but now we have another construction company approaching us for the following.
Negotiating contracts for sales-based rent
Managing sales reports
Calculating and settling sales-based rent
Categorizing of service charges incurred
Time-dependent apportioning of costs based on flexible measurements (fixed values, consumption, percentage share,and so on) or based on conditions in the contract
Time-dependent settlement participation of objects with the ability to exclude individual objects when assigning higherlevel objects
Clearing of costs that are not directly apportionable to the tenant
Determination of vacancy costs
I would like data on the same in Help or otherwise plss do assist me with the same. Thank you for your time.
Regards
maddy
([email protected])Maddy,
Most of the functionality you mentioned is in the RE-FX module under Sales-based Settlement. Link to section in help portal http://help.sap.com/saphelp_erp2005/helpdata/en/77/d92ed1b79bbe4f9a79cc4dd9e4c449/content.htm
I believe there are also some standard IDES scenario scripts that show this functionality. In addition in the SAP Help Portal -> SAP Best Practices -> Industry Packages -> Professional Services -> V1.600 Localized for US -> Business Information -> Preconfigured Scenarios -> Commercial Real Estate...there is a scenario called Percentage Rent Lease. This is same as Sales-based lease and related process, and provides a business oriented step-by-step example of process and set-up.
Best regards,
Kay Werner -
Help on scenario in Real estate/Construction industry with PS,SD,MM modules
Dear Gurus,
Iam into implementation of a Real estate/Construction company (FI/CO,SDMM<PS modules). But we are NOT using SAP RE-FX or Homebuilding solutions (HBS).
My Client's business scenario goes like this.
There are two broad divisions:
Residential properties:
They are going to build 840 flats (divided into 14 blocks with 15 floors in each block) with amenities like club house, parking facilities etc. The flats will be sold to customers.
Commercial Properties:
Commercial building is divided into 60000sqft for hotel construction and 40000 sqft for retail space which includes 2 small theatres.
The commercial complex will be retained by the client.
Three types of residential properties will be built
1. 4 blocks of 2 bedroom flats
2. 5 blocks of 3 bedroom flats with 2 toilets attached which will be termed as 2+1.
3. 5 blocks of 3 bedroom flats.
When the customer is enquiring about the FLATS, i have to check the availability of the same.How to do this?
Iam considering the flats as FINISHED GOODS, So How do I get those into the stock without doing intial entry using 561?( no PP module here)Is is possible to relate the stock through PS module?
Please give your valuable ideas on this.
Regards,
AnbuHi
From the requirement and design planned, your each flat will be different material. If this is so then whatever material is blocked or not for sale or closed or open you can define te material sales status accordingly. hence if the status is other than released then they will give error and that information will be useful.
If u have lot of flats which are look alike and hence any allocation of flat to any customer is ok then product allocation cab work.
Product allocation can work good when the material has characteritics of interchangeablitily and standardization.
No flat can be same. Eventhough u have same sq ft area same the location according to vastu and east west direction etc criteria will be unique and hence using product allocation wil result into any one flat being allocated to customer which is not desirable.
hence according to me you can have materials with different status and that will suit ur purpose.
Reward if helpful
Kind Regards
Sandeep -
Oracle Projects WBS and Construction Industry Projects
Hi, I would like to hear from anyone who can share example Work Breakdown Structures for Construction projects (e.g. high-rise commercial buildings, etc).
We currently have a process where we manipulate a Bill of Quantities in a spreadsheet and upload that in a summarized format (as a series of Trade Packages,etc) to Oracle. There is then a process to create the WBS and the Budget.
My query is around whether anyone has an alternative WBS-style for projects in a construction-oriented company. Because our WBS is based on Trades, it can get extremely long and unwiedly. Example below:
0.TP0430 Concrete Supply & Place
0.TP0431 Precast Concrete
0.TP0610 Reo Supply
0.TP0620 Reo Fixing
etc, etc.
thanks,
Mike.Hi
When your invoice method is WORK (Time & Materials) you must run the process GDR (PRC: Generate Draft Revenue) before you run the process GDI (PRC: Generate Draft Invoice). That is because only the GDR process is calculating the billing amount and creates the RDL (Revenue Expenditure Line) for the Expenditure Items. Later on the GDI process select all un-invoiced RDLs and group them into the invoice lines.
When your invoice method is based on Events then GDI picks all un-invoiced events. It is not required that events will be included already in a draft revenue. Therefore, in that case the order you run the GDI & GDR processes does not matter.
Dina -
Real Estate Construction Industry--Help required
Hi,
Can you please suggest the detail help available if any to map a typically retail construction scenarios which includes steps such as
Customer Enquiry
Customer Negotiation
Customer Booking
Agreement with customer
Follow up of payment as agreed against selling of property
All subsequent processes and approach in this typical business process.
Has SAP got any solution designed for this type of business.If so request you to send me the link or whatever material availableto read
Thanks in advance
Regards,
manOOHi Mano,
Please go through the following link.....
http://help.sap.com/saphelp_45b/helpdata/en/fb/13592b457311d189440000e829fbbd/applet.htm
Regards
Ahmad Ali Shaik -
UK Construction Industry Scheme (CIS)
Hi All,
I have a question regarding the changes to the UK CIS scheme that became relevant in April 2007. I have been informed that the expiry date (Exempt To) for the CIS certificate is no longer relevant as all vendors must now be checked via HMRC.
However the date appears to still be checked in our system in relation to making the correct CIS deductions, we are on R/3 release 4.7 SP 25.
Does note 1003730 change the behaviour of the system to prevent checking of the exmept to date?
Regards
ChrisAnyone any ideas?
Maybe you are looking for
-
Mail.app not downloading email from one person
Hi I am using Mail.app (v2.1) on 10.4.8 with a mac.com email address setup and am having problem receiving emails from just one person - that's right only one sender. What happens is, the person sends the email and it arrives at the webmail interface
-
Automatic Inspection Lot Creation for HUs (storage Loc.) in WHS
Hi All, can someone guide me through customizing/with end result expected from client. How can I setup this configuration. The requirement is all Chem.Raw Materilas are subject to Quality inspection with HU managed storage Loc. with WMS. Good Receipt
-
Publish Options for Decision Paths?
Hello! I'm currently using UPK 11, and I have several topics that have multiple decision frames. I've been using alternate decision paths frames to show alternate ways of performing operations in my application, and it seems to be going well for when
-
How to load both 32 bit and 64 bit version of addon on same machine
Hi, When deploying an addon using SAP Business One Extension Manager, how can we install both 32 bit and 64 bit version of the addon for same machine? If the OS is 64 bit, SAP allows to install and use both 32 bit SBO client and 64 bit SBO client. I
-
I have a new computer with windows 8.1. How do I reinstall Adobe elemnet and premire 10?