Consume budget from upper level fund center

Hi ,
PSM-BCS / ECC6.00
I have created a fund Center Hierarchy,
I have defined Level 1 fund centers as Budget address and level 2 & 3 fund centers as posting address. I want level 2 and 3 fund centers to consume the budget of level 1 fund center.
what settings are required to make the above scenario work. Also the otherway, can i restrict  level 2 or 3 fund centers from consuming budget assigned to level 1 fund center.
I don't know if this is a right approach. Please advice how can i make this work.
Thanks
Shekhar

Hi,
I have created a strategy for derivation of Budget address and assigned it to the Budget Structure.
Derivation RULE
Fund Center --> Fund Center
FC-B (level 2)  =  FC-A (Level 1)
FC-C (level 2)  =  FC-A (Level 1)
Then I have maintained budget for Fund/FC-A/Committment Item in FMBB.
But when I am posting(FB50) to FC-B, i am getting an error "annual budget exceed for Fund/FC-B/Committment.
Do I have to do some other configuration or reconstruct or reinitialize or any other steps I should to do?
Please advice.
Best Regards
Chandarshekhar Y.

Similar Messages

  • Not able to display the Installation Base of once it unassigned from upper level Installation IBase.

    Hi All
    I am working on IBase scenario for my client, I am new to the IBase scenario. Here we are creating installation base for two to five levels of product.
    Once we create IBase for lower level then this IBase is inserted in upper level IBase. Like this we assign all levels based on product.In some cases we need to unassign any of IBase from its upper level IBase. When it is unassigned we are not able to display the IBase which unassigned. When it is unassigned from upper level how come system not able to display this IBase. If we speak functionally the part (IBase) which is unassigned should be valid to assign in any other upper level IBase in feature.
    The error I am getting for above is
    Serial number XXXXXXX for material XXXXXXX does not exist in any IBase
    Message no. IQ122
    Diagnosis
    Serial number BMF3000106 for material S24-D5022-C100-6 does not exist in any installed base on 31.03.2015 at 10:22:09.
    System Response
    The system cancels processing.
    Hi experts please suggest.
    Regards
    Kesava

    Hello Kesava
    Can you please explain in detail what exactly you are trying to do while assigning and unassigning Ibase.
    Regards
    Naresh

  • Org Level, fund center/cost center level restriction for tcodes????

    I am looking to see whether org level restriction and cost center/fund center level restriction is possible for certain set of transactions.
    I am using USOBX table for this analysis. This table has a check flag field ( same as in SU24) which says whether the Tcode (program) does the authority check for certain auth objects. Example- X (checked but not maintained in USOBT). This table pulls up several authorization objects under the 'X' category. However, when I do the System trace for the same tcode, all the objects (marked as X) are not captured. Instead only a few are captured.
    Can we rely on the USOBX data or should we do system Trace for every tcode. I am just pulling a report and not creating roles at this point. So trace is time consuming. But data reliability is equally important.
    My objective is to verify whether org level and cost center/fund center level restriction is possible or not for some tcodes.
    Do you have any suggestion to achieve this faster (through USOBX or any other means)?
    Thanks in advance
    Kee

    I would suggest you to check USOBX_C and USOBT_C instead of USOBX and USOBT as it will have your customization as well and not just the standard ones given by SAP.
    Also when check field is X ...it means the object is checked but not maintained for the t-code as you already said but I am not sure how much it will help you as the they will not be pulled by PFCG when you are creating the role until you change the object to Check / maintain . When you do that the check field will be Y and not X. So basically it is the Y one which you need to see.
    Going for trace is time consuming for every t-code and I am not sure if it really needed. When your roles are in testing phase and are tested by the functional team or the team which needs it and if they are missing some object, you can run a trace and find the missing object....
    I am not sure on what basis you want to change some field to Org level ...but typically it is done if you want to do segregation of roles based on these org level. There could be various other reasons and it is better to talk to your functional counterparts before changing a field to Org level.
    for ex : If you want to segregate on company code, you will create co. code as Org level and create roles for different company code.

  • Converting Cost Budget From Plan level Type to Project Level

    Hi There ,
    I am Working on Project Accounting in Oracle apps .Perviously we used to create projects using oracle forms now we have created the OA pages for the same and using them to create the projects .
    Thus Cost budget done by using forms will be at project level and Cost Budget done through OA pages is at PLAN TYPE .
    And my problem is , I want to convert PLAN TYPE cost budget to PROJECT LEVEL cost budget. Do any body know how to do it , I know that we can convert project level to plan type by running one request , is there any such request to solve my problem.
    Please help me
    Thanks

    Zafar,
    What exactly ur looking for, can u explain in oaf terms, as this is a oaf forum.
    --Mukul                                                                                                                                                                                                                                                                                       

  • Controlled budget execution only fund center

    Dear gurus,
    I have the following situation, the budget prepared by the fund center and COMMIT ITEM, but the execution needs to be controlled only in the fund center, Regardless of the commit item
    Any help is welcome
    Thanks

    Hi,
      The need and the following:
        Budget made the Fund Center: 1XAD345
                                    Commit Item:  3456 - 2000 Materials
                                    Commit Item:  4564 - 2000 Consumption
                         Total Fund Center: 4000
    When making a purchase requisition, request or posting in FI will
    as follows:
    Fund Center: 1XAD345
    Commit Item: 3456 - Materials - 2500, or I blew the
    Commit Item: but respecting the ceiling of the Fund Center.
    After a request to consult the reports of FM would be as follows:
    Fund Center = Balance:
             4000 - 2500 = 1,500 available for new spending
    Thanks

  • Funds Management - Current budget Vs Consumable budget

    Hello -
    I have posted a budget entry document with budget category 'payment' and posted few commitments and actuals , when I run the Budget Consumption oveview report - budget amounts  are shown under the column ' Current Budget' not under consumable budget and nothing is shouwn under consumed budget as well. Where as I have posted an entry document for budget category ' Commitment' earlier, thats being shown under consumable budget and all budget consumptions are recorded. Both the entries are made with one document type which is assigned to 'automatics release'. I am using update profile 102 - PB , inv, posting date. What is that i am missing ?
    Thanks in advance
    CHris

    Hi Chris,
    I suppose that you are using BCS, if not, kindly let me know.
    Can you please inform your EA-PS package? In addtion, can you please confirm if the report that you are using is transaction FMRP_RW_BUDCON? If you are using this one the value columns of this report are the following:
    Consumable Budget =  from availability control
    Consumed Budget =  from availability control
    Available Budget = Consumable Budget - Consumed Budget
    Current Budget = from budgeting
    Commitments and Actuals
    Therefore you can check each field with the table values.
    For AVC fields (that check the value from availability control) you should check the value from the report in table FMAVCT.
    Current Budget from your budget transaction or reports.
    Commitment and Actuals from table FMIT.
    Let me know your comments about these information. I hope it helps you.
    Best Regards,
    Vanessa Barth.

  • Funds management - no effect of distribution in funds center

    Hello,
    I am trying to transfer the costs from common cost centers(1000) to 2 other cost centers (1001), (1002).
    I have written a derivation to pick up fund center A when profit center is A, fund center B when profit center is B.
    commitment item as 400035 when GL account is 400035, and to pick commitment item as 400035 when cost element is 400035.
    I have assigned a budget of 80,000 for commitment item 400035 in fund center A. cost center 1001,1002 is assigned to profit center A, and cost center 1000 is assigned to profit center B.
    when i post an invoice in GL 400035 for 80,000 the budget is consumed for 80,000 in fund center B for commitment item 400035.
    Now, when i distribute the cost to cost center 1001 and 1002 in 1:1 proportion from cost center 1000, there is no effect in fund center A even though it is receiving cost of 80,000 from fund center B.
    Any inputs on possibilities of an error that i could have made would be appreciated.

    Hi,
    What do you mean by 'cost distribution'? Is it internal CO document, e.g. KB11N? In this case, you have to switch the integration in FM with CO, so these transactions would have effect on FM tables.
    Regards,
    Eli

  • Fund Center and Commitment Item

    Hi All ,
                What is the Fund Center and Commitment Item also the use of it.
    regards
    sunil

    The fund center is the budget which is issued by the managemnet for the specific area (cost center) . The same will be released in each periodical wise as per decision taken.
    Example Maintenance team has one fund center. So all the times for his expenses the fund will be deducted from provision. Basically it is linking with cost center.
    The commitmenet item comes under the fund center. It menas that you may have repair& services, Labour charges, spares etc. each commitment item has own budget value under your fund center. exaplme if you are taking the spares your spares budget will deduct.
    I think u got something, but for explation here is not possible since its big subject.

  • Fund Center Hierarchy was messed

    Dear all FM expertise,
    I don't know what happens with the Fund Center Hierarchy. I test create fund center and delete fund center. I don't know what happens to the system then now i can't recover the fund center hierarchy. When i use transaction FMSD , now the status of all fund center (excluding top fund center) is no assigned (red label) and is in the same level as top fund center. when i activated it and move it to the right place, the system gives error as "Function not allowed: Budget was assigned for funds center ..." . I check the individual fund center, the hierarchy set is correctly. when display the hierarchy, shows only top fund center. I tried to activate it and save but the system shows Error in the ABAP Application Program.
    Have anybody a good advice?

    Hi,
    I am not sure how familiar are You with sap internal functionality and if it is allowed to use it just so. Look e.g. in the thread
    https://forums.sdn.sap.com/click.jspa?searchID=6455527&messageID=3489098
    Be very carefull with the table fmhisv - if one hierarchy "connection" looses, the hierarchy will be missed. It is very important that parent,next and sibling have correct data in this table. Perform the editing just on Your own risk.
    Good luck
    Alexey

  • Derivation of Funds Center from cost center for Asset PR/PO in FM

    Hello Experts,
    We configured new FM area and relevant BCS settings. It is working fine except PR or PO for Account assignment category A.
    Issue: system is not able derive funds center from cost center in the asset master. cost center is not updated in EBKN table for Asset PR.
    we have maintained the following;
    1. Funds center is activated in Asset account assignments
    2. Maintained derivation rule with function module: FMDT_READ_MD_ASSET
    3. Derivation rule for cost center to funds center also maintained
    If maintain funds center manually in PR it is working fine and consuming budget also.
    Requirement: How derive funds center from cost center assigned in asset. I have verified all tickets raised in this forum, but nothing has answered my question.
    Request you to provide solution for above issue.
    Thanks in advance for support.
    Regards,
    Chalapathi

    Hi Venkata,
    You have two derivation rules, first related to Asset function module and second one is related to CC and FC combination.
    You need to maintain the function module derivation rule first then you need to maintain the derivation rule related to combination of CC and FC. Because first you need to derive CC from asset master and then you need to derive fund center with reference to this CC.
    Regards,
    Ankit Agarwal

  • Item 010 Fund Center/Commit Payment Budget Exceeded (FM)

    Hi Expertise,
    Our user executing FMJ2 transaction to carry forward purchase requisition (PR) / Purchase Order (PO) from 2014 to 2015 (April to March) by that time getting the below error message, but budgets are available for 2015.
    Item 010 Fund Center/Commit Payment Budget Exceeded
    Another user also facing the similar issue while create new PR in the current FY-2015 with different commitment item & fund center, still getting the same error, but budgets are available for 2015.
    Kindly share your views and ideas, its urgent.
    Thanks,
    Jammy

    Hi Jammy,
    Please check the following hints about this matter:
    1) To be on the safe side, please run report RFFMRC04 in test mode, to see if there are differences between the line items and totals table.
    If errors arise, please run it in update mode, whithout other budgeting/posting activities occurring at the same time (otherwise you may encounter differences). Then, please reconstruct the AVC totals (FMBV for Former budgeting, FMAVCREINIT for BCS).
    2) Reassignment during fiscal year change also uses the Derivation strategy for reassignment (transaction FMYC). Please verify if you have defined in FMYC a different FM account assignment (funds center and commitmente item) than the one that you are expecting.
    I am not sure if you have Former Budgeting or BCS, therefore consider also the following:
    3) IF you are using Former Budgeting, I guess you are getting BP629. Please check report BPINDAN2_NEW and  if the 'Assigned budget' is same as the 'Commitments/actuals' the values are ok and budget is missing. If the values are different, you must run report BPINDX03 (FMBV) first to correct it.
    4) IF you are using BCS, I guess you are getting FMAVC* message. For this, use transaction FMAVCR01 to verify your budget consumption and make sure that the budget was updated for payment budget not commitment budget (as per the error message that you are receiving).
    5) Please check how this UOM (unit of measure) is defined in transaction CUNI.
    In this transaction, you can set the Value-based commitment indicator.
    This indicator controls whether commitments for the chosen unit of measure are
    recorded on a quantity basis or a value basis. If the indicator is not set, the
    commitments are managed on a quantity basis. If you set the indicator they are
    managed on a value basis.
    For value-based updates, the reduction of purchase order commitments occurs
    with the maximum of goods receipt and/or invoice value. For
    quantity-based commitments, the reduction of purchase order commitments occurs
    with the maximum of goods receipt and/or invoice quantity.
    Example:
    You create a purchase order with the quantity of 1000 at the price of 10.
    You post a goods receipt related to this PO with the quantity of 500 at the
    price of 9.
    For value-based updates, an amount of 4,500 is updated.
    For quantity-based updates, an amount of  5,000 is updated.
    I hope this helps.
    Regards, Vanessa.

  • Bdget Transfer from One Fund Center to another Fund Center

    Dear Frieds,
    I can able transfer the negative budget from One Fund Center to another Fund Center which is wrong and want to control the same.
    I can use the SAP Note:983853 but still finding the same error.
    can any one please help me to restrict the negative transfer of One Fund Center to another Fund Center.
    Thanks and regards,
    Mahendra Dev.

    Dear Eli,
    Thanks for your reply.
    I will explain what config I did in my system.
    Step 1. DEFINE KEY FIGURE - ZZCURRENT_BUDGET followings are the properties
    Plus/minus sign     version     category     value type     activity     budget type     WF status     fiscal year
    +                            0      9F         B1     ENTR          *          P           -1
    Step 2. DEFINE CHECK LIBRARIES FOR BUDGET ADDRESS - Create a new consistency check copying 0000002
    i. PREREQUISITE  u2013 Leave Blank u2013 not able to understand what validation need to put.
    ii. CHECK             -  Left Operand- Key figure - CURRENT_BDGT_BT
                                   Scaling factor u2013 100.00
                                   Operatoru2013 Greater than or equal to
                                   Right Operand u2013 Key figure - ZZCURRENT_BUDGET
    iii.MESSAGE       - Message Class u2013 FMCC
                                 Message Type u2013 E
                                 Message Number-001
    Step 3. ASSIGN BUDGET ADDRESS CHECK LIBRARIES -  Created Library can assign here.
    Kindly let me know were I did the mistake in my config.
    Thanks MD.

  • Budget carry forward- giong up in the fund center hierarchy

    Hi,
    We are about to close year 2008 in the FM. We work with the former budget, and we don't have budget structure.
    When carry forward the commitment u2013 the receiver is the same as the sender.
    But, when I carry forward budget for commitment, the receiver is the upper fund center in the hierarchy.
    The budget is not where the commitments are.
    What can I do?
    best regards,
    Edit.

    Hi,
    The budget of year 2008 was entered at the subordinate FC.
    If there is budget in year 2009 at the subordinate FC, the budget carry forward is right (the sender and the receiver are the same).
    Only if there is no budget on the subordinate FC, the budget runs upwards the hierarchy.
    Thanks,
    Edit.

  • Fund Center budgeting

    Hi Gurus
    Can anyone guide me how to implement Fund Center wise budgeting in Funds management.
    Also, my requirement is to transfer the Cost Center planned values in KP06 to the fund centers.
    Requirement is in the production and very very critical. Immediate suggestions/guidance will be of great help.
    Thanks
    RK

    Dear Praveen,
    You can give commitment wise Budget in FMBBC. If you want release for every month, you have to remove the automatic release in configuration and for monthly release of the same, the user has to manually release required budget against the fund center. We can't configure the monthly release of budget automatically becoz the system doesn't know how much each fund center want to consume.
    Check with Technical team if they can create any programme for automatic release of predefined budget on monthly basis.
    Regards
    Anil Kumar

  • Unable to derive funds center in F-90 Asset purchase from vendor

    Dear All,
    I have maintained the fund center value in the asset master and also maintained the derviation rule in FMDERIVER for a combination of Cost Center > Funds Center.
    When i try to post asset purchase using F-90 t-code, it is asking me for funds center in the asset line item. The system is not deriving the value from asset master or derivation rule maintained. I am unable to maintain the funds center in the posting as the field is grayed out.
    Request you to kindly provide your valuable suggestion.
    Best regards
    Abishay

    Hello,
    The fund center has to be activated for Account Assignment Type 01 (APC Value Posting)                                                                               
    Maybe note 437076 could help to check the settings in the following IMG activity :
       Activate the account assignment elements for each transaction and 
       account assignment type:                                          
       Asset Accounting -> Integration with the General Ledger ->        
       Additional Account Assignment Objects -> Define Account           
       Assignment Types for Account Assignment Objects                                                                               
    I hope it helps,
    Hélène

Maybe you are looking for

  • BP flow from CRM to R/3

    Hi Gurus, Iam replicating the master data from CRM 5 to ECC 6, iam getting the following error for the BUPA_MAIN "Runtime error MESSAGE_TYPE_X has occurred" it is very urgent. Can anbody help me out

  • Entries on non-leading ledger do not appear in BSEG

    Dear experts, We are running on ECC6 with the parallel ledger option (i.e one leading ledger and one non-leading ledger). When posting directly to the non-leading ledger, table FAGLFLEXA and BKPF are populated but not the table BSEG. Is there an expl

  • Connection/Network encryption in Oracle Standard Edition 11gR2

    Does the Oracle 11gR2 Standard Edition support any network encryption for SQL*Plus or JDBC thin clients? I don't have "Oracle Advanced Security" installed, is this required to support any encryption of data send across a network?

  • Can you use photos from outside of iphoto or aperture?

    I now use Lightroom as Aperture is painfully slow so Albums are folders in the Pictures folder. iWeb appears not to let me drag a folder into an Album page. Will I need to fire up Aperture again?

  • URL Redirecting.

    Hi All, I am having one issue that is if the user types http://xxx.yyy.com it has to redirect to one application and if the user types http://xxx.yyy.org it has to redirect to another application. I guess we have to configure in Tomcat Server to perf