Consumptin Account Required for Production Order

While i am creating production order in CO01, it is showing the following error.
Consumption account cannot be determined
Transaction                            :    GBB
Valuation / acct modification  :     /AUF
Material / valuation class        :     (Finished Product) /7920
Why should we assign consumption account for valuation class 7920. Where i am doing mistake.

I had faced similar error y'day.. message that say's 'consumption account'  is really misleading.. but, i think system is checking this account assignment upfront while creating the order. basically GBB/AUF assignment is required for 101 of FG/SFG material after production..
so, just assign a p&l account to VC 7920 and create the order it would be good..
Regards,
Sayujya
Edited by: Sayujya Patil on Jul 1, 2011 3:06 PM

Similar Messages

  • INBOUND FM is required for production order confirmation ( CONF21 )

    Hello,
    Can anyone tell  me the name of the stadard inbound FM(used in processing inbound IDOC) used for order confirmation .  CONF21 is the idoc type being used.
    Thanks.
    Krishnakumar

    Hi,
    Iam not sure,try this
    KK2A_GET_DATA_FROM_IDOC
    Regards,
    Raj.

  • Function module to calculate capacity requirements of production order

    HI
    Hav a requirement to calculate capacity requirement  for production orders like we see in cm50... does anyone know a function module to calculate capacity requirement?

    Hi All,
    Just to reopen this issue, even I am looking for a similar functionality.
    To reinstate the requirement:
    I want to find shifts and corresponding capacities for a work center. These details are obtained from CR03 and CR13 transaction.
    If possible do let me know Function module or tables for the same.
    Debs

  • Actual activity price calculation for production order

    Hi
    Can any one guide me in how many ways we can assign actual activity price calculation for production order?
    I knew only one way by assigning PPP2 costing variant?
    I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
    regards,
    Ramesh B

    Dear,
    Costing variant PPP2 is linked to some valuation variant inn OPL1
    System will check the valuation of material and activity according to this valuation variant
    For material valuation there are many stg acceding to which system will take the price the raw material,
    Valuation strategy for material component
    Strategy sequence that determines the valuation of the materials used in the cost estimate.
    Use
    The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
    Procedure
    You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
    Examples
    Assume that the following strategy sequence is entered for material valuation:
    1. Planned price 1
    2. Standard price
    3. Moving average price
    If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
    If the system does not find a value, the value in the Standard price field (accounting view) is used.
    If the material does not have a standard price, the system uses the value from the Moving average price field.
    if you have not mentioned, then system will give error that "valuation stg not found"
    Valuation strategy for internal activities and processes-
    Strategy sequence that determines how internal activities and processes are valuated in costing.
    Use
    The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
    Procedure
    You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
    Examples
    The following strategy sequence is entered:
    1. Actual price of the previous period
    2. Plan price of the previous period
    3. The most current plan price
    If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
    If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
    Again if you have not mentioned, then system will give error that "valuation stg not found".
    You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1

  • BAPI for Production order creation against wbs element

    dear all,
    I am using BAPI (BAPI_PRODORD_CREATE) for Production order creation against wbs element.I am putting following input paramters in this
    material no,
    order type
    plant
    qty
    basic start dt & end dt
    wbs
    But during GRN it is not taking the account assignment as project stock i.e. its picking movement type 101 but it should be 101Q.
    For this what changes are required.
    regards
    ravi arora

    Hi,
    2 options i can think of:
    1. Create a BDC program by recording co10
    2. Create a planned order with order type PR using BAPI_PLANNEDORDER_CREATE, specify the WBS element & other details. Now use BAPI_PRODORD_CREATE_FROM_PLORD to create a production order with reference to the planned order created earlier.
    I believe option 2 should meet your need. Check & revert.
    Regards,
    Vivek

  • Report for production order with actual and target cost for each

    Hi
    Is there any report that gives me the list of all production orders in a month with its respective actual and target costs?
    I can use COOIS to get a list of production orders, then double click on the prod order, then click on goto and then to cost analyis.. but can i avoid going through all this and get a report with the details i need?
    thanks in advance

    Thanks a lot for that.
    I'm a little confused with the columns in the report.
    Which columns should I keep for my requirement? -
    Production Order
    Total Target Cost
    Total Actual Cost
    Total Actual Qty
    Total Target Qty
    Thanks

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • IDoc Configuration for Production Order Creation and Change

    Hi All,
    Please Help me out for IDoc Configuration for Production Order Creation and Change
    I have found the IDoc for Production Order
    Messgae Type : LOIPRO and IDoc type : LOIPRO01
    Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
    I have done following Configurations:
    1. RFC Destination created for XI system
    2. PORT was created for XI
    3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
    I need to know how to do the followning.
    1. How do i configure the outbound Production order idocs when Production Order is created or changed.
    2. in NACE (Output control) which is the Application for Production Order.
    3. How can I set IDoc as output Type for Production Order Creation.
    Thanks in advance
    Dhanabal T

    Hi Michal,
    I know that it is the old thread but still want to get clarified from you out of curiosity.
    Unlike other IDOC, i actiavated change pointers for LOIPRO
    1.message and idoc type is linked
    2.function module , message type , idoc type is linked
    function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
    3.BD64, distribution model is created and distributed
    4. port and partner profile is in place.
    5. IDOC is not getting generated after creating the process order.
    do we need to activate the change documents for the message type in BD52,
    if yes can you please provide the object types for the same.
    or i am missing something else. please guide me in this regards.
    Thanks in advance for your time.
    S.Janagar

  • System status for IDOC creation and processing for production orders

    All
    I am creating IDOCs for production orders to send requirements to an external WM system for kitting execution.
    I need to know whether there are any system statuses to notify me when an IDOC has been created,failed and processed. If not, how do I go about creating user defined statuses for these statuses.
    Second question, which idocs should I use to confirm, teco and cancel the production orders from an external system?
    Thanks
    Evan

    HI Evan
    u can use the standard program - RBDMOIND scheduled in back ground to update the Idoc staus ,
    this helps to update the IDoc Status from
    '03     Data passed to port OK  '  to
    '12     Dispatch OK'
    status 03 indicates the IDoc is successfully transmitted to Communication Layer and the Status 12 helps to confirm the data dispatch to the receiving port.

  • Transfer Order not created while performing GR for Production order

    Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
    Let me give you a brief background.
    This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
    Supply area is created for WM location.
    Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
    1) Now when the Kanban is set empty a production order is automatically created.
    2) Once the production order is confirmed the material automatically shows up in the bin.
    A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
    3) *PROBLEM* - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
    Following are the settings which I have already checked:
    1) In IMG, WM movement type 103 has auto TO indicator set.
    2) IM-WM interface for 102 movement type and 103 movement type is maintained.
    The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
    I would really appreciate if anyone can help me in this.
    Thanks

    Hi Mike,
    I do not know this function in SAP, so these are just my ideas:
    1.
    System does not create a TR or a TO. the material automatically shows up in the Bin.
    I think it's a normal SAP behaviour. If you do GR against a PO the quant(s) will appear in interim storage bin w/o TO. The TO is to move the quants from one bin to another, but in this case the quant comes from 'nothing' and arrives at the bin.
    If you make confirmation and consume the components refering to a PrdOrd, the components will disappear w/o TO from storage type 100 + dynamic bin, because there's no TO that could move them from dynamic bin to 'nothing'.
    So, these 'movements' are to change the WM stock level and TOs are not designed for this.
    2.
    There's difference between auto creation of TO and immediate TO creation. Please check what SAP help says in case of TOs for outbound deliveries:
    http://help.sap.com/saphelp_47x200/helpdata/en/c6/f8406c4afa11d182b90000e829fbfe/frameset.htm
    3.
    Now when the Kanban is set empty a production order is automatically created.
    So, if you remove the stock from the Kanban it triggers the creation of a PrdOrd. This is very logical in a Kanban system because it is a pull system. but your problem is not this, it's clear.
    If you just created an automatic TO and would remove the stock from Kanban-bin, a new PrdOrd would be generated, and so on. As many times you remove the stock a new PrdOrd is created and this might be the reason why no TO is crated automatically. In this case this would be a push system and not kanban system.
    I do not know this process but if we concentrate only on the pull system, maybe this Kanaban is to store the FG until an event (e.g. shipment) should trigger the stock removal from this bin. (just my assumption)
    Please try to mark the TR creation for the movement type w/o auto / immediate TO and tell us the result (whether you get the TR if you confirm the PrdOrd).
    Regards,
    Csaba

  • Bapi or FM or tabel or any standard transaction code for Production order linking to get child production orders based on parent production order

    Dear Guru's,
    we have a requirement i.e. user can convert planned orders in to production orders (CO41) based on those production orders we can get Route card( Z Smart form)  presently we are using manual input for that Route card. recently we got requirement for this i.e. make to automatic generation of route card for this requirement we need to get the list of child's production orders based on parent production order
    so as per my requirement i need to get all child part numbers production orders based on parent production order number and quantity i tried in MD4C and CO46 but those transactions codes are picking multiple lines also so for this requirement please give your valuable suggestions
    Regards,
    Venkat 

    Dear Friends,
    Thanks for your reply,
    My business process is MTS purely strategy 10, for route card all components with production orders we can give input as like bellow these production orders are converted from planned orders,between few components are don't have production orders those are F-30 materials,because of this reason i need link for production order to child components orders
    01
    IND1
    IND1
    A1CE2003520103-005
    55685815
    02
    IND1
    IND1
    A1CE2003520103-010
    55685814
    03
    IND1
    IND1
    A1CE2003520103-015
    55685813
    04
    IND1
    IND1
    A1CE2003520103-020
    55685812
    05
    IND1
    IND1
    A1CE2003520103-025
    55685811
    06
    IND1
    IND1
    A1CE2003520103-030
    07
    IND1
    IND1
    A1CE2003520103-035
    55685810

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

  • New Document Series for different locations for Production Orders

    Hi Experts,
    I have came across a scenario where we have to setup different Document Series for Different Locations. Actually the Company is having 2 units . First one is the factory itself and the second one is Subcontracting Unit to which the company sends the job work order . But there it wishes to track the productions processes and the Stock tracking Warehouse Wise for
    this Second unit also . As Such I have created 2 locations and one warehouse for (RM,SFG,FG) for both the units.
    The obvious requirement here is to maintain different Document Series for Productions orders for both the units .
    Please guide me about how to overcome this scenario.
    Thanks and Regards,
    Pooja Singh.

    Hi Pooja,
    Yes. You can maintain different document series for production Order or any documents depending upon your business scenario.  Let's say, you need to maintain Production orderu2019s of job work and sub contracting.
    You can define this under Administration>System Initialization> Document numbering.
    Select Production orders--> let say Factory first number 1, last number 199999, select current period indicator and update. Similarly for the subcontracting, in the name field, "work order", first number as 110001 or the way you desire, and then the last number.
    Reards,
    Senthil Maruthappan.

Maybe you are looking for