Consumption acct of materia which issue to maint. ord. and production order

Hi all,
I have one problem with the cost report for maintenance orders.
I have one material code, such as we call A.
Mat. A is issued to production order and also maintenance order.
For production order, consumption account is 123
For maintenance order, consumption account is 456
I have defined new movement type for issuing to Maintenance order is ZB1
in OBYC:
      GBB - VRB --> 123
      ZB1  --> 456
So for accounting purpose, I can slit these consumption accounts
However, when  I go to maintenance order cost reports, systems slit these cost into 2 line
Material  A        Acct. Cons 123        Plan cost 100        Actual cost 0
Material   A        Acct. Cons  456       Plan cost 0            Actual cost 120
How can I group into  1 line ?
Edited by: Emily Nguyen on Jun 2, 2009 12:15 PM

Hi Emily
In OBYC you can configure GL accounts per valuation class.
You cannot configure Movement type wise. Each General modifier is linked with movement types.
We cannot give two consumption accounts for one valuation class in VBR.
Run your plan cost again.
Thanks
Kiran A

Similar Messages

  • Restricting Goods Issue only against reservation and Production Oder

    HI all,
    Is it possible to restrict goods issue only against Reservation, and Production Order.
    I dont want the user to issue goods without refering to any reservation or Production Order.
    Thanks and Regads

    Hi,
    To restrict the same in MIGO, go to following path;
    SPRO > MM > Inventory Management and Physical Inventory > Settings for Enjoy Transactions > Settings for Goods Movements (MIGO) > Settings for Transactions and Reference Documents and Here Select Transaction "MIGO" and double click on "Transaction/event", here select "A07 Goods Issue" and double click on "Reference document" and remove only keep Active "Order" and "Reservation" and remove remaining. And then check in MIGO.

  • To issue the component to the Production Order

    Hello All,
    I have assigned the component to the Operation of Production Order from Different plant(say 1100) of Same company code(1000).
    I want to issue that material from that plant to this plant (say 1000) of Production Order.
      So my question is the correct method of directly issuing the component to this Production Order of different plant.
    Shailendra

    Hi  HAdkar
    The correct procedure is .
    You have to assign special procurement key 80 in material master for which you want to procure from plant 1100. The material master of procuring material should exist for the plant 1100. While running MPR the procurement proposal will be automatically created in the 1100 plant. From 1100 plant you do stock transfer to your storage location. Then finally do GI for the header prod order in you plant.
    This is the procure in SAP. Eventhough both the plants exist in the same compound.
    Regards
    J . Saravan

  • Issue regarding Batch determination in Production order as per Expiry date.

    Dear all,
                    first of all  happy Navratri.
    I have issue regarding batch determination in production order.
    I have to compare P.O header materialu2019s expiry date and issuing components expiry date at the time of batch determination.
    lets take example,  Material having self life is u201CXu201D years and batch determination against PO is based on FEFO with the help of self life we can determine Expiry date of manufacturing material  suppose it is u201CYu201D  I have to introduce restriction at the time of good issue if expiry date of issuing components u201CZu201D is less than expiry date u201CYu201D.
    Please give your valuable suggestions either standard or through SAP enhancements.
    thanks & Regards
    SIVA

    Dear
    Thanks for your reply, i am layman about batch derivation can u elaborate it.
    Thanks & Regard

  • Goods Issue To Each Operation Of Production Order?

    As we know, in SAP ,when we create and realse the production order,we could posts good issue to the production order ,using MB1A. And in SAP , the components can be assigned to the operations of the finished product.
    But in our company, the production order will take long time,and during production,different materials will be used in different phase of the production order,that means different components will be used for different operations.
    And for some reason,we don't want our material to be backflushed during production.
    So I want to ask can we post goods issue to each operation of the production order,not to the whole production order? Can SAP support Post Goods Issue To Each Operation Of Production Order?
    What shall we do if we want do this?By ABAP development ? Or there is third party software
    can do this with SAP? 
    Thanks for any reply!
    Edited by: Fei Liu on Mar 14, 2009 4:56 PM

    Hi Fei,
    As explained above, i think the concept of releasing the individual operations instead of releasing the order at header level would work fine for your requirement.
    Steps:
    1. Go to operation page in co02.
    2. Select the first operation, at the bottom of the screen you would find a Green Flag, click on the same.
    3. You will now find that the status of the first operation has changed to REL, while the others are still not.
    4. At header level you will find a status PREL, indicating partial release.
    5. After completion of the first operation, confirm the same & select the second operation & click release, & the process follows in this manner
    6. Please do not click the green flag at the header level as this will release the entire order.
    Pre-requisite:
    1. You have assigned components to the respective operations.
    You might also want to consider the usage of trigger points. This you can assign to each operation, where-in if the status changes to CNF, you trigger the release of the following operation. But before opting for this flow, first do it manually to ensure it meets your need.
    Also if the components assigned to the same operation, needs to be issued at different date, then you can use the lead time offset in BOM. In cs02, go to item details, here you can specify the same. Eg: If your operation stats on 15th March & you want this component to be issue only on 17th March, then specify the offset as 2. But if you want the components to be issued 2 days in advance of 15th march, then specify as 2-.
    Hope the above helps.
    Regards,
    Vivek

  • Issuing a handling unit to production order

    Hi
    Is it possible to issue a handling unit to production order. Kindly through some tips in this regard.
    Thanks and Regards
    Saravana Kumar

    hi Sarvana,
    a handling unit consists of altogether several contents items that are listed as
    >full delivery items,
    >partial delivery items,
    >or even further handling units
    So from the above the handling unit consist of the items for delivery and are packed in one packaging
    material (box). The packaging material and the materials it contains form a handling unit that is
    assigned to a delivery and can be moved within the warehouse. The content of the handling unit is not significant for Warehouse Management. In fact, the contents can only be determined by referring to the delivery.
    So a HU can't be assigned to the production order within the same plant.
    for further assistance you can check the following link.
    http://help.sap.com/saphelp_47x200/helpdata/en/16/4bad1ba63611d2b44e006094b9b9dd/frameset.htm.
    hope this helps to answer your question,
    with regards,

  • Reg:table which contains open STO's and P2P orders

    Hi,
    Can any body please tell me the table which contains open STO's and P2P orders.
    Thanks&Regards,
    Usha.

    Please refer to table EKPO where field ELIKZ is not equal to "X".
    Regards
    Bhavesh Mistry

  • Goods Receipt for Material which has no Standard Price in Process Order

    Hello everyone, is there a way by which we can prevent GR for process order which contains material that does not have standard price? And if ever we received material using process order how can we correct the process order right after we correct the standard price.

    Hi,
    i just don't know why you raised new thread as already ur previous thread is not closed
    Now just let us know whether system is throwing any error
    or what exactly happing in cofirmation screen
    Go to OPK4, here
    under goods movement there is option all components  just tick it
    then in second tab Gen individual entry tick Goods movement & termination for incorrect goods movement
    Coming to GR
    what is storage location ur giving
    just check in MMSC, whether this storage location is activated for the header material ( GR )
    Added
    Plz Go through all possible options
    [Auto GR is not happening.;
    Regards
    kumar
    Edited by: kumar kumar on Nov 10, 2009 2:25 PM

  • Goods Issue Control & confirmation control for Production Order.

    Dear ALL,
    Please let me know how to control,
    1) Unauthorised consumption of component quantities in excess of quantity defined in BOM?
    2) Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    3) Posting of goods receipt against production order for which no components have been issued or no confirmations have been posted?
    4) Posting of goods reversal quantity in excess to issued quantity.
    Regards,

    Prashant,
    Not all the requirements you mentioned can be controlled in Standard SAP system. For some of the requirements you could configure User status (Tcode :BS02).
    exmaple :
    Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    SET user status XX on Business  transaction : Release that forbids CONF.
    SET another user status YY on Business transaction : Goods movement that allows confirmation.
    With this kind of tricky user status you can control/prevent some transactions in production order till certain transactions are done.
    I know this is not the ideal solution but I have used it for various purposes to meet certain business needs.
    Hope this helps you.
    Thanks,
    Ram

  • RE: Goods issue posting through Migo for Production Order

    I have released the production order, when I want to post the goods issue through migo to the concerned order I am getting error saying that material "No components exist but there was stock in the storage location for unresticted use.
    I have checked through MMbe transaction.

    Are there components in the Production Order? If yes, is the reservation created and movement allowed for the reservation?
    Lakshman

  • Issue/Bug in reservation for production order

    Hello,
    We have a bug with the reservations for a production order, which in turn is causing a problem with clearing a cogi error. I have a COGI error for material 123 in plant A.they are trying to remove 14,312 lbs that was confirmed to production order 1000123. According to the error message the production order only has 6,400 lbs that can be removed. in CO14 my material 123 show two quantities in different batch 14,312 and 6,400. In Reservations shows only 6,400 as being consumed. this amount should be 20,712 (14,312 + 6,400). The reservation did not get updated correctly. Why this happen? How could we correct this RESERVATION to add up 14,312 in my material 123)?
    Please give me feedback ASAP, need help.
    Thanks and Regards,
    JJ

    Hello,
    thanks for the answer you have given me..
    as to make sure, does it is safe to delete the error? even that it tells that RE qty moved exceeded by 7.912 lb? it so weird how come was the reservation was complete since when they raised it it just 6,400 it shows? how could i make sure that document goods movement for my production order as mr. pradeep told me to do? what should i do?
    thus when deleting the error in COGI, it will change the my material in CO14 COMPLETED and have QTY WIDTHDRAWN and will be encluded in the same RESERVATION NUMBER?
    Anyone please revert back to me.
    Thanks
    JJ
    Edited by: John Jay Palisoc on Jul 22, 2008 7:08 AM
    Edited by: John Jay Palisoc on Jul 22, 2008 8:02 AM

  • Performance Issue, Unable to pull all production Orders in given statuses

    HI All,
    I have a requirement to pull all production orders that are in the created or released status and then action some different things in the program such as adjusting dates, etc. The issue I'm having is that as the volume of production orders grows the select statement stops being able to complete and pull these production orders. I've tweaked this before and it was able to work for a few weeks but has now reached it's limit again. I tried using the trace and SE30 to analyze the program as I've read suggested here, however it's been difficult to try adjustments as the program runs in about 3 second in the development environment. Our quality environment, which has roughly half the volume of the production system ran in about 15 seconds. So I am unable to duplicate the issue until the program is moved to production.
    Here is the select statement:
      SELECT k~aufnr
        FROM aufk as k INNER JOIN afko as f ON f~aufnr = k~aufnr
          INNER JOIN jest as j ON k~objnr = j~objnr
        INTO CORRESPONDING FIELDS OF TABLE it_aufk
        WHERE k~aufnr IN s_aufnr     "Order Number select option
          AND k~werks IN s_werks             "Plant select option
          AND k~auart EQ u2018PP01u2019              "PP01 std orders only
          AND k~kokrs EQ u20181000u2019              "Seneca Controlling Area
          AND k~autyp EQ u201810u2019                "PP Production Order
          AND k~loekz EQ space                 "Deletion indicator
          AND ( j~stat EQ u2018I001u2019             "CTRD, created status
            OR  j~stat EQ u2018I002u2019 )           "REL, released status
          AND j~inact EQ space.              "status not inactive
    There are a couple thoughts I have to try, but I don't know of any good way to verify if helping given the volume differences until in production so am looking for feedback. Here's the ideas:
    1. Use the field IDAT2 in AUFK to determine if an order is not TECO'd , rather than using the JEST table. Testing this in Dev had increased run time versus how I have it written now, but may be helpful with larger volume and/or if an index is put on this field. Thoughts?
    2. Separate the select statements to read AUFK and JEST separately and instead use the FOR ALL ENTRIES command. Seems to be a lot of conflicting thoughts on which works better, thoughts on this particular case?
    Also, there is another program that pulls only production orders in Created status, and it doesn't have this same issue.
    Thanks in advance for any help,
    Kyndal
    Edited by: Kyndal Copley on Oct 1, 2009 6:46 PM

    I have three recommendations for your join.
    1) Assuming that fields AUART and KOKRS are always known (constants) I recommend that you move them up in the where clause (like illustrated) to ensure that the system uses index C.
    2) AUTYP EQ '10' seems superflous. In addition it seems to increase the search time. Check with your functional consultant if there could be a production order with AUART EQ 'PP01' and AUTYP NE '10'. If you will never encounter this situation it makes more sense to drop the clause AUTYP EQ '10'.
    3) INTO CORRESPONDING FIELDS OF TABLE usually takes longer than INTO TABLE. Define the table with AUFK with just field AUFNR so that you can use the clause INTO TABLE.
    SELECT k~aufnr
      FROM       aufk AS k
      INNER JOIN afko AS f
      ON f~aufnr EQ k~aufnr
      INNER JOIN jest AS j
      ON k~objnr EQ j~objnr
      INTO TABLE it_aufk
      WHERE k~auart EQ 'PP01'
      AND   k~kokrs EQ '1000'
      AND   k~aufnr IN s_aufnr
      AND   k~werks IN s_werks
      AND   k~loekz EQ space
      AND ( j~stat  EQ 'I001' OR j~stat EQ 'I002' )
      AND   j~inact EQ space.

  • No. range issue : at the time of production order settlement

    Hi expert,
    My user is unable to settle production order due no no range issue:
    Short text of error message:
    Document number 9000 20001 2008 was already assigned
    Technical information about the message:
    Diagnosis
         Document number 20001 in company code 9000 and fiscal year
         already been assigned.
    System response
         Termination of processing.
    Procedure
         Check document number range 02 in company code 9000 and fi
         2008 and correct the number range status if necessary.
    Message classe...... "F5"
    Number.............. 152
    Variable 1.......... 9000
    Variable 2.......... 20001
    Variable 3.......... 2008
    Variable 4.......... 02
    Variable 3.......... 2008
    Variable 4.......... 02
    Pl advise.
    Regards,
    Samar

    Hi experts,
    Thaks for the reply.
    Pl advise what is the configuration/T code to be maintained for no range
    Regards,
    Samar

  • Issue more than Planned in Production Order

    Hi All,
    I have a problem with 2007B SP00 PL11 for Issue for Production.
    In 2005B, I can issue the BOM Components more than planned. But in 2007B version, I am unable to issue more than planned. When I right-click at Production Order to Issue Component or at Issue for Production and copy from Production order. no items are displayed.
    I have already issued in full at the 1st issue. Then subsequently, i need to issue some more qty for certain components. But i am unable to do that.
    Has this feature of issue more been changed in 2007B?
    What other method can be adopted without changing the planned qty?
    Please advise.
    Regards
    Jessie

    Hi guys,
    Thanks for the fast response.
    Duplicate the previous issue to create the over-issue is not a good solution. It is very troublesome. itis not a good procedure to ask customers to do this step.
    Changing of the planned qty will mean that i am not able to trace my initial plan and have to go back to the BOM. again, this is not logical. especially when the queries are using figures directly from production order tables.
    Since it can be done in 2005 version, why is SAP taking it out this feature in 2007?

  • Production Order - Modify field Material Provision Indicator for component in the production order

    Good afternoon,
    I have a component in the bill of material, that has the option Material Provision Indicator activated.
    When i create the production order, the component automaticaly is activated with the  Material Provision Indicator option.
    However, in the production order, this field isn't possible to modify, because is closed.
    Anybody knows way the modify this field? Configure to open?
    Thanks.
    Kind Regards,
    António Pinho

    Hello Amar,
    I am also getting the same error while Releasing Production Order and Costing (CO11N). This error is related to EHP7 in our case.
    Please try one of the following solution and see whether the error is gone or not.
    1. Implement the SAP Note 1317551 - Error AD_SUBCON 141 / 143 / 144 (T417)
    OR
    2. Complete the customizing of Material Provision Indicator (T Code OICO) as per the attachment.
    Regards,
    Prashant Karanjgaonkar