Consumption with CDP by using planning product

Hi all
I use product A, with planning product B mainteined in MRP3 and transfered to APO as hiearchy PLANNING PRODUCT. The consumption works in APO if I do not use descriptive characteristics (material, plant, customer).
If I use descriptive characteristics consumption do not work. I mean, problem is here:
Each consumption group has mandatory characteristics 9AMATNR and 9ALOCNO. The characteristics 9AMATNR for real product and planning product is not the same and teherefore the consumption do not work.
Do you have any experience or idea? Is it possible ti use CDP forecasting consumption with planning material scenario?
Thanks
Pavel

Hi Stefanos,
What you are doing is absolutely right.. However, I want to ask a few question..
1. Are the characterestic values included in the filter ? ie. If you want to change for Country: UK, is UK present in filter?
2. Are there any other characteristics that you have not included in the function and are getting changed by chance ? Like you might need to include 0fiscyer in To Change if you are assigning 0Fiscper.
3. Write a small FOX function with hardcoded values to check if the system is accepting the values or not..
It should work.. Please write back in case you need more help..
Regards, Rishi

Similar Messages

  • Has anybody figured out how to fix the battery consumption with mountain lion (using a MBP 13")?

    I upgraded to Mountain Lion, and yes despite all of the warnings posted in the App Store reviews about the battery life being cut in half, I upgraded my MBP anyway. Chalk this one up to the Black Cloud of "I Told You SO!" My MBP could hold a charge for almost 6.5 hours. Now I'm luck if I can get 3, but in most cases I may get 2.5 hours if I'm conservative.
    Has anyone figure out how to fix this battery problem? Even now after having it unplugged for almost 2 hours...I'm getting the "You are now running on reserve battery power" message. What a freaking joke!
    Any help would be greatly appreciated!

    Open /Applications/Utilities/Activity Monitor.  Click %CPU until the triangle points down beside it.  Make sure it says All Processes in the upper right.  Check for applications taking up lots of CPU time.

  • Is possible forecast from DP to PPDS w characteristic use with CDP block?

    We have set up a test scenario with CDP (Characteristic Dependant Planning) setting to utilize Block Planning and I want to send the demand quantities from DP to PPDS, in a way that the characteristic sent with the Demand Plan (eg Product, Location and Colour = Red) will then match the block when creating the PPDS order (eg Block = Colour Red)
    I have tried 2 methods so far which have not worked, and I am wanting to find out if it is possible to send demand planning volumes to use with PPDS CDP Blocks?
    Following the process outlined in these areas
    Planning with Characteristics
    http://help.sap.com/saphelp_scm70/helpdata/en/fa/e943401a306f13e10000000a1550b0/frameset.htm
    PPDS and planning with characteristics
    http://help.sap.com/saphelp_scm70/helpdata/en/a2/90b83b06855a4ae10000000a11402f/frameset.htm
    Cannot use CBF and CDP together on the one client
    I have tried these 2 methods.
    1. Setting up CBF (Characteristic Based Forecasting) in DP and trying to send these to PPDS CDP. That was before I found the above help guide that tells me this is not possible. The data went across from DP to PPDS, but the results were a mess, the wrong values to the wrong characteristics.
    2. Tried sending Demand planning with standard characteristics from DP to PPDS, and this initially looked like it would work. Consumption group, Product, Location, ZCOLOUR (created a BW type info-object called ZCOLOUR which I put in the DP Planning object)
    But when sending to PPDS, the COLOUR = RED comes over as a "desciptive characteristic", which is different to the manually created forecast in PPDS which is colour = RED within CLASS ZZZBLOCK Characteristic ZCOLOUR (Value = red), which comes up as a seperate tab on the requirement.
    So the two ZCOLOURS of the infoobject ZCOLOUR and the Characteristic within Class 400 ZCOLOUR do not talk to each other ,and PPDS does not recognize the object, so cannot create any PPDS orders with block relevant characteristics.
    The SAP help just talks about "create an ECC sales order" to use to feed demand into the CDP Blocks, so possibly it is not possible to map Demand Plan data to PPDS CDP Blocks. Has anyone got this to work?

    Please check the following:
    Use consumption group with CBF characteristics. The CBF characteristics need to be in the consumption group!
    The consumption group has to be assigned to the u2018demandu2019-view of the
    product master
    The assignment of the consumption group to the release settings (transaction
    /SAPAPO/MC90)
    If you want to Make-to-Stock Segment implement the BADI:
    From a configuration point of view it is required to activate the BAdI
    /SAPAPO/DM_BADI_CONF and add following line of coding to the method
    CONFR_FILL:
    method /sapapo/if_ex_dm_badi_conf~confr_fill.
      et_stra_details-plnvp = 9.
    endmethod.

  • Planning Product

    Hello,
    Could anybody please  explain me when and how the "planning with planning product" option should be used in APO? Also, can somebody confirm me if strategy 40 is supported in SNP? My understanding is that planning with planning product- strategy 60- is only supported by DP.
    thank you all!.

    Hi,
    APO SNP does not support  planning with standard strategy 40 ( Planning product) .
    APO SNP only supports strategy 10( anonymous  make-to-stock prdocution ) and 20 ( Planning with final assembly). 
    APO demand plannig is used for generating  forecast statistically and then processing for arriving at a consensun demand plan.
    Regards
    Datta

  • Tcode for planned production  and actual production

    Hello,
    I am working with a report I want to check the values with R/3 for Planned Production and Actual production. Does anybody have any idea how to check?
    Thanks in advance

    Hey Suman,
    i have the same problem, did you find a solution?
    thanks

  • Is there any Utility industry company is using PP-production planning & exe

    Dear All,
    Is there any Utility industry company is using PP-production planning & execution module and CO-PC product costing module ??
    Meaning.. any Power generation/Transmission/distribution or water production/Transmission/distribution company is using SAP PP or APO for their operation business processes.
    Our client is actually an integrated Utility having very much integrated product lines like Processed Sea water for cooling, Process water for Industries, Potable water & Power for the communities/ industries.
    Please let me know.. as we are planning to implement the PP and CO-PC for product costig..
    As I know Tata chemical, Gujarat-India is using SAP PP module for their captive Power generation.(I have worked there as SAP CO consultant). But there is no transmission and distribution as such.
    But production processes are covered by PP and product costing CO-PC is also implemented and it is giving very accurate cost per unit both for plan side and actual side.
    regards,
    George

    Dear Pavan,
    Thanks for the reply..
    Yes, as you rightly mentioned..It is not very simple...Utility production is bit complicated than normally believed by majority.
    But for captive production of power & water, we had used PP/CO-PC successfully for may be more than 12 years(in tatas)..
    What was done in Tatas, power as a material(finished good) and BOM/ recipe for it in the PP.
    (because we had used PP-PI there) and Power's BOM water is an input material and in Water production BOM power is an input material..i.e recursive BOM and system (PP/CO-PC) will take care this iteration or this give and take.
    And main product was input for itself in its third stage.. And steam is input for itself and input for power/water and opposite also true..
    And we got 5 different steam, like 50 pound, 100, 250 pound ..Still with all these complexities PP/CO-PC is able to give actual cost per unit accurately. So for production/generation standard PP/CO-PC will work fine...we are 100% sure...but for transmission and distribution is there any better way or solution model ??
    But the main thing or the question is that whether you are able to get the actual qty of production consumption in process.
    Then system (PP/CO-PC) will take care this iteration or this give and take.
    And on the actual side of product costing, we have to use the material ledger functionality, wherein we can use multilevel settlement by which we can settle the actual cost variance at each stage of production to the next stage of production.
    But the first reaction, when people hear about utility...it is very very simple...you are only producing one 2-3 final products..only 2-3 technologies involved...
    But reality is quite different...and currently all the major utility company's production processes are outside SAP system, even when they are using SAP for all other functions/departments...but their main function is to produce water/power is outside the system..and like any other company production/generation processes are the most repeated activities in their company.
    And if you see..even two repair works in say SAP PM module processes are different to each other..(still we are using a SAP module-PM for that to have historcial data and to learn from our from experience)
    But production of desalination water from desalination plant is same today, tomorrow...day in ,day out...it is same..
    And if we are saying we cannot co-relate input quantities with output quantities..we are essentially saying we have no control over production processes and we don't want to standardize our most repeated  activity(production)
    Anyway, since production processs is out of the system means, no quantitative data-production related  is available in the SAP system and most of the organisation using excel for reporting of quantitative data-production related..
    regards,
    George

  • SNP Capacity plaaning scenario with planning products

    Hello APO Experts,
    I have come across a capacity planning scenario in metal industry.      
    Suppose the machine is producing sheets of thickness ranging 2mm thickness to 8mm thickness. There are three groups as shown below P, Q, R,
    These individual product orders are loaded on Resource: W100
    Groups                                                          Limited Capacity In Tons          Individual products   Planning product
    Group P: Less than 2 mm                                      75                          a1, a2, a3, a4, a5                       P
    Group Q: From 2mm to 4 mm                               100                           b1, b2, b3, b4, b5                     Q
    Group R: From 4mm to 8mm                                 325                         c1, c2, c3, c4, c5                        R
    The total sheets produced in one day 500.tons  All the groups should be producced on daily basis in the sequence of P,Q,R. Limiting the capacity given above. In SNP planning , I would to limit the capacity based on the basis of planning products.
    The planned orders will be coming for Individual products that are a1, a2, a3, a4.
    In SNP planning run, the quantity of Individual orders should be sum up at the group level.
    For Group P : a1, a2, a3 u2026. Sum up and the quantity should be checked for Capacity of 75 tons order quantity.
    For Group Q : b1, b2, b3u2026. Sum up and the quantity should be checked for capacity of 100 tons order quantity.
    Like wise for Group R : c1, c2, c3u2026. Sum up and the quantity should be checked for capacity of 300 tons order quantity.
    I want to use the planning product concept to model this scenario. P will be the planning product for a1,a2,a3....
    Q will be the planning product for b1,b2,b3....
    Following master data created : Material master , BOM , routing for individual products. Material master for planning product. Planning product updated in the material master of individual products in MRP view.
    Please let me know , your suggestions for use of planning product scenario with capacity check on product group level.
    Waiting for your reply.
    Regards,

    Ravindra,
    So, you are saying you are unconcerned about consumption of independent demand, and unconcerned about performing ATP against a forecast, which are the main feature of a planning product?  You are only interested in how your supply elements and capacity consumption is aggregated/disaggregated?  If this is the case, I don't understand why you would wish to use Planning materials.  Based on what little you have told us of your requirements, I would think that Product Hierarchies would be more suitable......
    http://help.sap.com/saphelp_scm70/helpdata/EN/43/03b0b3dccd22f3e10000000a1553f7/frameset.htm
    Best Regards,
    DB49
    Edited by: Dogboy49 on Jan 14, 2011 3:52 PM

  • S there any Utility industry company is using PP-production planning & exec

    ear All,
    Is there any Utility industry company is using PP-production planning & execution module and CO-PC product costing module ??
    Meaning.. any Power generation/Transmission/distribution or water production/Transmission/distribution company is using SAP PP or APO for their operation business processes.
    Our client is actually an integrated Utility having very much integrated product lines like Processed Sea water for cooling, Process water for Industries, Potable water & Power for the communities/ industries.
    Please let me know.. as we are planning to implement the PP and CO-PC for product costig..
    As I know Tata chemical, Gujarat-India is using SAP PP module for their captive Power generation.(I have worked there as SAP CO consultant). But there is no transmission and distribution as such.
    But production processes are covered by PP and product costing CO-PC is also implemented and it is giving very accurate cost per unit both for plan side and actual side.
    regards,
    George

    Hello George,
    I would not be able to provide you much detail about the PP solution as I was taking care of the controlling part. The BOM of power and water were defined as you have mentioned only thing we had additionally was Gas was also mentioned in the BOM since we had 6 gas turbines. But all of them were mentioned as not relevant for costing. So there was no cost being calculated from the material side. We had formula planning template (CPT1) that used to calculate the costs under the following heads which were defined as activity types.
    a) Gas
    b) Employee Costs
    c) Consumables / Supplies
    d) Operating Expenses
    e) Depreciation
    These components were planned at a initial price in KP26 and the quantity for them (except Gas) was units of power generated (for cost component it was 1 MW and for actual based on the quanity in the product cost collector). Power cost estimate used to be created at the begining of each period with help of this template and per MW cost was used in valuating the power generation in each of the product cost collectors (the turbines were defined as separate work centers as well as product cost collectors).
    In the actual execution the power material used to be generated in all the product cost collectors and the usage of gas was confirmed. The template used to be executed in the month end (CPTA) and the same would allocate the costs posted in the power generation cost center to the product cost collectors (the amount would be the power units generated multiplied by the rate mentioned in KP26 for Employee Costs, depreciation etc. and for gas it would be Gas units consumed multiplied by the rate mentioned in KP26 for activity Gas). The power material generated would then be issued to the generation cost center along with the usage of gas for power as well. The next step is execution of the splitting transaction which would allocate the amount posted in the cost center to the various activities and then the actual price calculation would be carried out for the activities and the product cost collectors get revalued with the actual price. Upon settlement of the product cost collector to the generation cost center you would have the power material issue cost + settlement account. The amounts posted in these two accounts would be transferred to the water cost center using a assessment cycle with SKF that mentions the usage of water in power and another assessment cycle taking the costs in water cost center with help of SFK that quantifies usage of water in power. Now the power material cost + settlement amount - sent to water + received from water is sent to another cost center called power - distribution and from there the amounts including any distribution costs booked therein is transferred to other user cost centers using usage units defined as SKF.
    What I feel later is the water activity could have been done before settlement and an activity type could have been defined for that purpose.
    At the moment I can remember this much and would be happy to answer any more query which you may have. That was a good design though it had lot of scope for fine tuning.
    Kind Regards // Shaubhik

  • Purchased Teacher and Student edition, but with the trial expired, I cannot use any products?

    I bought the Teacher and Student edition (one year plan, prepaid), but after the trial expired, I cannot use any products. It asks for a serial number, which to the best of my knowledge, I never received. Is there something I missed?
    Thanks in advance.

    Trimatirate you will need to locate the serial number you received with your license to use the software for a year.  If it is registered then it will be available under your account at http://www.adobe.com/.  You can find additional details at Find your serial number quickly - http://helpx.adobe.com/x-productkb/global/find-serial-number.html.

  • Use of planned production standards

    Hi All
    I can use 'Scheduling Standards Maintenance' activity to define planned production standards for shop floor processes.
    But I do not understand the method of comparing the plan with results well.
    Do the report etc. for the comparison exist?
    Thanks for any hints
    Regards

    Hi all,
    If I understand your questions correctly, then you are right - there is no separate report which compares scheduled standards with actual numbers. I believe that Scheduling Standards Maintenance is used just to keep that kind of information for reference. The actual numbers to measure the productivity and performance are provided by Yield reports, Cycle Time reports and Resource Utilization reports.
    BTW a while ago there was a customization requested by a customer where those values from the Maintenance were used for calculation of operators' salary in particular.
    Regards,
    Sergiy

  • Can i create additional apple id's using the same email address for using multiple products with iCloud?

    can i create additional apple id's using the same email address for using multiple products with iCloud?

    Hi Anne,
    I'm pretty sure different eMail addies are needed for different Apple IDs.

  • I have an iPhone with an unlimited data plan. Is there a way to go online with a wifi only iPad using my phone for access?

    I have an iPhone with an unlimited data plan. Is there a way to go online with a wifi only iPad using my phone for access?

    If your iPhone cell carrier allows you to use Tethering, you can turn your iPhone into a wifi hotspot, then your iPad Air can connect to that for internet access.  Not all cell carriers allow tethering without you signing up for additional fees/services.  For example, AT&T in the US still has grandfathered "unlimited" data plans, but they do not allow tethering for those plans.  With AT&T you need to switch to a Mobile Share plan (or a tiered plan if still available) to use tethering (legally).

  • HT201210 nowadays have many user have problem with update to ios7 and need active with apple id maybe in the future in order escape from these problems must be stop use these products else. Because of simple user don't know about this technology and somet

    nowadays have many user have problem with update to ios7 and need active with apple id maybe in the future in order escape from these problems must be stop use these products else. Because of simple user don't know about this technology and sometime just hear from other user that it 's difficult to use then force they change phone that use to handle to another.

    It is a feature to discourage the theft of iPhones by making them useless if resold. It's not going anywhere. It's simple: just don't buy a phone until you make sure that the activation lock has been disabled.

  • Problem using Change production and SFC step status with Simultanious group

    Hello,
    We just upgraded to ME 5.2 SP5 patch which was released two days back, the problem with Simultanious group is fixed and SFC gets the correct next step as per defined in the router (Previously there was bug).
    But when we try to use change production and put SFC in simultanious router at some particular operation as que it is getting in que at all operations and really can be started and completed even at the last operation.
    Same is the case with step status if we put it in que at some intermediate operation all operation listed above are becoming in que irrespective of the flow defined in simultanious router.
    Please let me know how to handle this.
    Regards,
    Pushkar Patil

    Hi Pushkar,
    It seems to be a bug. I would suggest opening a ticket on this.
    Regards,
    Alex.

  • How to make this work with Firefox, I like not to use microsoft products! HELP!

    Downloading for Realplayer, after watching the full movie, I click download and it has to reread the movie from the internet. When using explorer, after downloading the movie, it reads it from memory, which makes it a fast download. Hoow to make this work with Firefox, I like not to use microsoft products, and I really like Firefox 7.0.1!!!! HELP!

    -> click '''Firefox''' button and click '''Options''' (OR File Menu -> Options)
    * Advanced panel -> Network tab
    * place Checkmark on '''Override Automatic Cache Management''' -> under '''Limit Cache''' specify a large size of space
    * Remove Checkmark from '''Tell me when websites asks to store data for offline use'''
    * click OK on Options window
    * Restart Firefox
    Check and tell if ts working.

Maybe you are looking for

  • Apex 3.2 is not starting

    Hi, My company is running Apex Version - 3.2.0.00.27 on Oracle EE 11.1.0.7.0 for Development. I've changed some settings in listener to make it work for external C library and restarted it. After restarting APEX has stopped running. Is there any rela

  • Exporting report as PDF

    Hi, Is there any provision in BAM to export a report in PDF ,Excel,PPT or word format. I would really appreciate if someone could give me a solution regarding this. Regards, Lathika

  • SAP QM - Inspection Lot Stock tab missing in QA11

    Hi, My scenario is raw material inspection and I executed the scenario as follows Step 1 : Assigned 01 inspect type to the material in QM view . Step 2 : Created three MIC's Step 3 : Created Sampling procedure Step 4 : Created inspection plan for mat

  • Problem in Workflow matching step

    Hi, I am facing a problem in Workflow matching step. I have user kaushikb assigned to it. Execution Type: Any Single, Assignee Type: User and Execution Type: Any Single. Match Record Scope: Records vs Records, Strategy: MDM_NAME. This Strategy: MDM_N

  • Network on OSX 10.5.1

    Hi I try to setup a network between two Mac Pro's using gigabit Ethernet. But only one of them appears as shared on both computers. On both the "share" settings are the same. (only difference is that on is connected via port 1 and the other port 2) I