Hi,
The requirement of my client is that they want to use Contract (Quantity or Value based) as Purchase Order in business purpose as well as in MRP. It means they want Contract to appear in MD04 as a result of MRP and if the contract is open (in terms of quantity or value), the system should not generate planned order or purchase requisition as a proposal.
Further to that they also want to do Goods Receipt and Invoice Verification against the Contract.
As far as I know, this can be possible only in case of Scheduling Agreement with schedule lines not through Contract.
It means Scheduling Agreement can replace PO in this scenario but a Contract can't.
I need an expert advice in this matter.
Can any one provide some clarification?
Thanks in advance

Thanks for the useful clarifications
I have further noticed that .. If Contract No. & Item No. is not put in the source list; the contract is not fetched automatically in Purchase Req & Purchase Order. Price is picked from Info Record (not from Contract). Also, In Release history of Contract the PO created doesnu2019t appear.
It means the Contract is not at all respected in MRP, Purchase Req & PO if Contract No. & Item No. is not put in the source list.
Is it a Standard Behaviour of SAP or some setting is required?
Can any one provide some idea for better clarification?
Thanks in advance

Similar Messages

  • How relate Procurement Contract and Purchase Order

    Hi!
    We are going to use Oracle Procurement Contracts and Purchasing in Oracle Apps R12.1.3 version.
    I think that modules have to work together.
    We activated Procurement Contracts and profile "PO: Contracts Enabled"
    We have in "Purchase Order" actions 'view Contract terms', and functionality to chose Contract template and clause, "Manage Contract Documents" - that all.
    Can we create from it, or relate with this PO a real Contract, that we see in Contracts Workbench?
    Edited by: DenisM on 20.02.2013 14:44

    Denis:
    Use Oracle Contract Terms module as the module for defining contract templates and clauses. Once you define it in this module, the templates will be available in Oracle Purchasing.
    I am not sure if the Contracts Workbench is integrated with Oracle PO. It was not in earlier versions but it maybe in 12.1.3. You may want to check on that.
    Yesh

  • Batch determination for Sub Contracting Purchase orders

    Hi
    I want to allocate automatic batch number while creating the Sub Contracting Purchase order (item cat: L).
    System should dynamically allot the batch, no manual process.
    This automatic batch number allocation should be work for sub contracting PO's not all Purchase orders.
    Please suggest the process.
    Thanks

    Hi SUNIL,
    I haven't done such thing so I'm nut sure whether it works what I'm writing, but according to the manual is it possible to assign automatic batch creation to movement types.
    As I understood in SPRO you can:
    1. Set the internal batch assignment:
    Logistic General > Batch Management > Butch Number Assignment > Activate IBNA
    2. Define the creation for the movement type you want:
    Logistic General > Batch Management > Creation of New Batches > Define Batch Creation for Goods Movements
    But I think you can't make difference between 'normal' MVT 101 and 'L' MVT 101. Isn't it possible to create a new MVT for subcon-GR?
    In this case maybe you could realize your idea.
    But defining a new MVT just because of thi might be troublesome...
    Maybe you can find better solution.
    http://help.sap.com/saphelp_46c/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm
    BR
    Csaba

  • Contracts and Purchase Order system messages

    Hi All,
    I have a couple of questions relating to system messages that are related to purchase orders created with reference to contracts.
    1. When should message 06 155 called? If I create a purchase order with reference to a Value Contract (WK) where the total purchase order value is equal to the Contract Target Value I would expect the message to be called as either a warning or error depending on the system settings (it is currently set as a warning). However in my system the message is not generated.
    I can get the message to generate if I put the PO on hold, then change the value of the PO above the contract target value and then set it back to equal the contract target value but this hardly seems the correct way the message should be called.
    2. Is there a standard way to restrict which purchase order document types can be created with reference to a contract?
    Cheers
    Chris

    Hi Jurgen,
    thanks for the response. I know that the message should be called if the total PO value is equal to the Target Value of the contract, however in my system this doesn't happen.
    Example
    Contract has Target Value of £1,000,000 (Target Qty is 0 and Price is £1)
    Field ktwrt = £1,000,000
    PO created with qty 1,000,000 and price £1 (i.e. value = £1,000,000) but the message is not generated. If I change the qty to be 1,000,001 then message 06 042 is correctly generated.
    Is the message 06 155 generated correctly in your system? or I am missing someconditions that don't match between my PO and contract?
    Cheers
    Chris

  • Steps to create a purchase order in SAP r/3

    Hi All,
        I need to create a purchase order in SAP R/3,I am very new to SAP R/3 just started using material managements module in R/3.Could any one please help me to know what all steps i need to take for creating a PO.Do i require some pre-requisite data in R/3?
    Waiting for your reply!
    Thanking you.
    Regards,
    Namrata.

    Trigger
    A purchase order needs to be created, and the vendor is known
    Business Process Description Overview
    A purchase order is a legal document issued by the buyer to the vendor to supply materials or service at the agreed price, terms and conditions. The Purchase Order forms the basis for all follow-on activities like Goods Receipt, Invoice Verification, etc. The Purchase Orders can be created directly by entering all the required data, copying already created purchase order, with reference to an RFQ/Contract or with reference to a PR.
    Purchase Order creation is possible only if sufficient budget allocation is there for the Fund Centers. It is not possible to create Purchase Orders for a Vendor who is blocked for procurement or not maintained in source list for that item. Also it is not possible to create PO for Quantity more than the PR quantity.
    All the price components which are to be paid to vendors and requires to be inventoried has to be included in PO.It is possible to add different vendors for delivery costs. The tax codes should be correctly maintained in PO for the purpose of Cenvat availment etc.
    The payment term defaulted from Vendor Master or RFQ has to be verified and changed if required.
    The incomplete Purchase Orders can be saved as HOLD document and later completed and saved thru Change PO menu
    Input - Required Fields     Field Value/Comments
    Vendor     Vendor number
    Purchasing Organization     1000
    Purchasing Group     Purchasing Group code
    Date     Purchase order date
    Account assignment category     Where costs will be allocated
    Delivery Date     Anticipated Delivery Date
    Plant     For which plant we are buying the material
    Output - Results     Comments
    Purchase order document     Can be changed, displayed or printed which can then be mailed to vendor
    Tips and Tricks
    The Purchase Orders can be created directly by entering all data required for creating PO or by copying another PO or with reference to RFQ/Contract/PR.To create a purchase order by copying existing document (PO/RFQ/PR), you can either select the desired document in the document overview   .and adopt it in the current purchase order in the right-hand area of the screen using the ADOPT button   .In addition you can drag it onto the shopping basket symbol   with the left-hand mouse button. 
    Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data.  This will reduce the amount of redundancy in the data entry, i.e. plant, company code.
    One Purchase Order may be created for several purchase requisitions
    Procedural Steps
    1.1.     Access transaction by:
    Via Menus     Logistics èMaterials ManagementèPurchasingèPurchase OrderèCreateèVendor/Supplying Plant Known.
    Via Transaction Code     ME21N
    1.2.     Double-click   
    On screen “Create Purchase order”
    On screen select Domestic Purchase order in this screen . You can also select other document if you want to create other. Here drop down menu is available.
    Click   to enter the organization data.
    Screen will change in the header; enter data as given in the table below:
    Field Name     R/O/C     Description
    Purchasing Org.     R     Enter the purchasing organization code.
    Example: 1000
    Purch. Group     R     Enter the purchasing Group which is procuring the material
    Example: P01
    Company Code     R     Enter the company code under which above purchasing
    Organization is.
    Example: 1000
    After entering the organization data enter the vendor or material supplier in the field    here drop down is available.click   to see the drop down.
    Field Name     R/O/C     Description
    Search term     O     Text that describes the vendor in more detail.
    Example:     MICON
    Vendor     O     Description of the vendor.
    Example:     100008
    Click   .
    System displays all possible entries available as per data entered
    Restrict value range (1)   1 Entries found
    To select required Vendor Click   .
    Click   .
    Vendor selected
    Now go to   ,here the system will pick up the data automatically from the vendor master but if you want to chane the data you can change the data. Here drop down menu is available.
    Now go to   to mainatin the text.
    After maintaining the text if you want to see or change the vendor address click   and do the amendments.
    Now Go to   and click to enter the Items and other data as per the table given below:
    Field Name     R/O/C     Description
    Account Assignement     R     Key that identifies specific settlement receiver types such as cost centers, internal orders, work orders, asset accounts, or project WBS elements.Example: K
    drop down menu is available here.
    Item Cateogry     O     How the procurement of a material is controlled.
    Drop down menu is available here.Example: Standard
    Material     R     Here you will enter the material to be purchased from the
    Vendor.
    Here also drop down menu is available. Use the following
    to select the material. Example ZROH-DEMO
    In the figure above enter the search cretira for the material for example ZROH-DEMO and click
      . The follwing result will appear on the screen select the line item and click   to select
    the material.
    Short Text     R     Enter here short description about the material,if the text is not
    automatically picked up from the material master.
    PO Quantity     R     Enter here quantity to be ordered.
    Example 10
    Order unit     R     Here we enter the order unit’s of measurement.
    Here also drop down menu is available.
    Example : KG
    Category of delivery date     O     Here you can enter deleviery date format.
    Here also drop down menu is available.
    Example : Day format
    Delivery date     R     Enter the delivery date. You can use the calender provided by
    the system.
    Example : 28.02.2006
    Net price     R     Enter the net price of the material here
    Example : 1000 INR
    Material group     R     Enter the material group to which that material belongs.Here
    also drop down menu is available. This field is also automatic
    picked up field.
    Example : M10001
    Plant     R     Enter the plant code for which you are purchasing the material
    Here also drop down menu is available.
    Example : 1100
    Storage location     O     Here you will enter where the material is to be stored. Drop
    Down menu is available here.
    Example WH01
    Click Enter and system will give you message  
    You will now see the screen
    Field Name     R/O/C     Description
    Cost Centre     R     The purchase is done for which purpose. Here also drop down
    Menu is available.
    Example: 11050 for CDU/VDU /SGU OP
    G/L Account     R     G/L account from which payment will be done.
    It will be automatically be picked up from the material group
    You can change it also.
    Unloading Point     O     Specifies the point at which the material is to be unloaded.
    Recipient     O     Specifies the recipient for whom the material is destined.
    Click   to see and to change the Tax Code at item level.
    Select    to view the taxes applied on the line item.
    click   to go back to the previous screen .
    On the main screen in the same tab if you want to change the taxe select the tax code from the drop down available
    After selection again, Select    to view the taxes applied on the line item.
    If you want to add more conditions click   tab and enter the conditions from the drop down
    You can also maintain the text at item level by clicking   tab.
    After completeing this all click   to check wether here is any error in the purchase order , If there will not
                             ↓
    any error then on the screen following line will appear.
    If there will be some error the system will throw the message on the screen
    select the line item and click   to see the detail of the error.
    close this window now and goto main screen to rectify the error.
    After rectifying the error again click   to check wether here is any error in the purchase order.
    Now click   to save the purchase order, after clicking the button the following message will appear

  • Purchase Order creation using Contarct

    Hi,
    The refer the following scenario:
    We have created two company code 1000, 2000; both having diferenet Currency.
    We have created Plant 1000 under Company Code 1000 & Plant 2000 under Company Code 2000
    We want to create only one Purchase Organization 1000
    We want to create one contract for Purchase Organization 1000.
    Using the same Contract, we want to create Purchase Order for two different Plants 1000 & 2000.
    Is is advisable/ possibe to create Purchase Order for two different Plants 1000 & 2000 belonging to two different Company Codes having different Currency using common Purchase Organization?
    Regards,

    Hi,
    Thanks for the reply.
    I have created a Purchasing Org COMM.
    I have not assigned it to any Company Code
    When I am creating a Contract using ME31K, afer entrering Vendor, Agreement Type, Agreement Date, Purch. Organization & Purchasing Group, the System gives a pop-up with the following message:
    The purchasing org. COMM has not been assigned to a CoCode Please enter a company code
    What does it mean?
    As per my thinking, we can create the Contract for one company code, say 1000;
    Down the line, now we want to create Purchase Order for the Plant 2000, which is not assigned to Company Code 1000 --- Will the System allow us to do the same??
    Regards,

  • Customize Standard Purchase Order template

    We have requirement to customize the 'Standard Purchase Order Stylesheet', XSL template. I am trying to follow the below approach;
    1. Use standard oracle template 'PO_STANDARD_XSLFO.xsl' and customize it as per client requirements.
    2. Create a template definition 'XX Custom Purchase Order stylesheet' similar to 'Standard Purchase Order Stylesheet' in 'Purchasing' responsibility and upload my custom template.
    3. Navigate to Purchasing Super User > Setup > Purchasing > Document Types > 'Purchase Order Standard' > Update Document Type layout > replace 'Standard Purchase Order Stylesheet' with 'XX Custom Purchase Order stylesheet'.
    Please let me know if i have missed any steps.
    Appreciate your time.

    Another approach is to create a new RTF using the tags generated by the PO Output for Communication program. The tags are generated by the columns in the PO_XXX_XML views.
    Sent from my iPhone

  • Coding to calculate net purchase order value against the contract?.

    Hi ,
    Please help.
    Can any one send me the coding to calculate net purchase order value against the contract?.
    Thanks

    I got the below coding and information from SDN, would you please help me to fix this coding
    infomation from SDN
    For the above requirment I have coded a program in Endroutine but it is not populating cummulative Order value against Contract.
    DATA:
    WA_ty_t_TG_1 TYPE tys_TG_1.
    data: netsum type char15.
    types:begin of ty_net,
    netsum type /BI0/OINET_PO_VAL,
    V_EBELN TYPE /BI0/OIOI_EBELN,
    end of ty_net.
    data:t_net type standard table of ty_net .
    data:wa_net type ty_net.
    SORT RESULT_PACKAGE BY CONTRACT.
    loop at RESULT_PACKAGE INTO WA_ty_t_TG_1.
    WA_NET-V_EBELN = <RESULT_FIELDS>-CONTRACT.
    AT END OF CONTRACT.
    netsum = WA_ty_t_TG_1-NET_PO_VAL + NETSUM.
    ENDAT.
    WA_NET-netsum = NETSUM.
    APPEND WA_NET TO T_NET.
    CLEAR:T_NET,NETSUM.
    ENDLOOP.
    loop at RESULT_PACKAGE assigning <RESULT_FIELDS> .
    READ TABLE T_NET INTO WA_NET WITH KEY
    V_EBELN = <RESULT_FIELDS>-CONTRACT
    <RESULT_FIELDS>-/BIC/YNET_VAL = NETSUM.
    CLEAR: WA_NET-NETSUM.
    endloop.
    <RESULT_FIELDS>-/BIC/YNET_VAL = netsum.
    CLEAR:NETSUM,<RESULT_FIELDS>-/BIC/YNET_VAL.
    ENDLOOP.
    I have coded above one..let me know what mistake I have done.in the bolded loop I have given INTO instead of Assigning, because I need all records which assigns to WorkArea, but while executing DTP its leading to shortdump.if I replace Assigning statement,its working fine. but zero values in output( I think wrong in logic part)
    Let me know the brief coding part if I am wrongly coded.

  • With reference to contract Purchase Order Analysis report.

    Hi,
    I need SAP Standard " With reference to contract Purchase Order Analysis report"
    Regards,
    Priya.

    Hi,
    there is no standard report to get the PO list wrf to contracts,
    but you can get through SE16 from the table EKPO, where you have to pass the contract numbers ( get through ME3L,ME3M or ME3C ) in the field KONNR,
    lakshmi reddy

  • Unable to preview Contract Terms for Standard Purchase Order

    Unable to preview View Contract Terms for Standard Purchase Order,displays error
    We have defined the same contract terms and Document type layouts to documents Contract Purchase Order and Standard Purchase Order.
    Created a Contract PO,Attached a template able to preview the contract template in PDF successfully
    Created a Standard PO,Attached a template not able to preview the contract template in PDF
    Displays the foll error
    Problem: The system could not generate the PDF document.
    Reason: The system detected an error in the following code/object.
    Code: XML
    Object: PO
    Action: Please contact the system administrator and try again
    ### Steps to Reproduce Problem ###
    Steups
    Created a custom XSL-FO template for Contract template and defined it for Standard PO and Contracts PO.
    Steps to Reproduce
    1.Create a PO,give any category of 100 Qty
    2.Click Terms and CLick Author Contract Terms\
    3.Select the custom Template ,Click Apply Template
    4.Click Preview.
    Following error displayed
    Problem: The system could not generate the PDF document.
    Reason: The system detected an error in the following code/object.
    Code: XML
    Object: PO
    Action: Please contact the system administrator and try again
    Please Note:The above scenario works for Contracts PO.
    The problem is only for Standard PO
    We have reviewed note:454479.1
    The file version of POXVCOMB.pls 115.69.11510.28
    But we have another test instance this also has the same version , the scenario works fine
    So we are confused why this is reproducible only for a particular instance with same file versions
    If anyone can suggest a solution pls give me a reply
    Already SR is logged for the same -SR 3-1272761221, awaiting reply from support

    Please reply if any update on the above query is present.

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Copying of Service items from contract into Purchase order

    Dear Friends,
    We have upgraded from 4.6B to ECC6.
    Previously when we create Purchase Order with reference to Contract(i.e.Release order),we select service line items by selecting service selection button from PO and select the service line items from Contract,then whatever the line item whether line item 30,or line item 60 copied from Contract is copied into line item 10 of Purchase order in 4.6B version.
    But in ECC6 ,it is copied into other line item but not copied into line item 10 of purchase order.
    Please suggest ,what needs to be done, what went wrong.
    Regards,
    Dayanand

    Hi,
    Pl. elaborate whether the quantity 1 is appearing at Item Overview level or at Item Details level. At the item overview level the quantity will aleays be 1 with unit of measure as AU. At item details, you will be able to view the actual quantity of services copied from contract.
    Regards,
    Prashant
    - Pl reward points if answer is helpful to you

  • Sub Contracting Purchase Order

    Hi All
    What is table name and field name to see the alternative BOM status for Sub Contracting Purchase Orders?
    Example:
    I have a Material :Shaft, which has two alternative BOM's.
    When i placed the Sub Contracting order to the Vendor. System will explore the BOM and display the list of components.
    How to know that Which alternative BOM system taken to the PO?
    Can any body please suggest me the table name and field name?
    Thanks
    SUNIL

    Hi
    if you are working with Alternative BOM in sub contracting. the system works as follows
    first of all you should mantian the Sub-Con Info record for subcon  that in purchasing view you will have the production version, here you have to attach which production version you want to use asd as you know that the production version depends on your BOM and this BOM will inturn get exploded into PO, as you know that info record is the combination of Vendor and Material, only for this combination your alternate BOM will explode
    Hope i answered your question
    Regards
    VIkrama

  • Best Practice while creating Contract, Purchase Requisition, Purchase Order

    Hi
    What is the best practice with respect to Contract & Purchase Requisition?
    IN T Code ME31K, there is a button Reference to PReq, meaning that we can create contract with using Purchase Requisition. (We have done the same)
    While creating the Purchase Order using Contract, we could find Purchase Requisition reference in the Purchase Order; similarly when we created the Purchase Order using Purchase Requisition, we could find Contract reference in the Purchase Order.
    I have done the following:
    1. Create a Contract.
    2. Create a Purchase Requisition
    3. Assign Requisition and Create Purchase Order using T Code ME57.
    4. Create Purchase Order
    Here in this case we could find references of both Contract & Purchase Requisition.
    I just want to know what Practice should we adopt / advise while creating Contract, Purchase Requisition. & Purchase Order?
    Regards,

    Hi,
    In ME51N Screen, enter Contract number in the "AGREEMENT" TAB and if more items in the contract, you can mention the item number in the next TAB to the AGREEMENT TAB and then proceed with creating PR by entering other details. This TAB you can find in the 4th column from extreme right end of PR screen.
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Sep 10, 2009 2:23 PM

  • MM- Contract purchase order

    Dear all,
    can any one tell me how  to create contract purchase order????
    Regards,
    Shoiab

    Hi,
    ME31L  is for scheduling agreement, if you want TO crate standard Contracts Use ME31 and select the type of contract that you want.
    AND Create a PO using ME21N and reference you contrct,however if you have release strategies on your contract make it is released befor you create a PO.
    Thanks
    Silas

Maybe you are looking for

  • Attachments during the Ordering Moment

    Can attachments be added to a request during the ordering moment? We would like to allow customers the abilibty to add attachments prior to submitting a request.  Is this possible? Thank you, Brian

  • Album Art not showing in Artists view!

    My issue is that the artwork shows in the Albums view but when I switch to Artists view, some dissapear. Check "Demi Lovato", "Avril Lavigne" and "El Cuarteto de Nos" for reference to my problem. Hope to get a solution

  • I had trouble connecting my External hard drive

    I had trouble connecting my External hard drive (My passport WD) with my macbook. It worked before but not now. The external hard disk is blinking and is spinning but just not showing up on my computer. I tried looking in disk utility and no theres n

  • When i have a web page which includes an SVG file that spans 2-3 pages, if i try to print the web page it only prints the first page.

    Basically, i have an html file that embeds a large SVG file. When i try to print the html file, FF only recognizes the first page - basically the second, third, fourth pages do not appear. Is this a known issue with FF? Can it be fixed? FYI - Google

  • Another PPC/Intel node question!!!

    Hi MacAddicts, I've searched the forum but didn't get an answer about this. I want to connect a PowerBook(host)to an Intel Mac mini as the node(the poor man's HD setup!!). I'm on LP 7.1.1 on Panther. Can i install the node app. from 7.1.1 on the inte