Contract Replication SRM 7.0 for ECC 6.0

I am in the version 7.0 of SRM and I need to send the contract PCTR of SRM for ECC 6.0. 
- Connections SM59 is well; 
- Attribute CT_PROC_TY of the structure is well; 
- Transaction Types and Number Screech is well; 
- IDOCs BLAORD y defined COND_A in WE20 is well; 
Did I forget something? 
All creates the contract and I try to distribute the same, the mistake below it is exhibited: 
" Could not determines back-end system goes contract " 
Determination of Back End is well. 
Some idea?
Rgs,
Pedro

Hi, Pedro:
It is SRM Extended Classic mode?
You want to transfer the contract to ECC?
Please check the ECC and SRM both sides of the scope of the contract number.
Sarah

Similar Messages

  • Central contract in SRM 7.0 with ECC 6.0

    Hi
    We are using SRM 7.0 with ECC 6.0
    When we create contract in SRM 7.0 & Trying to distribute to Backend as Contract, It is showing error in BBP_PD as below
    HEADER I1015 Awaiting Approval
    HEADER I1021 Created
    HEADER I1038 Complete
    HEADER I1141 Released
    HEADER I1180 Document Completed
    HEADER I1193 In Distribution
    HEADER I1195 Distribution Incorrect
    0000000001 I1143 Item is Active
    Badi BBP_DETERMINE_LOGSY is activated to define backend system
    No IDOC is also generated.
    No errors in MOnitor also
    Not sure what is message type needs to define & what else is needed
    Regards,
    NNK

    HI
    Need to do following
    1. Keep conidtion types in ECC & SRM same for contract.
    2. Also Add message types BLAORD & COND_A manually in ECC in WE20.
    Then only it works
    Regards,
    NNK

  • Error in Releasing Contracts in SRM-Error Log for user WF-BATCH

    Hi,
    When we are releasing contracts in SRM, an error log is being generated for a user WF-BATCH with message :
    "Recipient not found
    The error ocurred by processing event RELEASED_NEWLY with GUID 4530EA86C23B007700000000B0000023 and object_id= 4400000238"(Where 4400000238 is our contract no)
    Also our contract is not being transported to CCM even though all the relevant configurations have been done in XI.
    Is this because of the error log?? What is the issue??
    Any Useful answers would be suitably rewarded..
    Regards,
    Puneet

    Hello Puneet,
    Please check whether u have released that contract or not.
    if u need to release purchase order from the contract, it needs to be released first.
    from ur problme statement, it seems u haven't released that contract.
    Sarabjeet

  • Problems in Contract Replication SRM

    Hi Experts,
    I need your help....i'm trying to make the contract replication from backend system by the program BBP_CONTRACT_INITIAL_UPLOAD.
    But there is a message erro in coditions as down
    ''End of discount condition validity > end of price condition validity''
    The replicate will work but all the contract cames in SRM with memorize status and i have to edit all the contracts...
    if i change the date of condition in r/3 contract, i can make the replicate without problem. But this is not a correct solution.
    there is a way to solve this?
    I saw the notes in SAP but my Support Package is the last one (SAPKIBKT11)
    Thanks all
    gustavo

    Hello Gustavo,
    We are facing the same problem and are trying to figure out the solution from you inputs.You have suggested 2 options
    1. BADI : BBP_CTR_BE_CREATE
    But this BADI will be called when a contract is to be created in the backend and how will this BADI be helpful when we are replication/uploading contracts from backend R3 to SRM
    2. Maintain same pricing conditions in both R3 and SRM: could you explain in details what you are trying to say.
    Thanks
    Raghu

  • Badis for Central Contract Replication from SRM to ECC

    hi
    experts
    i am working on a scenario of replicating the central contract from SRM 0.7  to ECC via XI/PI
    let me know what are the Badis to be implemented in ECC for the Same
    looking forward for your  reply

    Hi,
    You do not need any Badi in ECC to distribute central contract to your backend system.
    if your ECC system is on ECC 6.0 enpk 4.0 or more,
    you can directly distribute your central contract from SRM to ECC system using standard ESOA services.
    Thanks and regards,
    Ranjan

  • Central Contract Mngt: Contract Confirmation Out not triggering from ECC

    Hi,
    Can some one take a look at this and let me know if you have any suggestions
    After following note 1268821 we have Contracts replicating from SRM to ECC via PI. However we are not getting the Contract Replication Confirmation Out triggering from ECC to SRM   The configuration in PI is waiting to receive PurchasingContractSRMReplicationConfirmation_Out from ECC for delivery to PurchasingContractSRMReplicationConfirmation_In in SRM.
    Does anyone know what we maybe missing, perhaps a setting in ECC that will trigger the Confirmation Out to SRM?
    Any help much appreciated.
    Che

    Just an update.
    It turns out that ECC is generating message PurchasingContractERPConfirmation_Out which is contrary to what we are expecting PurchasingContractSRMReplicationConfirmation_Out.
    Have logged it with SAP support for now.

  • SRM 7 ehp1 with ECC 6 ehp5?

    Gurus,
    Is it mandatory to use SRM 7 ehp1 with ECC 6 ehp5? Our client has ECC 6 ehp 4 and is now upgrading from SRM 4 to SRM 7 ehp1. Can you share some links where I can confirm if SRM 7 ehp1 with ECC 6 ehp5 is mandatory?
    Also pl let me know what is the difference between shopping cart creation in SRM 4.0 and SRM 7.0 ehp1. SAP says they have changed something and made it more user friendly. Is it different from normal SRM 7 (without the ehp component?)
    Regards,
    John

    Hi,
    There are 3 ways of sending PO from SRM to ECC
    1.Via - RFC ( by setting the system landscape to a lesser version ) it will not have any side effects just that it used RFC connections instead of ESOA
    2.Via PI - by setting  the landscape to the current version and configure the relevant XML services in the SOAMANGER
    3. via Non PI Web Services- by setting the landscape to current version . This time the webservices are configured in SRM system itself.
    I have configured transfer of Contracts from SRM 7.01 to ECC 6.5 EHP5 as Contract/ Scheduling Agreement to the backend with Non PI Web Services(via XML). This way we didnt have to install PI at the client place which saved them a lot.
    I have written a blog on how to transfer central contracts from srm to ecc using web services but without PI , please find the link below and hope it is helpful.
    http://scn.sap.com/community/pi-and-soa-middleware/blog/2012/06/13/transfer-of-central-contract-from-srm-to-ecc-using-web-services-without-pi
    Regards,
    Naveen

  • Uploading contracts into SRM from flat file...

    I am asked to develop this program but I am not sure what transactions are involved and what approach to take.
    I know how to upload the file but not sure how to upload the contracts to SRM.
    Thanks for the help.

    Hi Rakesh,
    I have encountered the same difficulty in creating the contract as well. Thanks for your code sample. I have tried to follow it closely but still i am not successful. Is it possible for you to take a look at my code?
    data: pc_id like CRMD_ORDERADM_H-OBJECT_ID.
    data: pc_header_out like BBP_PDS_CTR_HEADER_IC.
    data: pc_header_in like BBP_PDS_CTR_HEADER_D.
    *data: pc_item type table of BBP_PDS_CTR_ITEM_D with header line.
    data: pc_item type table of BBP_PDS_CTR_ITEM_ICU with header line.
    data: pc_text type table of BBP_PDS_LONGTEXT.
    data: pc_partner type table of BBP_PDS_PARTNER.
    data: wa_part like line of pc_partner.
    data: pc_org type table of BBP_PDS_ORG with header line.
    data: pc_message type table of BBP_PDS_MESSAGES with header line.
    Insert dummy data*****************************************************
    pc_header_out-CURRENCY = 'SGD'.
    pc_header_out-PROCESS_TYPE = 'PCTR'.
    Insert Purchase Org data *********************************************
    pc_org-PROC_ORG_RESP_ID = 'O 50000026'.
    pc_org-PROC_ORG_ID = 'O 50000025'.
    pc_org-PROC_GROUP_ID = 'O 50000026'.
    Insert BP data - vendor, employee Purch Org and DSTA******************
    *DSTA
    wa_part-PARTNER_ID = '0000000001'.
    wa_part-PARTNER_GUID = '4BD22A16AFA2B74D844E1595998AE7E5'.
    wa_part-PARTNER_FCT = '00000038'.
    wa_part-ADDR_TYPE = '1'.
    wa_part-ADDR_NO = '0000010469'.
    append wa_part to pc_partner.
    clear wa_part.
    *employee
    wa_part-PARTNER_ID = '0000000006'.
    wa_part-PARTNER_GUID = 'E3D4AAE842930D41B7B107F3CC60B44D'.
    wa_part-PARTNER_FCT = '00000026'.
    wa_part-ADDR_TYPE = '3'.
    wa_part-ADDR_NO = '0000010472'.
    wa_part-PERS_NO = '0000010474'.
    append wa_part to pc_partner.
    clear wa_part.
    *vendor
    wa_part-PARTNER_ID = '0000000311'.
    wa_part-PARTNER_GUID = 'F0BC646129BE2D4BB7E301F8F3708B1E'.
    wa_part-PARTNER_FCT = '00000019'.
    wa_part-ADDR_TYPE = '1'.
    append wa_part to pc_partner.
    clear wa_part.
    *purch org
    wa_part-PARTNER_ID = '0000000002'.
    wa_part-PARTNER_GUID = '48459C575651D04091BAF1B9A554CF51'.
    wa_part-PARTNER_FCT = '00000051'.
    wa_part-ADDR_TYPE = '1'.
    wa_part-ADDR_NO = '0000010470'.
    append wa_part to pc_partner.
    clear wa_part.
    Item data
    pc_item-CATEGORY_ID = 'ARMOUR'.
    pc_item-QUANTITY = '233'.
    pc_item-PRICE = '1234'.
    pc_item-VALUE = '4321'.
    pc_item-UNIT = 'EA'.
    pc_item-PRODUCT = 'B78A60018B6018418F6D0F1632E10F69'.
    pc_item-DESCRIPTION = 'Russian T72 Tanks'.
    *--Reset Buffer Tables
    CALL FUNCTION 'BBP_PROCDOC_RESET_BUFFER'.
    Create PC*************************************************************
    call function 'BBP_PD_CTR_CREATE'
    exporting
    I_HEADER = pc_header_out
    importing
    E_HEADER = pc_header_in
    tables
    I_ITEM = pc_item
    E_PARTNER = pc_partner
    I_ORGDATA = pc_org
    I_LONGTEXT = pc_text
    E_MESSAGES = pc_message.
    write: pc_header_in-guid.
    the guid return all 0s. The error message in pc_message is supply only one type of vendor and one type of responsible employee. Thanks for taking time to read this. I will really appreciate if anyone is able to help me solve this. Of course point will be rewarded. Thanks again!

  • Request for PO attachment replication from SRM 4.0 to ECC 5.0 in Extended C

    Hi All,
    I want to replicate the Purchase Order Item Level attachment from SRM 4.0 to ECC 5.0 in Extended Classic Scenario.
    Please let me know the procedure for the same like related BADIs in SRM and ECC.
    Could you please send any documents related to Document Manage System to my gmail id sudarsan.srm ?
    Best Regards,
    Sudarsan

    Hi All,
    I did the following Steps to replicate PO Attachments from SRM 4.0 to ECC 5.0 in Extended Classic Scenario as per OSS Note 1057932:
    Step 1: I activated BAdI BBP_CREATE_PO_BACK~Fill_PO_INTERFACE in SRM System and added the following Code
    CV_ATTACH_TRANSFER_ACTIVE = 'X'
    CV_ATTACH_BE_STORAGE_CAT = 'DMS_C1_ST'
    CV_ATTACH_BE_DOC_TYPE = 'SRM'.
    Step 2: I created Doc Type SRM in ECC5.o with the help of DC10 Tr Code.
    Step 3: I maintained Data Carrier Type PC entry with the help of DC20 Tr Code in ECC 5.0 and default ebtries for Front End Computer Details. (I crsoss checked Storage Category DMS_C1_ST in ECC5.0, it is available).
    Step 4: I maintained all the details (document Types) for PC Carrier Type with the help of DC30 as per OSS Note.
    Then I tested the PO attachment replication scenario. I could not find the attachment in ECC5.0 in PO (ECC5.) which available in SRM PO (SRM 4.0)
    Kindly guide me or suggest me is there any additional settings required to transfer PO attachment from SRM to ECC5.0
    Thanks a lot in adavance.
    Thanks,
    Koyya

  • PI setting for transferring Contract from SRM to ECC - Classic scenario

    Dear Experts
    SRM 702
    ECC 6.0 EHP6
    SRM - Classic scenario
    Need to understand PI setting for transferring Contract from SRM to ECC, as currently document Central Contract document getting created in SRM, but it is not getting transfer to ECC
    No XML message getting triggered in ECC systm as well
    can you help me in this
    if any additional information needed, pls revert
    Regards
    Prashant K

    Fully approve and release the contract. It will trigger the XML Message.
    Go to https://websmp203.sap-ag.de/~form/handler?_APP=00200682500000002672&_EVENT=DISPLAY&_SCENARIO=01100035870000000122&_HIER_… and download the configuration guide & check the PI setting and required Software Components in PI.

  • SRM 7 - Contract replication from ERP to SRM

    Hi all,
    We have SRM 7 and ECC 6.0 and we have a requirement to have contract handling for invoices functionality, in SRM, in order to create invoices with reference to a contract directly.
    We want to have ERP system as the central repository for all contracts, meaning that we need to replicate the contracts to SRM, and all the changes made to the contract in ERP side should also be replicated to SRM.
    Does anyone know if this scenario can be done as per standard?  And if so, how can we replicate the ERP contracts to SRM and ensure that all the changes made in ERP will be replicated to SRM?
    Thanks in advance.
    Regards,
    AN

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • Badis for PO and Central Contract in SRM 7.0 in classic

    Hi everyone,
    I need you help. We are working in a implementation of SRM7.0 with ECC 6.0 Ehp 4 in a classic scenario. We want to know which badis we can use in order to change the purchasing group of the PO an Central Contract when their are transfered to ECC.
    BR,
    Ivá

    Hi Muthu,
    We are wondering if it is posible the following:
    - An user wants to create PO form SRM. This PO in SRM has the Purchasing group XXX, but (for any reason) we need when this PO is send to ECC, the system changes the purchasing group to YYY.
    BR
    Ivá

  • Distributing Central Contract from SRM to ECC

    Hi,
    We are using SRM 7.0 with ECC 6.0 in backend (no EHP). We're setting up a central contract with IDOCs. From what I read we have made the configuration:
    in SRM:
    - Assign attribute CT_PROC_TY = CCTR
    - Connfigure new condition type PB00 which is the same with ECC price for contract
    - activate the BADI BBP_DETERMINE_LOGSYS and coding it so for contract it will always go to backend (in method CONTRACT_LOGSYS_DETERMINE)
    - I have activated BADI BBP_CTR_BE_CREATE but writing no code, as there no need for me to do mapping
    in ECC:
    - Activate inbound IDOC type BLAORD and COND_A and assign it to the logical system of SRM
    Then I create the contract in SRM. but:
    1. When creating contract, in item overview, i cannot tick 'distribution' indicator. Not sure what is the function
    2. In item detail, tab distribution, I cannot put create release-purchasing org. Even when using search help it is not giving any value
    Actually dont really understand the usefull of the indicator above, so I let it be empty, then I release the contract
    The contract then not appear in ECC. I have checked SMQ1/SMQ2 nothing. Even in WE05 in ECC nothing. The only thing I see is in SLG1 where I see error triggered by user WF-BATCH with message "No recipient found"
    Do i miss something in here? Any help will be very appreciated.
    Josh

    Hi Josh,
    Central contract is only possible in SRM 7.0 with ECC 6.0 EHP 4. You can use local contracts or GOA.
    Regards.

  • Issue with Contract Replication from SRM to MDM  - XML structure

    Hi
    We are having an issue with trnsfering a contract to MDM. We have released the contract for update to MDM in the contract through the distribute to catalog option. An XML is generated in SRM that gets sucessfully passed to PI through Catalogupdatenotification_out. In PI the XML fails in the Interface Determination step. the issue that has been noticed is that the XML that is generated in SRM does not contain product category or product ID which is basically what the condition mapping in PI checks for. The conditions in PI were setup as per SAP.
    But now the XML fails in PI because it does not find a combination for Catalog type code = 03 and product category. Please find the XML structure in SRM and you will see that it does not have a product category even though the contract has one.
    <?xml version="1.0" encoding="utf-8" ?>
    - <n0:CatalogTransmission xmlns:n0="http://sap.com/xi/EBP" xmlns:prx="urn:sap.com:proxy:SS1:/1SAI/TASDE808778FFEB81012891:701:2010/10/07">
    - <StandardBusinessDocumentHeader>
      <ID schemeID="0080">56000004100000000220110616202243</ID>
      <CreationDateTime>2011-06-16T20:22:43Z</CreationDateTime>
    - <SenderParty>
      <InternalID schemeID="PartyID" schemeAgencyID="SS1CLNT100">143</InternalID>
      </SenderParty>
      </StandardBusinessDocumentHeader>
    - <Catalog>
      <ID>5600000410</ID>
      <CatalogTypeCode>03</CatalogTypeCode>
    - <NameList>
      <Name>(Copy of Contract 5600000395)</Name>
      </NameList>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>true</CompleteTransmissionIndicator>
    - <ValidityDateTimePeriod>
      <StartDateTime>2011-06-13T12:00:00Z</StartDateTime>
      <EndDateTime>2012-06-12T12:00:00Z</EndDateTime>
      </ValidityDateTimePeriod>
    - <CatalogContent>
    - <ItemList>
    - <Item>
      <ID>1</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">1.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
    - <Item>
      <ID>2</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">12.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
      </ItemList>
      </CatalogContent>
      </Catalog>
      </n0:CatalogTransmission>
    Edited by: vishakhrajeev123 on Jun 20, 2011 6:49 PM

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • ECC - Central contract via SRM - condition Item button does not work

    Hi,
    After the creation of a central contract via SRM, I checked if all the condition types are taken over to contract in ECC.
    When selecting the item line and clicking on the condition button, it works correctly. After going back, to the main screen where the items are displayed I click once again on the condition button. Now it does not show anything, nothing happens.
    I have been looking for an OSS Note but couldn't find any. May you an OSS Note that I can use to solve this issue.
    Regards,
    Alexander

    hi Alexander,
    Do you get any error message.Can you check the konp and konh tables if entries exist
    regards,
    Lalita

Maybe you are looking for

  • LG Lucid stuck in Emergency Call mode

    Phone said "no service" all day; restarted, reseated SIM card, nothing works.  Help!

  • Purchase and Sold Prices

    Hi gurus,    Could someone tell me how to retrieve the purchase price according (Table MBEW, I don´t know which is the right field) to a given material Number (MATNR)?   Besides that, could someone tell me wether there´s a BAPI to retrieve Sold price

  • Caching of old class files

    Ok, I have a problem with oracle which appears to be that it is caching an old version of a class file. I get a class not found exception but the thing is the package that the error message is refering to doesn't even exist anymore and isn't refrence

  • Web export / integration with website

    Hi I am wondering if there is a tutorial about integrationg webgalleries from lightroom into an existing website. I have been googling but not found a lot. would like to integrate flash galleries with existing navbars etc... any links/ posts ? thanks

  • Permissions problem with PC/itunes/Ipad

    Hi. I'm using Windows 7 professional(on a pc) with an ipad 2 and I've just started getting a message 'file could not be copied because you do not have permission to see its content'. It's only started in the last 24 hrs, and was working fine previous