Control invoice verification after quality inspection

Dear all,
I want to restrict vendor invoice verification to be done after quality notification, I set QM control key 0007: Del. release, invoice block in the QM view of material master, then I post GR for a PO with inspection lot created, then I did invoice verification through MIRO it was successful without even a warning message.
Does anybody know how to control this?
Thx
Danny

Hi Danny,
MIRO will be processed, but you will get message as "Blocked for Payment". You can see the reason for block and clear the block in MRBR. Ensure that in PO indicator GR-Based Invoice Verification is flagged.
For more details Block the payment if inspection lot is not cleared by quality
Thanks & Regards,
Ramagiri

Similar Messages

  • MIRO after Quality inspection..?

    Hi guru
    Can anybody explain me , how to make the MIRO process after Quality inspection done.
    1. MIGO done,
    2. Materials moved to quality
    3. If materials ok then MIRO or If not ok the system should not allow to do MIRO. is it possible in SAP
    If yes what are all the configuration settings..
    Thanks
    sap-mm

    HI,
    I was telling you the case if QM is not active.
    if its active
    General Procedure for a Goods Receipt Posting
    When goods are delivered to a warehouse, they are frequently held for inspection before being posted to unrestricted-use stock for consumption or issue. If the control indicator for posting the goods to inspection stock is active for the inspection type, the stock is assigned a stock category that is retained until the goods have been inspected and released. Goods that are posted into inspection stock are not available for consumption or issue.
    When an inspection lot is created automatically, all stock postings are carried out by the QM component. As a result, you can make stock postings using the functions within the scope of the usage decision.
    The QM component creates an inspection lot and maintains the stocks for the material if:
    QM is active for the inspection type
    The control for posting the goods to inspection stock or goods-receipt blocked stock is active for the inspection type
    The inspection lot is created automatically
    The goods receipt process can be summarized as follows:
    The goods receipt is recorded in the inventory management system.
    - The quality level is checked
    - The inspection lot is created (automatically)
    - The quantity is posted to inspection stock or goods-receipt blocked stock (automatically)
    - The sample size determined (automatically)
    - The sample is taken (manually)
    The goods are inspected by the inspector.
    The inspection results are recorded in the QM component.
    A usage decision is made for the inspection lot in the QM component.
    - The quantity is posted to unrestricted-use stock
    - The quality level record is updated (automatically)
    regards

  • Batch creation after quality inspection

    Hello friends,
    I am using a raw material with batch management. I dont want to create batch  when goods receipt takes place in MIGO . I want to create batch when i post quality stock to unrestricted use  after quality inspection.
    How can i do this?
    Please help me.
    Thanks!

    hi kiran
    When you are creating a Gr for raw material (for which you have activated Batch MGt) ,If you do not enter Batch number then Batch number is  not be attched to raw material....but when you process the lot /take UD then By batch Magt you can create/asign batch to raw material.
    this is possible in Batch MGt.
    .I hope you have now created char (MIC with Class type 23) now You must have used it in QP01.
    2.Now create a lot using MSC1N
    3.create a inpecion lot(migo)
    4.While result recoding system will ask for batch,Enter bach you have created in MSC1N..
    5.Take UD .save
    All the char will be get copied to batch as per spro setting .these result can be seen in batch MSC3N.
    settings:
    Go to QCC0->Quality inspection->Inspection lot completion-->transfer inspection decision to batch
    Regards
    Sujit Gujar

  • After quality inspection

    Hello,
    After quality inspection what happen to the material??

    Please note the example
    While you are in QA11 for stock posting scree will as like below where 500 is total quantity to be posted which is presently in Quality stock
    Quantity Posted                                 To be Posted
    Total                          0.000                                500
    To unrestricted use  0.000
    To scrap                   0.000
    To sample usage       0.000
    To blocked stock       0.000
    To new material         0.000
    To reserves               0.000
    Return Delivery           0.000
    You can split the quanty 500 to be posted as you  wish like
    Quantity Posted                                 To be Posted
    Total                          0.000                                500
    To unrestricted use  0.000                                 400
    To scrap                   0.000
    To sample usage       0.000          
    To blocked stock       0.000
    To new material         0.000
    To reserves               0.000
    Return Delivery           0.000                               100
    and press enter
    Thanks & Regards
    Rajendran
    Edited by: Poovancheeri Rajendra on Feb 21, 2011 4:32 PM
    Edited by: Poovancheeri Rajendra on Feb 21, 2011 4:33 PM

  • Logistics Invoice verification and Quality Management

    Hi,
    We have good receipts in purchases orders, with materials that must pass quality inspection (with SAP QM quality management)
    I need to know if there is any u201Cstandardu201D way to connect quality management with logistics invoice verification; the requirement is that the invoice cannot be released to payment (unblocked) until the materials of the goods receipt have passed the quality inspection.
    Thank you very much for your help!!
    Manuel

    Dear ,
                  Here is the path
    IMG>> Quality Management -->QM in Logistic --> QM in Procurement -->Define Control Keys
    now here After Defining the Control Key, Go to QM in Procurement Tab
    and Check the Block Invoice Checkbox
    This may help u
    REgards,
    Pardeep Malik

  • How to move the stock after quality inspection in wm

    hi ,
       if i am posting GR with PO  for the material XXXX quantity of 10  it should not be posted in Warehouse. after completion of stock inspection in QM then only it moved to warehouse . But the problem is when i post gr in migo the transfer requirement created automatically...if i make this  TR manual, two posting occurs one for gr posting  and another one for manual tr...how to control this....
    ex: matxxx-10 quantity
    migo posted(no stock should be posted in wm)
    after qc--8 quantity o.k
    then we need to move this 8 quantity to storage bin.
    how to achive this process in WM. (i already working manual TR it will create two posting)
    Thanks
    Muthuraman.D

    Hi,
    Use movement type 103 for GR. so, the goods will posted in to blocked stock.  you deselect the auto TR creation for 103 movement type.
    once the Quality inspection over the do the 105 to release blocked stock to unresticted stock. in 105 you activate the auto TR creation.
    Now you may avoid double tr creation.
    this you have to discuss MM consultant also. because of 103 & 105 movement type using.
    SAM

  • Reverse Goods receipt after Quality Inspection...

    Hi Expets,
    I'm able to do the GR reverse  after the Quality inspection Lot also using mb01 and mov type 102.The stcok is also updating as soon as i do the reverse. Here my questions are.......
    1)Why  I need to do the cancel of Inspection Lot since there is no effect on stock postings by cancellation and stock postings are effected by GR only.
    2) GR = 10 qty
        Inspection  Lot  = 5 Unrestricted, and for remaining UD for 5 has not been made.
    here I'm able to do the reversal of GR  for 10 Qty and I did also. and same time I,M  not able to do the cancellation of Lot because the qty 5 is still pending, for this If i post the qty 5 to un restricted in the Lot  and do the cancellation  lot , the stock will be duplicated in mmbe. kindly guide me how to handle this type of issue....
    where reversal of GR for full qty before partial Inspection qty for the lot and completing the inspection lot after GR reversal and cancellation of full Lot
    Regards,
    Sri.........

    Hi Manu,
    For wht Z-Tcode and programme has to be developed ?
    Regards,
    Sri......

  • EWM Scrapping after quality inspection

    Hi guys,
    I'm trying to work out a scenario in EWM but I'm not sure how the standard process should work, hopefully you can help.
    I'm receiving a returns shipment in my warehouse. After Goods Receipt, I transfer the goods to my quality inspection area using POSC. Here, I enter the inspection result via /SCWM/QINSP. Depending on the inspection result, the follow-up task is determined.
    The current behaviour is as described below:
    1. If the product is OK, it can be putawayed via the already exising warehouse task.
    2. If the result is not OK, the product needs to be scrapped. Currently, EWM creates a Warehouse Task to my putaway storage type, and assigns stock type S5 (Scrapping from Putaway) to the product. When I confirm this Warehouse Task, the stock is moved to the putaway area and the stock type is changed to S6 (Scrapping from Warehouse).
    Is this correct behaviour? I would actually expect that the scrapped stock would be moved to the scrapping area (storage type 8040), and not to the putaway area...
    Thanks & regards,
    Oliver

    Hi Juergen,
    The Warehouse Process Type for decision "not ok" (Follow-up action D - Scrapping) is 4020 (Scrap).
    The Destination storage type / bin for this whse process type are 8040 / SCRAP-ZONE.
    As far as I can see, this is correct, right?
    Appreciate your help.
    Regards,
    Oliver

  • How to Cancel MIGO Document after Quality Inspection

    Hi,
    I have done
    1). Purchase Order
    2). MIGO
    3). Quality Inspection
    4). After that for some reason, i need to cancel the MIGO document. When i tried to cancel the MIGO in MBST, i am getting the below error. Kindly help me
    Deficit of BA Stck.in qual.insp 10,000 EA : 101921 1100 1001 REGULAR
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 10,000 EA.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    Note:
    The abbreviations in the short text of this message can have the following values:
    BA = batch
    OR = order
    PL = plant
    PR = previous period
    PU = purchasing document
    RE = reservation
    SL = storage location
    VC = consignment stock from vendor in storage location
    Thanks
    Dharmendra

    Hi,
    Check out this:-
    Re: reverse migo..when UD -inspection is done...
    Quality Inspection in MIGO
    Cancel raw material goods receipt document in MIGO
    pherasath

  • Material not getting reversed after quality inspection

    Hi Friends,
    I want to reverse a material document for material which has been cleared in the quality inspection step. But I am unable to do so. Can you please let me know if there is any way we can reverse material which has been cleared from quality inspection.
    Regards,
    Wasim.

    Hi,
    Please apply the note 175842 by this you can reverse the Quality inspection & cancell the Material Doc.
    Regards,
    Manish Jain

  • Material rejection and invoice verification

    hi all,
    I have take goods reciept for 100nos for a material,after GR material goes to quaity.but after quality inspection it was found that 50 nos quantity has been rejected.
    now i want to post invoice forremaining 50 material.
    my query is that how invoice is posted for remaining 50nos material?we HAVE GR BASED INVOICE VERIFICATION.
    QM procurement key is active in material master.how finance department will know that 50nos are rejected and how invoce verification will taken place for 50nos material?
    thanks in advance

    my query is that how invoice is posted for remaining 50nos material?
    After quality usage decision,only 50 nos is available in unrestricted stock which can be subsequently invoiced.
    how finance department will know that 50nos are rejected and
    how invoce verification will taken place for 50nos material?
    Ask FI dept to check reports - MMBE or MB52,rejected material can be in stock type - blocked or it
    may be moved to separate storage location for scrap.
    Otherwise if you want return rejected material to vendor,do return delivery in quality decision itself.
    You can identify material using 122 movement type in MB51 or ask FI person to check po history.

  • Good receipt in quality inspection

    hi gurus
    i have maintained quality inspcton set up in material master data. now when i do good receipt it is posted in quality inspecton stock. now query after quality inspection how to take stock from quality inspection stock to unrestricted stock .in between this how to do quality usage decision so that rejected material can be returned and  for accepted material invoice cen be posted.if some one have snap shots for usage decision please send it my mail id 
               [email protected]
    points will be rewarded.thnks

    HI,
    Go to QA 32 , you can see the list of inspection lots .
    You can do result recording & Usage decision.
    During usage decision , you can do the stock posting (Unrestricted , returm delivery)  from the stock posting tab in UD screen.
    Ref the link below for more details.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/QMIMUD/QMIMUD.pdf
    Hope this helps you.
    Regards
    K.M.Arun

  • Why there is chanage "Free for payment" to "Invoice verification" aftr MIRO

    Hi Friends,
    Please suggest me why there is a change from "FREE FOR PAYMENT" to " INVOICE VERIFICATION" after posting of MIRO.
    My client is asking this doubt. However i have checked by posting MIRO but failed to find out.
    Please provide a detailed clarification for this doubt.
    Your quice reply in this issue would be highly appreciated.
    Thanks & Regards,
    Naveen Kumar.

    Hi Friends,
    Please find the below question from my client.
    "While booking Invoice with PO by using T.Code MIRO, i set status payment block is "Free for Payment" after positng, it automatically changes from "Free for Payment" to "Invoice Verification" so payment team can not run payment for the item.
    Please help me to resolve it."
    For your information i checked Vendor Master in XK03. status of payment is like Free for payment.
    Please suggsest me correct answer to clarify my client's doubt
    Looking forward for your kind help
    Thanks & Regards,
    Naveen Kumar.

  • How to control quality inspection material to do Invoice verification

    I want to control on which matrial is in quality inspection, I want to bolck for IV. whenever the material not cleared from QM till invoice verification will not done. if clear from QM then IV will process.
    thanks

    Hi,
    If QM is active , you can do that by using suitable QM control key in QM view of the Material master.
    This will allow you to post the invoice , but will stop the Payment for Quality reasons. Once Quality clears the inspection lot, you can clear the invoice block (MRBR) & do the payment.
    But this can be done only if QM is active.
    Refer the link below
    invoice block
    Regards
    K.M.Arun

  • Invoice verification only after quality acceptance

    The GR stage to Invoice verfication as detailed below:
    1.  Once material comes in, the store will check the documents and check the PO and prepare GRN.
    2.  Then, Quality will check the quantity and quality of the item and make necessary QM entry for acceptance / Rejection in the system.
    3.  Finance does the Invoice verfication and makes the payment depending on the due date.
    However, a serious problem arises in this present process at Invoice verfication stage ie., suppose the quality makes delay in checking the quantity and quality of the item and subsequent acceptance / Rejection, there is a scope for making the payment to the vendor even for rejected items since the system allows you to process invoice verification for GRN quantity and make the payment for the same. It is very difficult to recover from the vendor towards rejected items when once the payment is done. 
    Therefore, we need some control in the system at Invoice verfiication stage that the system should  not allow us to verify the Invoice for GRN quantity instead the system should allow us to make invoice verification only for accepted quantity by quality.
    Is there any method to do this ?

    Hi,
    If the material is in quality system should not allow to post Invoice verification. Is it your requirement ? Pls correct me if im wrong.
    The above requirement can achieve with standard SAP settings. You need to activate QM settings for the plant.
    In material master select the Quality Management view, in procuremen data, in QM control key field, select 0007(i.e.Delivery release, Invoice block).
    If the material is in quality you cant post invoice.
    reg
    Durga
    *Assign points if the info is useful