Control Key in Work Center and Routing

Hi Gurus,
Can anybody tell me what is the difference between Control Key we are providing in second tab of work center and the control key we input in routing.
can i use same control keys at both the places.
Regards,
Anand.

Hello,
Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
Almost in all the PP we define same Control key to the work center as well in the routing.
For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
Regards,
Piyush

Similar Messages

  • What are the control functions of Suitability and setup type key in work center?

    Hi all,
    Can any1 plz tell me what is suitability and setup type key in workcenter default values tab?
    what are the functions controlled by these keys?

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • Brightness control keys stop working after booting MacOSX

    I bought a new iMac 27" a couple of weeks ago, and I installed Windows 7 using bootcamp.
    All the control keys (brightness, volume, etc) works ok on Windows until I reboot it in MacOSX. When i start windows again, brightness controls keys stops working, leaving the screen with the maximus bright, which is killing my eyes.
    Reparing boot camp drivers doesn't do the trick. Am I missing something?

    Try fn + the controls. It might be that Windows defaulted to those buttons as F1, F2, etc. Using fn while pressing the buttons will 'tell' Windows that it has to listen to the Bootcamp software and lower the brightness.

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Link between work center and G/L Account

    Hi All,
    I need to link work center to the G/L account in PM Module . I know the link between work center and cost center . But would like to know how MO cost hits which cost element/ G/l account and there assignment
    Thanks and Regards,
    Vivek

    Hi check the below definitions
    Cost centre : Organizational unit within a controlling area that represents a defined
    location of cost incurrence.
    Profit Centre: Organizational unit in Accounting that reflects a management-oriented
    structure of the organization for the purpose of internal control.
    Work Centre: An organizational unit that defines where and when an operation should
    be carried out.
    Regards
    Sreeni

  • Control key not working on MB Pro while connected to windows 2008 server through 2x client. Any ideas? Works on windows through parallels.

    Control key not working on MB Pro while connected to windows 2008 server through 2x client. Any ideas? Works on windows XP through parallels desktop.

    Hello...
    It seems I got it fixed!! I had been trying the Fixit tool from
    http://support.microsoft.com/kb/306759  while typing up there :))))
    This tool is for changing RDP port but running it fixed my problem (I kept the port 3389 intact)!!
    Hope it helps someone.

  • Overhead keys at Work center Level

    Hi Experts,
    Our client needs to assign the Overhead keys at work center level.
    But what we know is, it possible only in Materail throghu overkead group. In simillar way is it possible to build a link to Workcenter.
    Regards
    Sham

    Hi Shyam,
          Ask abaper to insert a filed in document header which retrieves the data at work center level.
    Regards,
    Srinivas Muthyala

  • Selection of technical objects by work center and plant

    Hi there,
    I want to select functional locations and equipments that are diretly linked to a workcenter which you can see in the location tab in the standard-transactions.
    How can I select this data the way from work center (and plant) to the technical objects? Which tables I have to use??
    Kind regards
    Jens

    Try using Function Module ITOB_FUNCLOC_READ_SINGLE.

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Fields for Super BOM, Work Center & Super Routing for Variant Config

    hi! gurus,
    Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
    thank you

    Hi,
    In the Super BOM you need to maintain the object dependencies.
    Workcenter fields are as usual for other production processes.
    Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
    Regards,
    Senthilkumar

  • What is Control Center, Work Center and BTM

    Can someone please explain to me the Work Center, Control Center and BTM?
    Best Regards

    hi amit,
    will u explain more clearly  what do u need??
    workcenter, control center and btm  will come in plant maintance and in guided procedure
    ravindra

  • Work Center and Quality Notification

    Hi
    Can any one help on linking Quality table (QMFE / QMEL) with work centre info from COOIS .
    We have to get the work center from the above Tcode in to our quality data source. When I checked in this field and table it is derived from a structure (AFVGD - ARBPL). Is there any other place or table I can get this work centre data ? We need this in to Quality for control Key (AFVGD-STEUS) ZZ40 only.... Thanks in advance for the help!!!

    Hi ,
    Please check in table CRHD
    Also check this thread for more info
    Table linking Routing and work center.
    -Mayuri

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • Control key not working after repair

    I took my macbook in over the weekend to the genius bar for them to look at the display hinge, from the paperwork it looks like in addition to replacing the display they also replaced the logic board and the wifi card.
    I got the laptop home and the control key is not working. Resetting PRAM and NVRAM doesn't fix the issue, nor does fiddling with keyboard/universal access settings.
    Is this a hardware issue? Do I need to make another trip to the genius bar?

    Hm-m, I got exactly the same problem, got the logic board replaced today, and at home discovered that the control key is not working. Have you found the solution?

Maybe you are looking for

  • Upgrade Stopped - Unable to logon to system

    Windows 2003 Server 64bit , Sql 2005, Upgrade erp2004 -> erp2005. Upgrade has stopped in phase startsap_nbas, and although the system will start you are unable to logon due to the error "error when initialising the work area SYST". On investigation t

  • Error in Interfacing Project Invoices to AR - No Active Project Manager

    I am getting an error while transferring a projects invoice to AR. I am running concurrent program 'PRC: Interface Invoices to Receivables' program from a responsibility that was created as per the client project security requirements. The output  gi

  • Adobe Reader 11.0.1 cannot read Captivate CS5 generated PDF files

         I have a some training programs made with Captivate version CS-5 generated as PDF files. When I try to open them in the new reader, I see only one page (irrespective of the number of pages in the original file) with some garbled data such as "[e

  • Case Insensitive Comparison in Oracle 9i

    hi all in Oracle 10g we have the following statement to enable case-INsensitive comparison: ALTER SESSION SET nls_sort=binary_ai do we have somthing like this in Oracle 9i to enable case-INsensitive comparison thnx Ashu :)

  • Pages.  Shortcut for "send PDF by email"