Hi all,
In my requirement, we have a material which is subcontracted and in the process, we will have some rejection. Hence the rejected material will be received in to the system with an account assignment category (cost centre). For both the line items in the PO, the inspection lot will get triggered, but the requirement is that the lot should not be generated for the rejected material.
thanks & regards
Chaitanya Rayaprolu

Hi Chaitanya,
Well, I observe a functional loophole here.
1.     As you mention, you inward rejected material against cost center, it means you must be using account assignment category K  in PO.
2.     My question is, if the material is rejected, why you are inwarding it against cost center as it consumes the value on your account and not on vendoru2019s account.
3.     Ideally it should be debited on vendoru2019s account if its vendoru2019s fault.
4.     The practice should be, inward all the material irrespective of rejection. Reject the material through 122 movement and proceed for payment for the acceptable quantity.
Letu2019s talk about your scenario where you donu2019t want inspection lot generation
1.     Whenever you inward the material with account assignment category as K the stock gets consumed at the same moment and you observe no rise in stock level.
2.     But if you have activated inspection type 01 in material master, system creates inspection lot for this movement.
3.     Kindly note this inspection lot is stock irrelevant.
4.     That means you need not do stock posting. Only UD is sufficient as the lot doesnu2019t contain any stock.
5.     Albeit you donu2019t want system to generate lot, you may explore user exit QPL10001 and write your own logic that whenever account assignment category is K do not create inspection lot.
Regards,
Anand Rao
Edited by: Anand Rao on May 9, 2011 2:47 PM

Similar Messages

  • PR Creation at Inspection lot creation

    Dear QM Experts
    can we generate Purchase requisition with the creation of Inspection lot, Automatically.
    in my case there are some inspection operation performed by external agency for which he charge some amount for services.
    for this i created a control key of external services and assign this in the inspection plan in a separate operation and enter all the required data like cost element, vendor, Purchasing oganization and material group but when i created the inspection lot , PR is not generated,
    should this requirement be cater by SAP?
    Regards

    Hi,
    Why do not you try here Source inspection.
    During crsation of purchase order lot will get generated .you can inspect material before its coming to your place..
    You have to activate 0101 inspection type active.
    Qinfo record you have activate source inspection.
    Even in procurrement key in custamizing you can have option if material get rejected.
    Once purchase order created to create lot you have run transaction QI07.where you can click on create lot.after saving this transaction you can get lot..Then you record result as per toyr requirement like from external services.
    Regards
    SANIL

  • Restrict creation of inspection lot for certain work centers

    Hi
    My client needs to restrict the creation of inspection lot at certain work centers although QM is active for all material processed in these work centers.
    I am using the  function module 'EXIT_SAPLQAAT_002' of QAAT0001 for this purpose. Z04 inspection type ( with Post to insp stock) is maintained for all these material.
    A different Z table is there , where material-work center combination is maintained for which no inspection lot is required.
    Logic provided so that system searches Material-Work center from production order then compares it with the Material-Work center combination with the maintained Z Table.If both found same then no inspection lot will be generated.
    But an error message (Change the inspection stock of material XXXXXX in QM only) appears for all those material while doing confirmation in CO11N . Hence system does not allow to complete confirmation for those material where QM is active.
    Please suggest if i am using the correct Exit or any further improvement is required.
    Thanks and regards
    D Mohanty

    Hi
    Actually the issue is resolved now.The problem was with coding where we were using Table-AFRU for reading prod order details.But AFRU does not consider fresh orders for which it was replaced with AFKO.
    Also the Z table must be maintained as Plant-Material-Work center combination prior to go for any order confirmation.
    Thank you all who have gone through the post , hope this will help those who have to map the same scenario at their end.
    Regards
    D Mohanty

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

  • Scenarios for "manual creation of inspection lot"

    Hi QM gurus!!
       I would just like to ask the main function of QA01 or "<b>Manual creation of inspection lot</b>"
    What are the cases/scenarios where this tcode is used? I would really appreciate if you could help me.. Thank you.
    Regards,
    Heinrick Palad

    HI,
    The table below provides a brief overview of the functions you can use to process inspection lots. Appropriate cross references are included for the more extensive tasks or for those for which additional information is available.
    Prerequisites
    The inspection lot processing functions can be linked to various authorizations that are checked by the system whenever you try to process an inspection lot. The following types authorizations are relevant to inspection lot processing:
    Material authorizations
    The material authorization for QM is stored in the material master. For more information, see  Creating and Changing QM-Specific Data for a Material.
    Inspection type authorizations
    This authorization controls which inspection type the user can access in order to create an inspection lot. The inspection type authorization is plant-specific.
    No authorization checks are executed in QM when an inspection lot is created automatically.
    Features
    Function
    Pushbutton / Menu path
    What you should know
    Accessing the initial screen for the inspection lot processing functions
    Logistics ® Quality management ® Quality inspection ® Inspection lot processing ® Inspection lot
    Creating an inspection lot manually
    See Creating an Inspection Lot Manually
    Changing an inspection lot
    Choose Change
    Enter the number of the inspection lot you want to change and then choose Enter.
    Displaying an inspection lot
    Choose Display
    Enter the number of the inspection lot you want to display and then choose Enter.
    Creating a new batch in an inspection lot
    See Batch Creation in Inspection Lots
    Cancelling an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Cancel lot.
    See Cancellation of an Inspection Lot
    Blocking/unblocking an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Block lot.
    To unblock an inspection lot, choose Inspection lot ® Functions ® Unblock lot.
    When you block an inspection lot, you cannot process the lot further. You must unblock the lot if you want to perform any additional operations.
    Transferring stock in an inspection lot
    See Stock Transfers
    Making corrections to inspection lot quantities
    See Corrections to Inspection Lot Quantities
    Creating a QM order
    Call up an inspection lot in the create or change mode and choose Goto ® Insp. lot acc. assgnmt.
    See QM Order Creation
    Resetting the sample calculation
    See Resetting the Sample Calculation
    Printing inspection instruction/sample-drawing instruction
    See Printout of Instructions
    Approving a task list
    Call up an inspection lot in the create or change mode and choose Inspection lot ® Functions ® Give approval
    If the task lists in your company must be approved before they can be used, you should make sure that only approved task lists are assigned to an inspection lot. If the system selects a task list that has not yet been approved, you can use this function to approve the task list (provided you have the necessary material authorization).
    this link help u.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/be/00bbe7ca5311d2961800a0c930e04c/frameset.htm
    reward is usefull.
    tahnks.

  • Automatic creation of inspection Lot upon GR

    Hello all,
    i have a problem with QM module. I want that when QI is active in material master the system automaticcaly create an inspection lot. At the moment when i post the GR the system doesn't create it.
    The GR is posted in a storage location manage by WM, so i have customize also the interface WM-WM.
    Can you help me, please?
    Thanks
    Matteo

    Hi Matteo,
    The settings required for automatic creation of inspection lot are as follows:
    1. Tick the procurement active tick on the material master and assign a QM control key.
    2. Assign inspection type 01 and set this to active.
    3. Create the q-info record for the material, plant and vendor combination.
    4. Set the inspection control to inspection active in the q-info record (no need for the status profile unless you controlling which inspection type to create depending on the specific status).
    5. Also ensure for the PO you receiving that the stock type is set to quality inspection and the QM control key is specified.
    This should create the inspection lot automatically without the need of a status profile.
    Regards,
    Roderick

  • BAPI for Creation of inspection lot

    I have two scenario:-
    1.Can any body help to find BAPI for creation of Inspection lot for the material under PO envisaged for PDI.
    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    My objective is to creation inspection lot without assigning Inspection type of Z01SI01 or Z01SI02 and so on in the material code under a respective Plant 1004 or 1005 0r 1006 so on.
    In my Z Development for creation of inspection lot BDC is run for QA01 as this code created inspection lot on when material code has inspection type Z01SI01 i.e. location of source inspection and vendr code particular classification under 010 vendor class inspection type Z01SI01. System search both the inspection type for both material and vendor then create inspection lot in QALS table by assiging inspection matching inspection on the lot.
    I want to get rid of assignment of inspection on the materilal. If any BAPI or FM is avalable for creation of inspection without assigning inspection type on material code. I want to create inspection lot in which Inpsection type assignment can be done based on vendor class only.
    YPB

    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    I am very sure that this is not possible.You can not create inspection lot without inspection lot origin or inspection type.
    Regards
    Sujit

  • Creation of Inspection Lot in QM Module without inspection lot origin

    I want a solution regarding creation of inspection lot without assigning inspection lot origin to material code.
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order. In my view we do not require assigning inspection lot origin on the material code as process has been mapped through Qinfo record. By assigning the inspection lot origin on the material is unnecessary step in our process.
    Can any body suggest solution regarding above problem.
    Yatindra Bahuguna

    Dear,
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order.
    Little bit stuck up.... can you explain the above in detail...
    As I understood you developed a function -
                         - Which creates material inspection lot
                                             - Which Pre Delivery Inspection applicable on particular purchase order.
    YES?
    Regards,
    Syed Hussain.

  • Stop Automatic Creation of Inspection Lot for a condition

    Dear Gurus,
    While Creating a Delivery through a Sales Order, Config is maintained such that "Inspection Lot" will be automatically Generated.
    Now Business wants to Stop this Automatic Creation of Inspection Lot only for a Particular Delivery Type and for a particular mode of Transport.
    Do we have any User Exits / BADIs to achieve this requirement.
    Please let us know.
    Thanks in advance.
    Regards,
    Vinay Mutt

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • What is the IDOC for Inspection Lot Edit

    Hi All,
       What is the IDOC for Inspection Lot Edit and Cancellation in QM module?
    Thx&regards,
    Khaja.

    Check these..
    in TCode: we30
    ->INSPECTIONPLAN_CREATE01
    ->MATQM01
    ->QPMK01
    Regards,
    Ramesh.

  • What is the BAPI for Inspection lot change - QA02??

    Hi Guys,
    Can anyone tell me plese, What is the BAPI for Inspection lot change - QA02?
    Thanks

    Hello,
    This BAPI suppose to be able to do that for you:
    BAPI_INSPLOT_SETUSAGEDECISION
    Best regards,
    Marcin

  • Notificaton after creation of inspection lot

    Hi,
    We are creating one inspection lot from PM order after releasing the order. Is it possible to create one notification by the system once inspection lot is created. This notification should be created by the system after inspection lot is created. This should not be through result recording. Please help.
    BR
    Manoj

    Hi Manoj,
    Notification cannot be activated automatically. You need to record defects only then you can use the notification component of QM.  You need to record the defects at Inspection lot level or operation or chearacteristic level and against that defect activate the notification. You can activate the notification for critical defect class. For this you need to check the IMG. So, these are the options available to you. There is no need to go to results recording screen. You can do it through QF11 - defects recording or QA32. Else you need to create manually through QM01, as our friend said.
    Reward if cleared and close the thread.
    Keerthi.

  • Control on creation of inspection lot during goods receipt against process

    Dear Friends,
    When goods receipt against process order  of say quantity 100 Kg is done in PP, inspection lot for the same of origin 04 is created in QM.
    My requirement is that PP should be able to post 90 Kg in quality inspection and remaining 10 Kg should directly go to
    reserve sample without coming in Quality.
    Is it possible?
    I have tried by changing material master record in MM02 for inspection set up data. But it is not serving the purpose.
    Thanks in advance,
    Regards
    Vrish

    Hi,
    04 type of inspection is GR at the time of Production Order.
    Whenever you do the production order quantity, an inspection lot is created. It will be created for full quantity which you are confirming (i.e. 100 kg will be considered and not 90 kg).
    This material will be Quality Inspection.
    You have to do Result recording and give usage decision.
    While giving usage decision, you can allot 90 kgs to Unrestricted and 10 kgs can go as Sample what you desire.
    Hope this will solve your issue.
    Srini

  • Avoiding creation of inspection lot for certain vendors.

    Hi,
    There is one requirement from my client side , that Inspection lot should not be created for certain vendors ( Issuing plant also consider as vendor here).
    The correct requirement is if it is transfered from other plants it should not create the lot and on the other vendors it should create.
    We have a have a option through maintaining the QM info record but it was not maintained earlier and newly creation is too difficult.
    I remember there is some exit is available to overcome this. Any one having the earlier experince on this...Provide the exit and FM name... High priority one.
    Regards
    Pragash

    Dear Pragash
    1) You can maintain Quality info Record in enmass using QI06. Only maintain for the vendor you need to skip.
    2) This exit can help you in controling the inspection lot
    QAAT0002 Control of acceptance lots/goods receipt  
    QBCK0003 Extended QM check for goods receipt                                         
    Regards
    Gajesh

  • Regarding creation of inspection lot origin-03

    Dear all,
                  The standard  behaviour of inspection type 03 is When production order is released inspection lot is created.Client requirement is when particular operation is confirmed only inspection lot to be generated.Is it possible?
    For example in routing there are 7 operations and in the sixth operation is Quality audit opeation
    inspection  lot is created when production order is released,  lot is generated but the requirement is when fifth operation is confirmed only lot to be generated.
    with regards
    kumar

    Hi Senthil Kumar,
    AS per best of my information concern your issue can't get resolved with inspection type 03. But yest at time of confirming the Fifth operation you can get the 04 inspection lot triggered by calling the auto GR at this operation confirm by setting the control key at these operation. and these 04 lot can be triggered more than one time for an order.
    Regards,
    Shyamal

Maybe you are looking for

  • Getting errors when creating Web Services Data Control in Jdev 11.1.2.4.0

    Hi I am on Jdev 11.1.2.4.0 Build JDEVADF_11.1.2.4.0_GENERIC_130421.1600.6436.1 When I am trying to create Web Services Data Control for SOAP, it gives 'Invalid WSDL File' for any WSDL file and shows following error: oracle/adfdtinternal/model/adapter

  • Project iMac Screen to Apple TV?

    Does the old Apple TV have the ability to receive screen projections or streaming from my iMac to then be seen on my TV?

  • Front Row is Stuck

    My Front Row is stuck on one picture from iPhoto and all I can do is press F9 or F10 to see particular applications, and from there us Front Row to launch iTunes, but that is it. I cannot stop iPhoto and I cannot force quit Front Row. I could force q

  • To restrict FBL3N display

    Hi All, Please can anyone tell or have idea, how we can restrict the display of FBL3N at profit centre level. Thanks, Gill. Edited by: Sweety Gill on Apr 7, 2009 11:51 AM

  • How can I modify this code to display an image in an applet?

    Sorry, I'm almost positive this is absolutely incorrect, but here is what I have so far: import java.awt.*; import java.awt.event.*; import java.awt.image.*; import java.io.*; import javax.imageio.*; import javax.swing.*; public class Blackberry exte