Control Recipe and PI sheet

Hi, All,
Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
Thanks

Hi,
Master recipe will contain the Resources to be used and the duration of the process.
Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
PI Sheet:
process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
Regards,
Mohan

Similar Messages

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • Control Recipe and PI sheet assignment in Master Recipe

    Hi,
      Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
    Also explain hoe to generate PI sheet automatically. brief me in Step by step.
    Regards,
    Muthamil

    Closed

  • Control recipes for PI sheet and external system

    Dear All,
    I need to create control recipe for PI sheet and for external system also. Can I use the characteristic based process instructions? Since I can assign only one control recipe destination for a phase, can i generate the data of a particular phase in both the control recipes.
    Thanks in advance
    Regards
    Prathib

    Thanks Brahmankar,
    But i dont understand what to enter in  input parameters for EAD_TEXT.
    Could you plz help me out.
    Best Regards,
    Parag Save.

  • Control receipe and PI sheet

    Dear Experts
                                Can u guide me what is purpose of creating control receipe and PI sheet in system.
    also plz tell me step by step config and creation of both with T code.

    Dear,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created.
    PI Sheet: Process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe. PI Sheets in PP-PI offer a lot of functionality to streamline a manufacturing process
    For details steps please refer this link,
    [Step in PP-PI|Re: PI sheet & Controll recipe]
    Regards,
    R.Brahmankar

  • Control recipe and process messages

    Hi experts,
    When I create a control recipe and send to an external destination, is it going as an outbound IDoc from SAP to external system?.
    I have the same doubt about the process messages also. ie whether the process messages are coming from external system to SAP as inbound IDocs?
    Thanks in advance
    pradeep

    Hi Prathib,
    To realize data transfer between PP-PI and the control system, the SAP system provides the following alternative technologies:
    ·        Function modules
    ·        BAPIs (Business Application Programming Interfaces) that are defined as methods applied to SAP business objects and enable the standardized, object-oriented access to business functions in the SAP system. They are implemented as function modules, too.
    Follow the link below for further detail
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/12/3bc6f8504811d182c20000e829fbfe/frameset.htm
    Do let us knowi if you have any further query on the same
    Thanks
    Kaushik

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Advantages of PI sheet and control recipe

    can u pls let me know the advantages of using Process instruction sheet and control recipe,
    and if it is not maintained , then what will be the reflection.
    thnx-rgds
    Amitabh

    Hi,
    Control recipe is used to send a proper destination or to the operator who has to input the data and confirm this action performed.
    control recipe will be sent back to the process order and instructions with data will be available. when creating a process order, control recipe will be created, which will contain the process instruction.
    To specify the PI that are to be generated in the processorder when control recipe is created  for the control recipe destination.
    There are 3 steps to be performed such as
    1) Define control recipe destinations
    2) Assign PI Categories
    3) Set process instructions to be gerated automatically
    Please let me know.
    Regards,
    Mohan R

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • Control Recipe Status

    Hi Everyone...
    Need your help urgently.
    When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
    Thank you,Regards

    You can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
    Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
    When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
    When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
    Hope this may help you.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Process Message and PI sheet

    Dear All,
    I have created one finished product and one raw material. In Master Recipe i created one Phase and assign two instruction category CONS_1 and PROD_1.
    Now i generated PI sheet in COR2 and see CO53 that it is present and now i send it and in CO60 it is there.
    Now when i see and enter quantity in PIsheet and double click on it to see the Process Message
    1) PI_PROD has material number of finished product - It is ok
    2) PI_CONS has also material number of finished product but it should have raw material number.
    So, my issues are
    1) How raw material will be there in PI_CONS Process Message.
    2) Should i create two phase and assign it one by one or what else.
    3) If i have Process Order of 500 quantity and through PI Sheet i do GR of 10 and GI of 10 then for next time how should i do GI and GR again. Should i send PI Sheet again from CO53 to CO60.
    4) Is there only one control Recipe is generated for one process order.

    Hi,
    process instruction CONS_1 will not show raw material number it will show reservation number of the process order...instead of using CONS_1 use CONS_D and use this control recipe destination and make the settings as shown below...
    your final PI sheet output will be like this....
    Hope this helps...
    Thanks
    Kumar

  • Regarding control recipe destination

    Dear all,
    What is control recipe destination is it the end user or otherwise similarly for a person in shopfloor how does he view Pi sheet and how he will enter details of various parameters in it and how he will close the PI sheet.
    What will happen in CO53 and what do we do in CO54 , please give in detail
    regards
    venkat

    Hi Venkat,
    Control recipe destination is  the process control system or the line operator to whom the process instructions are transferred to be carried out. When processing the order, you can generate one control recipe with the process instructions for all phases, for each control recipe of a process order.
    You then assign the control recipe destination to the phases of the master recipe, by maintaining the process control data in the process instruction overview. This section describes the assignment of a control recipe destination to a phase.
    Please find detailed documentation on the SAP Help URL as below:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm
    Please check and confirm.
    Regards
    Datta

  • Remove status "control recipe created"

    Hi
    I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
    How i can correct this?

    Hi,
    First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
    Control Recipe/PI sheet deletion procedure
    Thanks
    Kumar

Maybe you are looking for

  • Upgrade iMac G3 operating system

    I am setting up my old iMac G3 for my grandaughter. It has OS X 10.3.5. Hardware: Power PC 750, CPU 500 MHz, Memory 192 MB, Bus Speed 100 MHz, SDRAM Memory DIMM0/J13 64 MB DRAM & DIMM1/J14 128MB. 20GB hard disk, 14.8 available. I want to upgrade the

  • XML file to Internal table through XSLT - Call Transformation

    Hi Friends, I am trying to work a scenario where i have a simple XML file and i need to convert the data in to an internal table. When i execute the XSLT seperately, it works fine. I get the output, but when it is invoked through a ABAP program, i am

  • IPod Audio too soft when hooked up to car???

    iPod touch audio is soft when I hook it up to my car audio jack.  I have to turn up the car volume almost to max! I have checked the volume level settings on the iPod...no change?

  • Does Apple make a vehicle charger for MacBook Pro ?

    Does Apple make a vehicle charger for MacBook Pro ?

  • Frequent index synchronization for table with a lot of data

    Hello! I have a table with text column to be indexed. There are a lot of records in the table and the texts in the text column are ofter big enough. The number of records are rising frequently and i need actual search results in any time, so i cant s