Hi experts,
When I create a control recipe and send to an external destination, is it going as an outbound IDoc from SAP to external system?.
I have the same doubt about the process messages also. ie whether the process messages are coming from external system to SAP as inbound IDocs?
Thanks in advance
pradeep

Hi Prathib,
To realize data transfer between PP-PI and the control system, the SAP system provides the following alternative technologies:
·        Function modules
·        BAPIs (Business Application Programming Interfaces) that are defined as methods applied to SAP business objects and enable the standardized, object-oriented access to business functions in the SAP system. They are implemented as function modules, too.
Follow the link below for further detail
http://help.sap.com/saphelp_erp60_sp/helpdata/en/12/3bc6f8504811d182c20000e829fbfe/frameset.htm
Do let us knowi if you have any further query on the same
Thanks
Kaushik

Similar Messages

  • Difference betwn Process insturction and Process Message...

    Dear all,
    What is meant by Process Instruction category and Process Message category. what is the difference between this two and it is applicable in PI sheet.
    What is control recipe destination.
    pls explain this question clearly
    regards,
    s.sakthivel

    Hi,
    You can go through below links for better understanding...
    http://help.sap.com/saphelp_45B/helpdata/en/d5/e264b20437d1118b3f0060b03ca329/frameset.htm
    Process flow in Process industry
    Process Instruction Category
    Process Message Category
    Regards
    Edited by: Julfikar Ali on Aug 21, 2009 11:06 AM

  • Control Recipe and PI sheet assignment in Master Recipe

    Hi,
      Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
    Also explain hoe to generate PI sheet automatically. brief me in Step by step.
    Regards,
    Muthamil

    Closed

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • Control Recipe and PI sheet

    Hi, All,
    Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
    I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
    Thanks

    Hi,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
    PI Sheet:
    process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
    Regards,
    Mohan

  • Process instruction characteristics and process messages

    Hi,
    Can anyone tell me why process instruction characteristics is required when only process message characteristics are displayed in PI sheets (input or output).
    Regards
    Joe

    Hi,
    Answer is already there in your question.
    and that is
    (input or output)
    Now you creates the one Process Message characteristic let's it is Temperature.But how it's value comes in the PI Sheet (As Ouput or Input manually by user) that is decided by that Process Instruction Characteristic.
    Now when you creates the Process Instruction Category (O12C) except type 0 you have choice of creates it by using help of Process Assistant.This Assistant assigns the Process Instruction Characteristic to the process Massage Characteristic automatically when you select the specific radio button or Activate the check box during that PI category creation.
    For Example when you creates the PI category Type 2 using Assistant.Here after naming first screen comes to you is to define type of Process data Request.Here when you select the radio Button for Simple process data request then indirectly you assign the process Instruction characteristic PPPI_DATA_REQUEST_TYPE and its Value comes as Simple.
    But when you create the PI category type 0 you have to assign this PI Characteristic manually because its Universal Category and there is no assistant which helps you.
    Regards,
    Dhaval

  • B2B using JMS and Processing Messages with Message Driven Beans

    We want to be able to use B2B to send messages to a JMS queue and then process messages from B2B using a Message Driven Bean. Is this supported.
    We are using B2B 10.2.0.2 with Patchset 4.

    Hello,
    In 10.1.2.0.2 B2B , as part of the internal Delivery channel B2B can only send and receive messages from JMS queues.
    Rgds,Ramesh

  • Enabling Xsteps in master recipe and process order

    Hi experts,
    I am trying to enable the Xsteps by assigning 'Xsteps' in Master recipe profile. But Xsteps tab is not getting enabled in master recipe. I think this is the only one setting to activate Xstep. Can anybody help me on this.? IS this a technical issue(Something related to basis?)
    Similarly I dont see the Xsteps tab in process order also. Is the SAP version a reason for this. I think Xsteps functionality are available from 4.7 onwards.
    Can anybody help me on this please?
    Thanks in advance.

    Dear experts,
    I encounter the same problem of Prathib. I'm working on ECC 6.0 and would like to use Xsteps. The repository is available (R/3 Enterprise SCM Extension 2.0 is imported) and I created several xsteps but i cannot imprt them in the master recipe because the button "Xsteps" is not active in C202, even the recipe profile is correctly set to PI01_XS.
    All SAP notes i found (01466 and 607815) are referring to 4.7 and are correctly implemented in my system. So the customizing and extensions are in place, but the button "Xsteps" is not active.
    Can anybody help and suggest further settings i need to do in order to use xsteps?
    Thanks & Regards.

  • Find threshold level of receiving and processing messages in PO

    Hello all SAP PI Experts,
    A few days ago, our PI system crashed as a result of receiving too many messages. So, they had to do stop PI to perform some correction operations and now everything is working fine. Luckily this problem was detected in Quality system before they could transport everything to Production system.
    My team is now asking me to check the threshold limit of our PI system so that they can make sure that they never send messages more than the threshold limit again. Could anyone please suggest how to check this ?
    Our system is based on PI 7.4 single stack.
    Thanks,
    Ajeya G V

    Hello Ajeya,
    in principle, PI should be able to handle any number of messages. It would put them into queues and work on them as the system power permits. If the system crashed, you need to analyze what exactly was the cause for the crash. Some possibilities:
    - Was it too many synchronous messages leading to connection timeouts etc.?
    - Was the hardware at its limits, i.e. out of disk space, out of memory?
    - Was it an application problem, inefficient coding, for example many RFC calls to the backend, costly loops in mappings?
    There could be many more. If you know the reason, check whether the same problem applies in production and fix it.
    There is no way to give you an absolute threshold value, you will only be able to extrapolate past values and performance and give a good guess. The best way to do this is having a properly sized QA system (close to P) and run performance tests.
    Regards,
    Jörg

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

  • Advantages of PI sheet and control recipe

    can u pls let me know the advantages of using Process instruction sheet and control recipe,
    and if it is not maintained , then what will be the reflection.
    thnx-rgds
    Amitabh

    Hi,
    Control recipe is used to send a proper destination or to the operator who has to input the data and confirm this action performed.
    control recipe will be sent back to the process order and instructions with data will be available. when creating a process order, control recipe will be created, which will contain the process instruction.
    To specify the PI that are to be generated in the processorder when control recipe is created  for the control recipe destination.
    There are 3 steps to be performed such as
    1) Define control recipe destinations
    2) Assign PI Categories
    3) Set process instructions to be gerated automatically
    Please let me know.
    Regards,
    Mohan R

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Remove status "control recipe created"

    Hi
    I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
    How i can correct this?

    Hi,
    First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
    Control Recipe/PI sheet deletion procedure
    Thanks
    Kumar

  • TO not printing in background processing of process message

    Dear Experts,
    We are using PI sheets and process messages to do GR (WM) and then put away to a destination storage bin. TO is getting printed in the default user profile printer when user is manually sending  process message in CO54. But not getting printed when processed by a background job(RCOCB004). We tried even after maintaining the printer in background user but of no use. It only generates the spool and no direct print happening. Kindly let me know if this is the std SAP behavior and any way to control this.
    Thanks
    Rijil

    hi, thanks you reply.
    default delete job is ok.
    but
    default archive job does not work.
    the followding error occured in log.
    Executing ArchiveJob (arvhive job) failed. Reason: java.lang.NullPointerException