Control recipe cretaion if the process inst categories assigned in Order

Hi, As i understand you can assign the process instruction category either in o10c or in process order- opertion - phase, it self. my doubt is if it is assigned in phase of the order, there is no fileds like general scope, filter etc which is there in o10c. in case if we assign the proc inst cat in order, how system creats the control recipe without those fields? please advise.

Hi All, i think my question is not clear. my question is in o10c we have fields like general scope. if you enter here cons_1 (consumpltion), against this we need to enter general scope as "for all reservations", then only in pi sheet it will display cells to enter the values for all components. if we enter cons_1 in recipe, i could not find this general scope field where i need to specify that this process inst category is for all items in reservation. i hope this explanation will clear my doubt.
Thanks.

Similar Messages

  • Control Recipie Status in a process order

    Dear PP Gurus
    How can i clear Control Recipie Status in a process order, without that TECHO is not allowing....can u pls suggest..??
    Regards
    Ragesh

    Ragesh,
    It looks like you are trying to TECO the order without processing the control recipe. If my memory goes it is the status "CRCR" which would prevent this.
    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    Hope this would resolve the problem....Reward full points and close the thread,
    Regards,
    Prasobh

  • What is the  Process of  Back to Back Order ?

    Hi,
    I want to know the Whole Process of  Back to Back Order of an Item !
    And plz reply my Question .......................? Sir

    Back Order of an Item  means :-
    Suppose you have a order and delivery date is 01/08/2011 for 10 quantity .
    now you have dispached only 5 quantity on same sales order.
    now run to back order report in next day(02/08/2011) it will show that 5 qty is in back order report.
    Thanks
    Manvendra Singh Niranjan

  • What is the process of closing a notification / order

    We are in the process of testing MAM 3.0 SR1 for a maintenance system; we do not see on the notification header and order header flag to close either notification or order.Is this not a standard function in MAM. 
    Thanks for your help

    Thanks Gisk,
    I created a user status on notification header called COMP and we used a BAPI in R3 to set the completion status on the notifications that have a user status COMP from the device.
    How about the order? we are having the issue of completing notifications that are assigned to orders. On the documentation, it says that at closing the order all assigned notif will be  closed in R3 automatically. This is not happening for order/notif from MAM.. Any thought?
    Thanks again

  • The process flow of Make-to-order

    Hi friends,
    Now I am learning SAP softwear.
    Can u please tell me the flow of MAKE-TO-ORDER In Product costing. And also let me know how many types in producting costing.
    yours faithfully,
    Mr.Rao

    Hi,
    Welcome to SDN.
    Please go through following sap link.
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/dd/5600b1545a11d1a7020000e829fd11/content.htm
    Regards,

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Regarding control recipe destination

    Dear all,
    What is control recipe destination is it the end user or otherwise similarly for a person in shopfloor how does he view Pi sheet and how he will enter details of various parameters in it and how he will close the PI sheet.
    What will happen in CO53 and what do we do in CO54 , please give in detail
    regards
    venkat

    Hi Venkat,
    Control recipe destination is  the process control system or the line operator to whom the process instructions are transferred to be carried out. When processing the order, you can generate one control recipe with the process instructions for all phases, for each control recipe of a process order.
    You then assign the control recipe destination to the phases of the master recipe, by maintaining the process control data in the process instruction overview. This section describes the assignment of a control recipe destination to a phase.
    Please find detailed documentation on the SAP Help URL as below:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm
    Please check and confirm.
    Regards
    Datta

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • Function modules used in process message categories

    Hi Gurus,
    in process message characteristics, we need to assign the function modules. please advise is there any place (sap system or any website) where we can find all the function modules which are used in pi sheets? i want to know function modules and their uses or how to use them in pi sheets? if i want to develop new function modules, what should be the criteria, please guide me. thank you for the support.

    Hello
    In addition, on transaction O13C you will find the process message categories and which message destination is assigned to each category.
    Here is the documentation of the message categories:
    Predefined Process Message Categories - PP - PI-PCS Interface: Linking of Process Control Systems - SAP Library
    BR
    Caetano

  • Control Recipe and PI sheet

    Hi, All,
    Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
    I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
    Thanks

    Hi,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
    PI Sheet:
    process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
    Regards,
    Mohan

  • Two issues, firefox crashes and does not close the process

    I am a web developer, so I am contently messing about with websites,
    I start firefox and open up wordpress for example and also have filezilla open and notepad++ on my computer as well as firefox all at the same time.
    I edit something and refresh firefox, it hangs, but it does not stop hanging so I have to restart firefox, but the process is still running so I have to stop the process from task manager in order to restart firefox again.
    This should not happen, not only does it happen regularly but it happens after refreshing pages after an edit
    of course I have tried switching off plugins and even my internet security but its still doing it. I have taken to using opera instead of firefox when developing websites but I much prefer firefox layout..
    I need all these programs open by the way in order to achieve my work.
    any ideas ?.. thanks

    I am a web developer, so I am contently messing about with websites,
    I start firefox and open up wordpress for example and also have filezilla open and notepad++ on my computer as well as firefox all at the same time.
    I edit something and refresh firefox, it hangs, but it does not stop hanging so I have to restart firefox, but the process is still running so I have to stop the process from task manager in order to restart firefox again.
    This should not happen, not only does it happen regularly but it happens after refreshing pages after an edit
    of course I have tried switching off plugins and even my internet security but its still doing it. I have taken to using opera instead of firefox when developing websites but I much prefer firefox layout..
    I need all these programs open by the way in order to achieve my work.
    any ideas ?.. thanks

  • Process Code for Outbound Production Order??

    Does anybody know the Process Code for Outbound Production Order??
    BASIC Type : LOIPRO01
    Message Type : LOIPRO
    Regards,
    Ravi

    Hi Everybody.
    There's no standard process code for LOIPRO Outbound Idocs.
    This Idocs are threated as master data info, and could only be automatically generated by Data Distribution Model.
    BD64.
    Anyway, you can define your own Outbound Process Code in WE41 using CLOI_MASTERIDOC_CREATE_LOIPRO FM.
    You can choose.
    Regards.
    Albert.

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control recipe and process messages

    Hi experts,
    When I create a control recipe and send to an external destination, is it going as an outbound IDoc from SAP to external system?.
    I have the same doubt about the process messages also. ie whether the process messages are coming from external system to SAP as inbound IDocs?
    Thanks in advance
    pradeep

    Hi Prathib,
    To realize data transfer between PP-PI and the control system, the SAP system provides the following alternative technologies:
    ·        Function modules
    ·        BAPIs (Business Application Programming Interfaces) that are defined as methods applied to SAP business objects and enable the standardized, object-oriented access to business functions in the SAP system. They are implemented as function modules, too.
    Follow the link below for further detail
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/12/3bc6f8504811d182c20000e829fbfe/frameset.htm
    Do let us knowi if you have any further query on the same
    Thanks
    Kaushik

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

Maybe you are looking for

  • Setting up Wiki Calendars in iCal with Active Directory Accounts

    I'm Having a little trouble wrapping my head around our Wiki Calendar Solution, Id like to find a way to get the 10.6 Wiki Server Calendar's in iCal Client - using our active directory authentication. I have a test 10.6 Server bound to our Active Dir

  • Optical drive is not visible

             My optical drive stopped working. It will not show up under my computer. I checked to see if any drivers were installed and the optical drive was missing from the hardware list. When I try to add new hardware, my drive is not detected. I eve

  • Silly Questions - Upload Speed & Hardware

    Hi tere network people, Networking ignorant here in need of your help. I'm using a PowerMac G4 as a server and I have a PHP website going to share some pics with friends. Some lamented it can be slow to download the pictures on their side (Most, if n

  • How to change engine's name in Oracle BPM 10.3.2?

    I want to change the engine's name in Oracle BPM 10.3.2 Standalone. I don't see how to do it inside the Process Administrator. Is it possible to change an engine's name? Thanks.

  • Flash button problem! please help!

    hello- I haven't used flash to create a website for a while and I am feeling really lost. I have looked through countless forums and such and tried all sorts of things but nothing seems to be working. Basically- I have a set of 6 soon to be buttons a