Control recipe generation from process order

Hi,
Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton,  a new control recipe is getting generated,
I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
Can anybody know how to bring this control?
Thnaks in advance
Regards
Prathib

Hi
If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
SDG

Similar Messages

  • How to control Inspeciton generation from Process/ Production Order

    Hi SAP Gurus,
    In our business place earlier we used to have Process order.The specific Process order type wouldn't generate any Lot.But once we switch to production order , we are getting inspection lot for New Production Order type.
    The need is that for specific production order (which is not for main production), the system shouldn't generate 03, 04 type of inspection lot with many real process / production inspection tests.
    For this purpose we  tried to limit the inspection type for Production order using Order type dependent parameter.
    In that we assign new inspection type (other than 03 or 04 inspection types ). The new inspection type is attached with new Usage.And New usage has got its own Group counter with limited test.
    So Group counter created with new usage. New usage used in new inspection type. And new inspection type tied with production order. With this we were able to limit for not having inspection lot of 03 inspection type for this production order.
    But system generate the 04 type of inspection lot , though production order has got new inspection type attached with it.
    Also the new setup 04 type of inspection lots in created mode.
    How to make sure that system only generate the new inspection type inspection lots.
    Advance Thanks for all the detail help steps.

    Hi
    If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
    SDG

  • Partial reversal of a goods receipt from process order

    Dear All
    Could anyone please help me with explaining how to do a partial reversal of a goods receipt from process order? If Iu2019m using trans CORS I have to cancel the entire operation, which I donu2019t want to do. If Iu2019m using MIGO and MT 102 I only reverse the goods receipts of the produced material, the corresponding components from the BoM is not reversed with MT 262 as they are if I cancel with CORS, and I donu2019t want to do a second MIGO transaction in which I cancel the components with MT 261. I have also tried to create an operation with a negative quantity, but without any success.
    Itu2019s not an option for the business to reverse the entire quantity and then perform a new goods receipt with the right quantity.

    Hi again,
    I have been trying to do the reversal with CORR but Iu2019m getting the error message u201CMixed confirmation types (time ticket/time event) are not allowedu201D, message number RU179.
    Anyone who can help me on the way?
    /WM consultant on unknown territory

  • Automatic Transfer Order for GR from External vendor and from Process Order

    Hi Expert
    We need to implement the logic for automatic transfer order,
    the Idea when we Receive the Goods from Vendor and while posting goods via Migo we want that the system create automatically the TO.
    the same approach to be implemented for GR from Process Order we need that the system create TO directly to the right Bin
    Your support is higly recommanded
    Olfa

    Many thanks for your support
    I made what you illustrated in your previous message for the Mvt type 501:
    There is a pop up screen which displayed asking me to create TO for Material Document
    Please find attached the related screens
    And please note that the Material Master was updated accordingly
    Please note
    Please correct me if I made a wrong step
    Regards

  • Total Quantity generated from Process Order

    Dear Experts,
        Can you help me on how to find the total quantity generated from process order.
    Example: I want to see for a particular material what is the total quantity converted in COR6N for a particular period.
    Thanks

    Got the report from COOISPI items list. Thanks

  • Goods receipt from Process order

    Dear experts,
    when you made GR from process order it doesn't appear in the report KKBC_ord or any report related to the comparison between actual and target for Orders I don't know the reason so because of that there is not target costs in the report So please I need your advice for this issue.
    thanks
    Nassar

    Hi
    Kindly check that a valid standard cost is available in the material master.
    Real target cost comes when you do the variance calculation so you need to do that.
    Regards
    Rajneesh Saxena

  • Control receipe creation in process order

    Hi,
    Can you please tell me how to create control receipe.
    After releasing the process order when I select the button for creating  control receipe. System shows error as " No control receipe generated"
    Please tell me the basic steps required to create control receipe and PI sheet.
    Regards
    Karthikeyan

    Hi,
    Check In master Recipe ,in the PI Tab,There must be some PI category is assigned and in that PI Category,this PI Charactiristic has been assigned.
    First goto that Phase of the Master Recipe and then goto PI tab and then find the PI category.
    In Process order
    Goto->List->Control Recipe List--->
    As per above link first find out Control Recipe is generated or not and also find out its status.
    If Status is Created then you can find it in CO53,
    if status is Sent then you can find it in CO55 or CO60
    Please rfer this thread also,
    https://forums.sdn.sap.com/click.jspa?searchID=16154042&messageID=5839678
    Regards,
    R.Brahmankar

  • Generate External Service PR from Process order

    Hi,
    i want to generate a PR for external service on an operation fro the process order and then make a service entry sheet against it, is this possible in SAP? I set the control key accordingly, a PR is generated but it is not for external service, it is working well for subcontracting. It is possible to generate PR for external service manually but i want to automate the process.
    Thanks

    Hi Muhammad Naveed,
    In PP cycle we do not use the concept of taking external services. External services is hiring a vendor to come to your plant and do the servicing for your equipment. This is followed in plant maintenance module.
    In PP cycle, we only send the material outside to vendor for doing a certain operation using PR - PO (subcontracting scenario).
    Hope you are clear.
    Regards,
    Naren

  • Manufacturing date entry control in MIGO for process order GR

    hi
    when i make process order GRN output entry ,i enter the manufacturing date for the batch.But it is now allowing me to enter,future date as well as any past date even before the RM issue date.please let me know wheter any control can be given so that while enterin manufacturing date , system should not allow a dae earlier than , RMissue date or Operation start date and any date future than the material recipt GR date for the output.The best practice is the manufacturing date is the date on which the first operation of the batch starts.
    unnikrishnan

    please write the user exit for the same

  • Apportionment Structure -In Control Data Tab of Process Order

    Dear Gurus
    How we can enable Apportionment Structure in Control Tab of Process order. In the drop down menu list i can see the Material / Plant / Appont str in the field of Apportionment Struct ( But it is disabled ) .
    Thanks & Regards
    Anupama

    Hi
    If you have co product then it will get enabled.
    Thanks
    S.Murali

  • Batch number determination from process order

    Dear Gurus,
    I need when I'm receiving on a process order, the batch number is copied from the batch of the process order.
    Regards,
    MaX

    Yes, it is possible depending on the setting of your order type (IMG -> Production Planning for Process Industries -> Process order -> Master data -> Order -> Define Order Type-Dependent Parameters)
    If here, in the combination plant - order type, there is the setting in Process data documentation area on "Batch record required", then batch can not be changed in process order after the release.
    If the setting is in one of the other two options, then you can change the batch after release.
    Bye

  • Change the resource from process order

    Hi All,
    I have 60 to 70 process order i want to change the resource of operation 0010 for all the process orders. Is there any transaction i can do the  change of resorce from all process order?
    satish kapartiwar
    Edited by: satish kapartiwar on Jun 20, 2008 11:39 AM

    Hy Satish,
    As Mr. Prashobh has said there is only two ways two do the same.
    One is change by BDC or LSMW and
    Second is by capacity leveling.
    One more option is don't change the Resorce in Process orders , but during the Phase Confirmation by Current Confirm Resource.
    Regards,
    Dhaval
    Edited by: Dhaval on Jun 21, 2008 11:43 AM

  • Goods receipt from process Order, different plants same warehouse

    Hi All,
    Would really apreciate guidence on my issue below.
    We plane to implement the following Org Structure:
    Plant A                 Plant B
        Warehouse 0001
    warehouse 001 shared by both plants
    I execute a process order in plant A, when I perform Goods Receipt against the process order will it show under Plant A or both Plants A & B.
    Plant A executes for Plant B as Plant B is new and all master data is set up in Plant A.
    My hope is to get the business to execute Plant B process orders in Plant B but this will require huge effort I think as masetr data will need changing etc.
    Thanks
    Stuart

    Hi,
    If you post GR in Plant - A, then the stocks in the warehouse will reflect for Plant - A & not in Plant - B.
    Although the warehouse is the same, it is linked to the combination of Plant & Storage location. You can check the warehouse stocks using LS26, just specify the warehouse number & material number.
    But there is also a concept of planning plant & production plant, so Plant A can be where the planning takes place, while Plant B is where the actual production takes place. In this case, although you produce in Plant B, the GR will be done in Plant A.
    Hope the above clarifies.
    Regards,
    Vivek

  • COOISPI: No display of operations/phases from process orders

    hi All,
    I'm using EHP$4and having this problem The List "Operations/Phases" does not show any output in the process order information system (Transaction COOISPI).,however i used to work on EHP3 and did'nt face this problem
    please advice
    Regards,
    Ahmed Sobhi

    Hi Ahmed,
    I think the SAP correction note 1460244 will solve your problem.
    Best regards,
    Marcelo

  • HU process for GR from Process order

    Dear Experts,
    How handle Handling unit in process order GR,
    Scenario: Processed bulk chemicals are packed in 20 KG bags (numbered bags), each bag contains unique number in packing.
    Treaceability is based on the BAG numbers, Quality check for packed FG is carried out, rejections in any one of the bag will be removed and put in bocked stock.
    I am thinking to use HU management.
    please give me the steps to do this .
    Thanks and regards
    vinoth

    Dear
    can u use Class Characteristics by defining those charac wich may cause rejection , by this u can trace as well
    if it suit to your scenario