Control recipe resending to xMII.
Hi!!
Control recipe can be sent to xMII through CO53 transaction.
How can we resend the control recipe to xMII?
Please Guide.
Best Regards,
Ajit Dubal.
Hi Vijaya,
I am able to send the control recipe but need to know how to resend the control recipe.
Rgds,
Ajit
Similar Messages
-
Control recipe resending.
Hi!!
Control recipe can be sent to xMII or other systems through CO53.
How can we resend the control recipe to xMII?
Please Guide.
Best Regards,
Ajit Dubal.Hi Pasobh,
Previously, I have sent the control recipe correctly.
However, due to some reason, i need to resend it to xMII. So, is it possible to resend it?
rgds,
Ajit Dubal. -
Error in CO54 Control recipe.
Dear Experts,
I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
This is very critical as my client plant is nearly down as far as SAP is concerned.
Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
Regards,
Rajesh.Dear,
The error given is as follows.
2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
3.Message is not sent to and destination.
This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
Regards,
Rajesh Prasad. -
XStep- creation of two control recipes
Hi,
I am using the Ecc 6.0 Enp 3.0
I have created a Xtsep structure with parameters and checked. so errors found.
XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
The second control recipe has the all details which are captured from XStep.
Why First control recipe getting created.. am I doing something wroing in setup..
Thanks,
JKWhy don't you just create a custom view object? There's even an example or 2 in the docs:
http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
Edit: you are aware that you can create a View Object based on more than one table?
John -
Control recipe destination not available in Process order
Hi PP-PI Gurus,
When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
When the status of the control recipe is sent to destination(PI02),the system throws the above error.
Any help on how to resolve this error.
Thanks in advance.
ManiHi Dhavel,
Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
Any body working with X-steps in process order ,request your help please to resolve this issue.
Mani. -
Hi Everyone...
Need your help urgently.
When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
Thank you,RegardsYou can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
Hope this may help you. -
Control Recipe and PI sheet assignment in Master Recipe
Hi,
Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
Also explain hoe to generate PI sheet automatically. brief me in Step by step.
Regards,
MuthamilClosed
-
dear experts,
can anyone tell me about control recipe in process industry?
WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-piHi Ganesh,
Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
In addition to the above reply, i would also like to discuss one issue related to Process industries-
while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
Please come with valuable suggestions/advices.
Immediate replies will be appreciated.
Regards
chandra
Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM -
Hi PP Gurus,
I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
Could you please suggest, what are the probable reasons which are leading to this issue?
Thanks,
ReddyHi Pankaj,
Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
I am closing this issue.
Thanks,
Reddy -
Control recipe and PI sheet creation creation
HI frnds,
Please explain me the configuration and path of creating control recipe and PI sheet.
thanks in advance
DanielHI,
plz respond as earliest
Daniel -
How to add new signature in Control Recipe
Hi Friends
I am trying to add new signature/user id in control recipe. But I did not find any option. Can anybody guide me as how to add. Pls send me step by step procedure.
ThanksHi,
The list of cost centers in which the activity type is planned is given in KL02 under planning data. In order to add a new cost center to this, you need to enter the activity type in transaction KP26 for a particular year.
Goto transaction KP26
Give version - 0
from period 1 to 12
year - 2011
cost center - mention the cost center
Activity type - mention activity type
goto overview screen F5 and add the plan price for the activity in the cost center. This step will automatically add new row in the activity type control data.
Hope this helps.
Thanks,
Ram -
Hi, All,
Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
ThanksHi,
Master recipe will contain the Resources to be used and the duration of the process.
Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
PI Sheet:
process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
Regards,
Mohan -
Control recipe and process messages
Hi experts,
When I create a control recipe and send to an external destination, is it going as an outbound IDoc from SAP to external system?.
I have the same doubt about the process messages also. ie whether the process messages are coming from external system to SAP as inbound IDocs?
Thanks in advance
pradeepHi Prathib,
To realize data transfer between PP-PI and the control system, the SAP system provides the following alternative technologies:
· Function modules
· BAPIs (Business Application Programming Interfaces) that are defined as methods applied to SAP business objects and enable the standardized, object-oriented access to business functions in the SAP system. They are implemented as function modules, too.
Follow the link below for further detail
http://help.sap.com/saphelp_erp60_sp/helpdata/en/12/3bc6f8504811d182c20000e829fbfe/frameset.htm
Do let us knowi if you have any further query on the same
Thanks
Kaushik -
Control recipe generation from process order
Hi,
Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton, a new control recipe is getting generated,
I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
Can anybody know how to bring this control?
Thnaks in advance
Regards
PrathibHi
If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
SDG -
Error when sending control recipe to external destination
Hi,
When Iam trying to send control recipe to external destination through CO53, Iam getting the status of the control recipe as 'Sent'. But when I check the tRFC log, I get the status, "connection closed (no data) ".
By selecting the line in the log and executing the LUW I get the message, target system/gate way not active.
In the external system I get the message " Illigal activity"
I checked the RFC connection in SM59 and connection is ok.
The RFC is working from SE37 and the control recipe can be processed without any issues through SE37. The problem is when I try to send from CO53.
Request your expert advice to solve at the earliest.
Thanks in advance
PrathibHi Prathib, Have you got the solution to this problem
Maybe you are looking for
-
HT2534 How can I make a new iTunes account so I can use the computer to download music on my ipad
How can I make a new iTunes account so I can use the computer to download music on my ipad
-
Paging File in windows for SAP
Dear Experts , I am new to SAP R/3 Basis .I am very much in need to set paging file size to 1GBram + 8GB. but i am unable to increase virtual memory beyond 4096 initial and 4096 max. Please any one let me know the step by ste
-
Grdi 10.2.0.4 on Windows 2008 Servers
Hi all, Any mentions to when Oracle will release an update so we can install GRID agents on Windows 2008 servers. As of now, it will not advance past the installation windows. Thanks, JR
-
Hi PCUI Experts, In trial screen, at Item level when the user manually enters a product which is not existing in crm system... i have to trigger the pop screen for searching the products. This pop up is same as what user sees when he presses F4 butto
-
How to bind dynamically created attributes
Hi all, i hv created an appl where all the attributes hv been created dynamically.. wdContext.getNodeInfo().addAttribute("From","ddic:com.sap.dictionary.string"); wdContext.getNodeInfo().addAttribute("To","ddic:com.sap.dictionary.string"); wd