Control Recipe Status

Hi Everyone...
Need your help urgently.
When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
Thank you,Regards

You can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
Hope this may help you.

Similar Messages

  • Control Recipie Status in a process order

    Dear PP Gurus
    How can i clear Control Recipie Status in a process order, without that TECHO is not allowing....can u pls suggest..??
    Regards
    Ragesh

    Ragesh,
    It looks like you are trying to TECO the order without processing the control recipe. If my memory goes it is the status "CRCR" which would prevent this.
    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    Hope this would resolve the problem....Reward full points and close the thread,
    Regards,
    Prasobh

  • Remove status "control recipe created"

    Hi
    I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
    How i can correct this?

    Hi,
    First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
    Control Recipe/PI sheet deletion procedure
    Thanks
    Kumar

  • Error in CO54 Control recipe.

    Dear Experts,
    I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
    I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
    This is very critical as my client plant is nearly down as far as SAP is concerned.
    Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
    Regards,
    Rajesh.

    Dear,
    The error given is as follows.
    2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
    3.Message is not sent to and destination.
    This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
    I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
    Regards,
    Rajesh Prasad.

  • XStep- creation of two control recipes

    Hi,
    I am using the Ecc 6.0 Enp 3.0
    I have created a Xtsep structure with parameters and checked. so errors found.
    XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
    The second control recipe has the all details which are captured from XStep.
    Why First control recipe getting created.. am I doing something wroing in setup..
    Thanks,
    JK

    Why don't you just create a custom view object? There's even an example or 2 in the docs:
    http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
    Edit: you are aware that you can create a View Object based on more than one table?
    John

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Error when sending control recipe to external destination

    Hi,
    When Iam trying to send control recipe to external destination through CO53, Iam getting the status of the control recipe as 'Sent'. But when I check the tRFC log, I get the status, "connection closed (no data) ".
    By selecting the line in the log and executing the LUW I get the message, target system/gate way not active.
    In the external system I get the message " Illigal activity"
    I checked the RFC connection in SM59 and connection is ok.
    The RFC is working from SE37 and the control recipe can be processed without any issues through SE37. The problem is when I try to send from CO53.
    Request your expert advice to solve at the earliest.
    Thanks in advance
    Prathib

    Hi Prathib, Have you got the solution to this problem

  • How to delete Control Recipe

    Hi ,
    Can Control Recipe can be deleted eventhough Incomplete.
    In our scenario sometimes control recipe is auto generate at the time of process order release.So some times due to circumstances order can not proceed further in this case that generated control recipe creates problem to make order TECO or delete.

    Dhaval,
    The standard practice is to manually trigger a Process message to the order, to have the status CRFI - Control recipe finished.
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Use Transaction CO54 to send the Message to the process order.
    Regards,
    Prasobh

  • Control recipe resending.

    Hi!!
    Control recipe can be sent to xMII or other systems through CO53.
    How can we resend the control recipe to xMII?
    Please Guide.
    Best Regards,
    Ajit Dubal.

    Hi Pasobh,
    Previously, I have sent the control recipe correctly.
    However, due to some reason, i need to resend it to xMII. So, is it possible to resend it?
    rgds,
    Ajit Dubal.

  • Control recipe resending to xMII.

    Hi!!
    Control recipe can be sent to xMII through CO53 transaction.
    How can we resend the control recipe to xMII?
    Please Guide.
    Best Regards,
    Ajit Dubal.

    Hi Vijaya,
    I am able to send the control recipe but need to know how to resend the control recipe.
    Rgds,
    Ajit

  • Control Recipe and PI sheet assignment in Master Recipe

    Hi,
      Can anyone guide me in detail about the Assignment of PI sheets in detail and also guide me the generation of Control recipe during Process order release.
    Also explain hoe to generate PI sheet automatically. brief me in Step by step.
    Regards,
    Muthamil

    Closed

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • How to add new signature in Control Recipe

    Hi Friends
    I am trying to add new signature/user id in control recipe. But I did not find any option. Can anybody guide me as how to add. Pls send me step by step procedure.
    Thanks

    Hi,
    The list of cost centers in which the activity type is planned is given in KL02 under planning data.  In order to add a new cost center to this, you need to enter the activity type in transaction KP26 for a particular year. 
    Goto transaction KP26
    Give version - 0
    from period 1 to 12
    year - 2011
    cost center - mention the cost center
    Activity type - mention activity type
    goto overview screen F5 and add the plan price for the activity in the cost center.  This step will automatically add new row in the activity type control data.
    Hope this helps.
    Thanks,
    Ram

Maybe you are looking for

  • IMac crashed & on reboot I get the folder with a question mark

    This happened last night when I went downstairs to put my computer to sleep, it was frozen. On reboot, I would get the chime, but not the apple logo-just the gray screen. Finally, after a minute or two, the folder with a question mark appeared. I tri

  • How can I change permissions on my iPhone photos?

    Whenever I download, or email, photos from my iPhone to my PC, the photos come in rotated. Whenever I try to edit photos taken with my iPhone, even something as simple as rotate or resize, I get errors telling me "You cannot rotate this image. The fi

  • How to Export the material master list using MB51

    Dear All, Please any one help me to export the total materials master list in excel . Regards, Ganesh Patel

  • BSOD Windows 7 after clearing cache of Firefox

    When clearing the cache of Firefox this night I got a BSOD with Windows 7 Prof, causing it to memory-dump followed by a forced reboot. After restoring the backup all worked as intended but I'm hesitant whereas I should try and clear my cache. == This

  • Can someone confirm that this is a bug?

    Hey guys, I recently used the built-in DeNoiser audio plugin for a project I am editing. Almost immediately after applying the effect, Premiere CS5 crashed. Now that I think back, this has happened one other time after the effect was applied. To spea