Controlling the sequence of an iPod slideshow using Elements

I'm trying to control the order in which photos are shown in an iPod slideshow (that I'm displaying on a TV screen)
I've been asking how to do this in some iPod forums, and someone suggested (without many specifics) that I could somehow set it up in Elements and then export it to the iPod.
If you know how to do this or can point me to a post, article, etc that gives an explanation, I would really appreciate it! Otherwise, it's all trial and error.

Doesn't it just show files in filename order?

Similar Messages

  • Control the Batch Size for inseting tables using xi

    Hi Friends,
    Please let me know if we are able to control the batch size for inserting data using procedures for staging tables. Using SAP XI. Any blogs on this. or any information. please let us know.
    Thank you
    Regards
    Ramidi

    Hi Ramidi,
    There is something called message split on adapter engine but it won't guarantee a sequence of adapter calls.
    here is a blog about it:
    /people/jin.shin/blog/2006/02/07/multi-mapping-without-bpm--yes-it146s-possible
    Maybe there is also an another simple way to do it.
    Regards,
    Wojciech
    <i>** Please reward points if found it useful **</i>

  • How to control the sequence of a map?

    Hello
    we are using a send email with attachment (map) in our process design, the email body has a few pdf documents, does anyone know how to control the sequence of attachment in the email body?
    thanks,

    Values in a map are ordered randomly, you can't predict the order.

  • I have an old iPod Classic with 80 GB (I think) of space. I saved all my songs in an external hard drive, but the iTunes library resided in an old computer (no longer working). Can I get the libray from my iPod and use it in my new computer (Windows)?

    I have an old iPod Classic with 80 GB (I think) of space. I saved all my songs in an external hard drive, but the iTunes library resided in an old computer (no longer working). Can I get the library from my iPod and use it in my new computer (Windows)?

    You might want to check your process for moving your iTunes music against this: http://support.apple.com/kb/HT4527.

  • My business has 100 ipads 3g with no control at the moment - i need to now control the ipads - what apps they can use - and restict certian use on the ipads - whats the best way to do this - it will need to be done remotley.

    my business has 100 ipads 3g with no control at the moment - i need to now control the ipads - what apps they can use - and restict certian use on the ipads - whats the best way to do this - it will need to be done remotley.

    MDM  -- moble device management 
    MDMs
    Airwatch, Meraki, MobileIron, Profile Manager on OS X Server, or Zenprise
    For a comparison see this page:
    http://www.enterpriseios.com/wiki/Comparison_MDM_Providers
    Airwatch
      http://www.air-watch.com/
    Meraki -- A free MDM   [ expect lots of email and phone calls about upgrades ]
      http://www.meraki.com/products/systems-manager/
      https://discussions.apple.com/thread/4067210?tstart=0
      Good howto by Sergio Sosa.
      https://discussions.apple.com/thread/2594001?start=15&tstart=0
    MobileIron
      http://www.mobileiron.com/
    Profile Manager by Apple
    Zenprise
      http://www.zenprise.com/

  • Controlling the sequence of Actions in PA 40?

    dear experts,
    can we control the sequence of actions executed thro PA 40?
    for example , we have the following sequence actions in a client scenario
    1. Hiring ( prioritised as 1)
    2.probation( prioritised as 2)
    3.confirmation( prioritised as 3)
    4.change of salary( prioritised as 4)
    5.transfer( prioritised as 5)
    6.deputation( prioritised as 6)
    7.separation (priotirises as 7)
    Actually, SAP allows  you to run change of salary after probation without confirmation
    it allows you to run separation action after change of salary without transfer or deputation in between,
    By prioritising actions customisation, system only throws a warning and allows the user to execute any actions after any other action except Hiring action ( sequence no 1)
    can we prevent the system to prevent this ,by doing customistion  , but without going for any development like hardcoding  of sequence
    soliciting PA experts advice
    nataraj s
    sap hr consultant

    hi,
    as far as i know there is no such customization.
    as such the sequence of actions depend on the clients.
    hence they are left independent of each other.
    there is no set standard or sequence of actions.
    like a person can be hired today can be transferred tomorrow.
    for some other person hired today for some reason terminated tomorrow.
    one person hired to day next action can be  cahnge in pay.
    hence i dont beleive waht you are asking for is possible.
    regards
    nalla

  • How can I control the order of iDVD menu items using the Arrow keys?

    I have a submenu screen containing 10 selectable buttons plus the Return Arrow button.  I have ordered all the slideshows in the correct order in the DVD map.  However, when I run the program, the arrow keys jump the selection focus in an apparently random sequence.  How can I control the order of the selection focus?
    I'm using iDVD v 7.1.2
    TIA.
    Ron

    Hi
    There is one thing You might miss in iDVD - So do I - the ability to re-arrange in the DVD map (block diagram)
    The order things will be pplayed or addrssed is same as the order each item is introduced into iDVD.
    To my knowledge ther is no way around this.
    Yours Bengt W

  • How can i control the motor movement of stepper motor using a NI PXI 7330

    Good day to all,
    i'm a newbie in programming in motion control of NI. I just want to ask if how can i control the clockwise and counter-clockwise rotation of a stepper motor using NI PXI 7330 module. all i can do is the counter-clockwise rotation using the example vi (Simple one-axis move.vi) found in the examples of LabView 2009.
    Thanks

    what type of limit switch sensor are you using and how did you wire itß What are your MAX settings regarding the limit switches?
    Good day SIr Jochen,
    I am using two reed switch for the reverse and forward limit. I wired the signal wire of the reed switch to the limit ports(forward and reverse Limit) and its ground to the digital ground of the UMI-7764.
    the attachment below is the my max configuration about limit switches
    Attachments:
    max configuration.JPG ‏155 KB

  • Control the sequence of invocation of Partner Links in SOA11g

    H!,
    I have a BPEL11g process where i am invoking multiple partner links sequentially from my bpel.
    Through invoking the partner links i am inserting records in oracle base tables.
    The invocation sequence is: PartnerLink1 and then PartnerLink2.
    First i invoke partner link1 (web service invoke to another deployed bpel process(db insert)) and inserted records in location table which has foreign key relationship with order_release table.
    Then i invoke partner link2 (adapter service:db insert) and inserted records in order_release which has dependency on location table. The second insertion needs first insertion to be successful.
    Issue:+ The second invocations takes place to insert record into order_release table before the first invocation of partner link gets completed.
    So getting error that corresponding record is not present in location table as it is yet to commit the new record.
    Plz Suggest:+ How to stop the invocation of partner link2 to take place before invocation of parnerlink1 gets completed.
    a. Tweaking the threads or b. using some partner link property, how i can succeed in correcting the sequence of invocation?
    Edited by: rashmi r on Apr 3, 2013 6:29 AM
    Edited by: rashmi r on Apr 3, 2013 6:32 AM
    Edited by: rashmi r on Apr 3, 2013 6:34 AM
    Edited by: rashmi r on Apr 3, 2013 6:37 AM

    Thanks a million to all three of you. I just wish I had asked earlier!
    Cheers, Veit

  • How can I control the FAQ title with CSS when using the Ajax effect

    I am calling the FAQ module with the Ajax effect.
    I would like to set different states with CSS to the title;
    I have tried to use :hover, :active and :focus on the div.
    It would be nice with a different styling when the item is "open"
    (I know there is a problem with the stacking, but I posted that in another thread)
    link

    Hi
    There is one thing You might miss in iDVD - So do I - the ability to re-arrange in the DVD map (block diagram)
    The order things will be pplayed or addrssed is same as the order each item is introduced into iDVD.
    To my knowledge ther is no way around this.
    Yours Bengt W

  • How control the sequence in forms

    hi all,
    i have id column in the form which has to generate the sequence number automatically,i have created the sequence in the database and assigned it and is working fine.
    But the problem is that either we save the record or not the sequence is generating.so the as soon as we get in to insert mode the number is generated.
    i need the sequence to be generated only when i save the record.
    can anyone could help out with the situation.
    thanks,
    sanjeev varma.s.

    hi,
    i have already tried it out ,but couldn't get the result.
    our problem is that i'm are not able to restrict the sequence, if i'm not saving the record.i have done it in when-validate-item of the previous naviagtion item so that the column on which the sequence is generated can be skipped and sequence is generated automatically.
    the below is the code we have tried it out.
    DECLARE
    v_cname VARCHAR2 (50);
    v_com_seq NUMBER;
    BEGIN
    SELECT NAME
    INTO v_cname
    FROM company
    WHERE NAME = :company.NAME;
    IF v_cname = :company.NAME THEN
    MESSAGE ('Company name already exists Can not be duplicated');
    MESSAGE (' ');
    END IF;
    RAISE form_trigger_failure;
    EXCEPTION
    WHEN NO_DATA_FOUND THEN
    SELECT COMSEQ.NEXTVAL INTO v_com_seq FROM dual;
    :company.CID := substr(:company.NAME,1,3)||v_com_seq;
    END;
    thanks,
    sanjeev varma s

  • Control the activity flow in thread T1 using thread T2

    Hi, im asking this question because i have two threads, one running at background, one at foreground directly interacting with users. the two should also intereact with each other, and perform correct actions depending on the command/request received from the other. for instance,
    Class BackgroundThread implements Runnable{
        private boolean _stop;
        public void run(){
            while(!shouldStop(){
                //do something
        public boolean shouldStop(){
            return _stop;
        public void signalStop(){
            _stop=false;
        public void signalContinue(){
            _stop=true;
    Class ForegroundThread implements Runnable{
        BackgroundThread _bgThread;
        public ForegroundThread (BackgroundThread bgThread){
            _bgThread=bgThread;
        public void run(){
            // lines of code that catches user input from console
            case 'r'
                _bgThread.signalContinue();    //LINE A
                break;
            case 's'
                _bgThread.signalStop();   
                break;
    public Class ClientMain(){
        public static void main(args[]){
            BackgroundThread bgT = new BackgroundThread();
            new Thread(bgT).start();
            new ForegroundThread (bgT).run;
        }these are just sample code, may have errors, but the logic i suppose is clear. basically users interact with foreground thread, and they can control the running of background thread by typing command, r and s. 's' signal stop, 'r' signal continue.
    at present i managed to stop the background thread - strictly not stopping it, but stop goin into the 'while' loop - once user key in 's'; but then if i key in 'r', the program does nothing. while what i want the system to do is to resume the execution of 'while'. i tried to replace the line A to
    _bgThread.signalContinue();
    _bgThread.run();and it does re-run, but then i cannot control the thread no more. ie, it doesnt stop upon command 's' anymore.
    how can i fix this please, any hints? thanks very much in advance!

    when the background thread exits the while loop, the thread stops and exits.
    try this, it works, but obviously will need to be customized for what you want to do. It should give you an idea though.
    class BackgroundThread implements Runnable
        private boolean _stop;
        private boolean _wait = true;
        public void run(){
             while(_wait)
                 while(!shouldStop()){
                      try{
                           Thread.sleep(1000);
                           System.out.println("Do Something");
                      catch(InterruptedException ie)
                 try{
                      Thread.sleep(1000);
                 catch(InterruptedException ie)
                 System.out.println("Paused...");
        public boolean shouldStop(){
            return _stop;
        public void signalStop(){
            _stop=true;
        public void signalContinue(){
            _stop=false;
        public void signalPause()
             _stop = true;
        public void signalExit()
             _wait = false;
             _stop = true;
    class ForegroundThread implements Runnable{
        BackgroundThread _bgThread;
        public ForegroundThread (BackgroundThread bgThread){
            _bgThread=bgThread;
        public void run(){
            // lines of code that catches user input from console
            Scanner scan = new Scanner(System.in);
            boolean exit = false;
             while(!exit)
                 System.out.println("enter action");
                 char resp = scan.next().charAt(0);
                 switch(resp)
                  case 'r':
                     _bgThread.signalContinue();    //LINE A
                     break;
                 case 's':
                     _bgThread.signalPause();   
                     break;
                 case 'e':
                      _bgThread.signalExit();
                      exit = true;
                      break;
    public class ClientMain
        public static void main(String [] args )
            BackgroundThread bgT = new BackgroundThread();
            new Thread(bgT).start();
            new ForegroundThread(bgT).run();
    }

  • I have two questions.  How do I burn a DVD from a slideshow created in IPhoto without using IDVD which is no longer available?!!  And is there any way to control the automatic zooming in my slideshow?

    I know IMac messed up by no longer offering IDVD OR ILIFE on their new computers. Yes I too am mad I spent the money.  But does anyone have a solution  on how to work with the limited programs I did get?  Or what programs do you suggest I purchase to be able to do something as simple as burn a slidewshow on a DVD!!!!  I already purchases Xilisoft DVD which does not allow for photos only videos.  I want to use both!  I have had my new mac less than a year.  Can I still return it?

    If you contact Apple at
    U.S. iPod, Mac and iPad technical support:
    (800) APL-CARE (800-275-2273)
    You should be able to get a copy of the original DVDs for  a nominal charge.

  • HT4623 I changed my Apple ID email on my iPad and now whenever it asks me for the pass on my iPods it uses the wrong eMail. What do I do????

    Ahhhh! I changed the Apple ID for my iTunes account because I don't really use that email anymore. When I did all was well until my iPod 5 started to ask for the password using a pop up which is normal. But when I typed in the password I realized that it didn't have the right email. What should I do to fix it?

    Maybe:
    - Apps are locked to the account that purchased them.
    - To update apps you have to sign into the account that purchased the apps. If you have apps that need updating purchased from more than one account you have to update them one at a time until the remaining apps were purchased from one account.
    Just what are yo doing when the message occurs?

  • Monitoring and controlling the Tag values of Logix 5000 using Labview while using RSLogix 5000 to program the PLC

    Hi
      I want to know how to change the input bits or tags of a PLC which is programmed using RSlogix 5000. But I need to use Labview to monitor the input bits ( like in Digitial Input bits) and then be able to change the BITS while the PLC runs and the PLC should be able to detect the change in input bits and act accordingly. The programming is done using ladder logic and its done in RSLogix 5000 and dumped into PLC using RSLogix.
    Thanks in advance

    msu,
    Once you have the OPC server up and running the best way to communicate with is is through the Datalogging and Supervisory Control module for LabVIEW.  The DSC module allows you to bind shared variables to items on your OPC server.  Then you could just read from or write to these shared variables to access the data on this OPC server.  If you don't want to get this module you could also just use datasocket to read/write from an OPC server.  The URL you would use in data socket would look something like "opc://localhost/{your opc item's address}".
    -Justin D

Maybe you are looking for

  • How to generate graph

    Hi All I have an query i want to generate graph with below data data are hard coded for both the tables normally if data is coming from DB than we will just do RT click and click on TURN INTO and get graph options. due to hard coded all options are h

  • Normal operating temperature for imac

    I have just downloaded "temperature monitor" and it indicates the CPU is at 46c. At times the cooling fan will kick in at 26c yet currently at 46c it is not running.

  • Need help Nokia Software Updater

    Hi There! I´m owning an Nokia 6630 Smartphone code 0520870 with software Version 5.03.08 and my provider is A1 Mobilkom Austria (vodafone) and the Nokia Software updater end´s with this Message: No Softwareupdate´s available for your phone. There is

  • Error #1053: Illegal override of subtopic in mx.messaging.Consumer

    Having some issues here.... Fresh install of FlexBuilder 2.01 Created a New Flex Project, Selected Flex Data Services (compile locally) When I compile the .mxml and it opens in a browser window, I get the following Flash player error: VerifyError: Er

  • Why does my mail beach ball all the time

    Is there a conflict or bug in my new Lion?