Conversion of Planned order into a Production Order.

Hi All,
         I have one ticket in which I have to change the format of generating serial no.s.This format has to consider
Basic Start Date while generating it.In our project Serial No is getting generated at the time of Production Order.
So I have to pass this start date before Prod Order is getting created from a Planned Order.What i want to know is it possible to pass a start date when a Planned Order is getting converted into Prod Order as i think it will be a standard SAP program which will convert a Planned Order into Prod Order.Any suggestions on how to achieve this is most welcome.
Thanks in Advance,
Saket

Hi,
I am not able to get what is passing the start date.
Second thing is how you are generating the serial number - manually or automatic?
If you are generating serial number automatic, then it is not possible to generate it considering the basic start date.
But if you are entering the serial number manually, then there should not be any problem as system will accept that serial number which you enter at the time of conversion of planned order to production order.
Regards
Amit parkhi

Similar Messages

  • Collective conversion of planned order to one production order

    Dear all,
    1. I have N number of pld ord for same material so i need to convert as production order with cumulative quantity.
    Because to reduce  Issing and confirming and receiving of number of production orders.
    2. I need to create Number of production order with diffferent material numbers  in one screen with different production order number.
    Because per day i need to create more number of production order with different material number. If i create one by one it will consume more time as well as its not practical possible for our business scenario.
    Pls let me know any standards are available in SAP.
    Regards,
    S.Suresh.

    Dear Suresh,
    You can convert Planned Orders into Production order collectively as a mass maintanance in CO41 Tcode.
    Revert if any doubt in case using above tcode.
    Further if you wish to have one production order against multiple planned orders it is not possible as per Standard SAP.
    You can convert to each planned order into individual production order not to single production order.
    If you wish clubbed production order then better you use Individual / Collective Indicator  as
    2     Collective requirements only
    Then you will get cumulative planned orders only against each material and you can convert all of them cumulatively to production orders in CO41 as a mass maintanance.
    Hope your problem resolves.
    Regards,
    Tejas
    Regards,
    Tejas

  • How to conversion of SNP orders into PP/DS orders

    Hi gurus,
    How to conversion of SNP orders into PP/DS orders, Can u explain me, what is the process.
    PRASAD

    Hi,
    You have to convert SNP Planned Orders to PPDS Planned Orders thru /SAPAPO/RRP_SNP2PPDS by specifying
    Planning version,product and location and the standard heuristic SAP_SNP_SNGL and propagation range.
    or in /SAPAPO/RRP3 and /SAPAPO/RRP4 directly.
    Thanks,
    nandha

  • Planned order to multiple Production Orders

    Dear Gurus,
    I would like to split planned order qty and convert into multiple production orders in CO41, is there any user exits or BADI which makes it possible?
    Many Thanks!
    //Sreenivas

    try the following function module
    CO_AB_CONVERT_PLANNED_ORDERS
    CO_SD_PLANNED_ORDER_CONVERT

  • Change of planning plant in the production Order

    Dear Sapians
    Please suggest me how we can change the planning plant in the production order once it is saved and confirmed before taking goods receipt.
    Thanks
    GVRR

    Hi Prasanna,
    1. Order is with material
    2. This order is created independently
    3. yes there are dependent requirements
    Scenario is we have created Production orders with X plant. Later after confirmation and before GRN planning plant is changed as per the business decission. Now client wants to receive the goods in new planning plant.
    I want to know, How can business area and functional area help us to receive the goods in changed planning plant scenario. can we maintain the plant values in this fields.
    Regards
    GVRR

  • Sales orders asignment to Production order

    Hi,
        I need the following requirement,
        I have 4 sales orders which has different delivery date. I want to have a single production order for these 4 sales orders (I am using strategy 40 and collective requirement option in MRP 4 view), My requirement In production order assignment Tab which sales order will be assignment, If not how can I arrive it, Is there any User exit for this?
    Br,
    Muthamil Murugan.G

    Dear Murugan,
    Your strategy 40 will not have sales order reference. But sales order quantity will be considered by strategy 40 and your PIR'S will be reduced. but you cannot have any sales order reference in the production order. If you want sales order reference in production use strategy 20, 50, or other MTO strategy and use t-code CO08 to create production order giving sales order number. And combining of many sales order into one, as per my knowledge it is not possible in standard SAP but you can have a single delivery of many sales order. 
    check the below link:
    Combining Multiple Sales Orders into one Sales Order
    combing multiple sales order into one delivery - help needed!
    Hope it will help. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Question about the rescheduling of a Sales Order and its Production Order

    Hello Everybody,
    I experience something strange with the rescheduling of a Sales Order and its corresponding Production Order.
    It will be easier to explain with an example...
    For a material, I have created a Sales Order.
    And from this Sales Order, I have now a Production Order converted from a Planned Order generated by the MRP Run.
    This is what I have in transaction MD04:
    SALES ORDER
    AV DATE: 20/02/2008
    GR DATE: 20/02/2008
    PRODUCTION ORDER
    AV DATE: 20/02/2008
    GR DATE: 18/02/2008    (GR process time is 2 days).
    ==> OK !
    Now, I have to reschedule the Sales Order one week sooner.
    SALES ORDER
    AV DATE: 13/02/2008
    GR DATE: 13/02/2008
    After transaction COHV to reschedule the Production Order, I have:
    PRODUCTION ORDER
    AV DATE: 15/02/2008
    GR DATE: 13/02/2008
    But I expected to have:
    PRODUCTION ORDER
    AV DATE: 13/02/2008
    GR DATE: 11/02/2008
    Do you have an idea about what is wrong?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    Hello.
    Thank you for your reply.
    But in fact, I am doing some tests on a test platform, which is using an "old" copy of production database.
    So, there can't be data already scheduled for the dates I am using.
    Moreover, I just tried now to do the same with dates in November 2008, exactly with the same results.
    In production platform, they experience this problem too.
    Summary of my new test:
    Before rescheduling:
    SALES ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 20/11/2008
    PROD. ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 18/11/2008
    After rescheduling of one week sooner:
    SALES ORDER:
    AV. DATE = 13/11/2008
    GR. DATE = 13/11/2008
    PROD. ORDER:
    AV. DATE = 15/11/2008  (ipo  13/11/2008)
    GR. DATE = 13/11/2008  (ipo  11/11/2008)
    I really don't understand why I don't have the same kind of dates as the ones I get before the rescheduling...
    In my mind, I expect to have all these dates set back of one week...
    Regards
    Rudy
    Rudy

  • Updating Sales Order no in Production Order

    we have csenario for Sales Order :  Inquery - Quotation - Sales Order .
    In PP we have MTO scenarion . when i run MRP and convert the plan order to Production Order , in place of Sales Order it was updatin Quotation in Production Order .
    we have checked SD config for sales doc Item category =TAC and in Material Master we will used Item Category = NORM
    Please suggest is there any other setting for updating Sales Order no in Production Order .
    Thnx.

    Hi,
    I assume that you are using the strategy 20 (MTO). Go to OVZG here select the class 040 Indiv.cust.w/o cons., keep BLANK for account assignment consumption and rerun the whole cycle and check.
    Thanks
    Hrishi

  • Sales Order Text to Production Order Text

    Dear Experts,
    When creating a sales order in VA01, I added in some comments in the item level Texts tab.
    How can I configure the system so that when a production order is created from this sales order, the comments entered in the sales order will be automatically populated in the Long Text tab of Production Order header.
    This is because during the creation of sales order, there may be certain comments and/or instructions that need to be passed to the production line. We want the texts to flow through to the production order automatically.
    Any ideas?
    Thanks in advance.

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • BAPI - Goods receipt and then create transfer order for a production order

    Hello Everyone
    We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
    We are using BAPI 'BAPI_GOODSMVT_CREATE'
          i_items-orderid = wa_afpo-aufnr .
          i_items-order_itno = wa_afpo-posnr.
          i_items-mvt_ind = 'F'.
          i_items-stge_loc   = wa_afpo-lgort.
         i_items-stge_type = '901'. "wf_styp.
         i_items-stge_bin = wf_sbin.
          i_items-entry_qnt  = wf_qty.
          i_items-entry_uom = wa_afpo-meins.
          i_items-entry_uom_iso = wa_afpo-meins.
          i_items-batch      = wa_zmobtag-charg.
          i_items-move_type  = '101'.
          i_items-move_reas  = wl_3131.
    We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
    The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
    My requirement : Creating material doc and then TO. Material should move to specified storage bin.
    Please let me know any alternate way( No BDC) so that my requirement is achieved.
    Regards
    Swetabh

    Hi ,
    can u check these fields ,
    STGE_TYPE_PC     UBTYP     CHAR     3     0     Storage type for transfer posting
    STGE_BIN_PC     UBPLA     CHAR     10     0     Storage bin for transfer posting
    Regards
    Prabhu

  • Download Maintenance Orders instead of Production Order in SAP IM-3.2

    Hi All,
    I am trying to fetch Maintenance orders instead of production order in syclo agentry IM-3.2
    In the receipts screen their is a button GetProdOrder which fetches the Production order,instead of fetching the Production Order i want to change it to fetch the Maintenance Orders.
    please suggest me steps for the above change.
    Thanks ,
    Deepak.M
    Tags edited by: Michael Appleby

    Deepak,
    I don't think this will be easily accomplished.  The BAPI is written specifically for production orders.  I believe it would require changes to the BAPI itself, or changing the java to point to a different BAPI.
    Jason Latko - Senior Product Developer at SAP

  • Copy purchase order text to production order text

    Hello,
    purchase order text should be copied to production order text so that the end user can see and edit the text before saving the production order. I'm trying to do it with exit PPCO0006. I can read the purchase order text with read_text but cannot show it on prod order long text tab page. And cannot save it because the production order does not have a number yet.
    How should this be done? If I copy the text to clipboard can it be pasted to production order long text somehow? Or is there a long text object in production order which I could call and insert the text in it? Or what?

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • Transfer Order number for Production order

    Hi,
    what is the best way to get the transfer order number (LTAK-TANUM) for picking for a production order?
    Picking can occur first in IM (via MB1A for example) or in WM (via LP10). Requirement Tracking Number cannot be used as it has only a length of 10 characters (production order number up to 12 characters).
    Reservation number (LTAK-RSNUM) is only filled in case picking is done from IM first.
    Cheers
    Mathias

    Hi,
    how are other companies handling this if they want to pick from the warehouse (e.g. using CO27) for a production order and the production order number has 12 characters? The bin (LTAP-VLPLA) and the requirement number (LTAK-BENUM) only have up to 10 characters.
    Is there a standard way in SAP to print out the complete 12 character number on the picking list? I could not find another field where the production order number appears.
    P.S. There are already some production order types in use that have a number range with 12 characters.
    Cheers
    Mathias

  • Sales order field in production order

    Hi Gurus,
    I see there is a field sales order assigned to production order. In my scenario when we create a sales order production order gets created automatically in background due to the strategy group. So in production order, i see a field sales order and also i can see the sales order number in that field which is fine.
    But when we create a sales order with reference to quote, then in production order i see the quote number displayed in sales order field in the production order.
    My client wanted to have sales order number rather quote.
    Please suggest.
    Thanks,
    Quantum.

    Hi,
    Please note that if sales order stock has already been assigned to a quotation, the stock of the resulting orders is also managed under the quotation number.
    If you require to tag the sale order no to the production order then define the requirement type not as the make to order. This you can control at item category level also. While for sales order make requirement type make to order related.
    While doing so please note that you have to use the special rule to determine the requirement type which will based on the item category and mrp type.
    Hope this will help you.
    Thanks and regards,
    Atul

Maybe you are looking for

  • Windows 7 repair install failure...

    hello. i'm running windows 7 64bit on a boot camp partition. something is wrong with it (long story). i'm attempting to do a 'repair install'; unfortunately, i keep getting error 0x80070005 (windows was unable to create a required install folder). i'

  • Third Party Plugins Stripped Out After Editing/Saving

    Hello All, I'm really hoping someone can help. Ok here's the tech stuff: Workflow- Mac - OS 10.4.9, InDesign CS3 5.0.2 Windows - XP InCopy CS3 5.0.2 Plugins used in InDesign (Mac) AutoPrice (Meadows Pub.) & Sonar Indexing (Virginia Systems) These 2 p

  • How user data in word/exel file is going to to be stored in SharePoint content databse

    Where user data in word/exel file is going to to be stored in SharePoint farm. Kindly share MS KBs on this.

  • Directory creation in JFileChooser

    Hello all, I am using a JFileChooser but the "create folder" button is disabled. How do you enable and make use of this button. I cant find it in the API. thanks

  • GET element(s) by an attributes value

    Hi, Is it possible to get an element of a node by the value of 1 attribute? I know there is a method getelement() where you can specify an index,but I don't find a method where you can specify the attribute's name and value. Now I have to loop trough