Conversion of planned order to production order resulting into Runtime error

Hello Gurus
     I am trying to convert Planned order into production order in MD04,  but I am getting ABAP Runtime error; for details please see image here posted.
Please help me to resolve the issue.
Thanks in advance!
# If anybody wants remote access of my system through Team viewer I am ready to share my desktop for same.
Regards!
AKSHAY

Hi Akshay,
Overflow during arithmetical operation type P COMPUTE_BCD_OVERFLOW comes when the maximum of the internal ABAP field that is 99,999,999,999.99 many be quantity, cost value UoM conversion etc.
Please check how this UOM (unit of measure) is defined in transaction CUNI. In this transaction, you may have set the Value-based commitment indicator. This indicator controls whether commitments for the chosen unit of measure are recorded on a quantity basis or a value basis.
Please search OSS note for this dump and also raise this to OSS.
Regards,
R.Brahmankar

Similar Messages

  • Conversion of planned orders to production orders

    Hi,
    we are doing mass conversion of planned orders to production orders and performing capacity availability check, how system will give log information based on these two things,
    when i perform availability check at time of order creation and will not allow to create if anything is missing (i selected user decides option in configuration), does it show any error log report and where can i see.
    When i perform availability check at time of release, if anything missing it will not allow to release and give a choice for a user to release in normal production order creation process, how it will work in mass conversion. is there any standard report to look at missing planned orders so that users will come to know and then decides whether to convert to production order or not.
    thanks in advance.

    Dear ,
    In SM38-Enter PPBICO40 -Execute -Here you need to Mark the Output log option with Erros only or Error Folder for each MRP controller  .Frist you do it in test mode and then remove test mode , mark the Output log option as per requured field and check the result .
    refer this useful thread : Program PPBICO40 for conversion of planned orders to production order
    Regards
    JH

  • BUG in  Conversion of Planned order to Production Order.

    Dear all,
    I got an error while conversion of planned order to production order are as follows,
    No Default values maintained for op.generation for order type ZFT1(matlPILSF002).
    Can anyone please guide me to proceed further.
    Kumar.

    Hi,
    Root cause behind this problem is, no Routing found.
    First complete below settings.
    - Go to OPJG And create defult Operation creation in case of no Routing found.This setting will generate the default Operation incase of no routing found during Order creation.
    - In T.code OPJF Create automatic selection parameters (Selection ID) for Routing.
    - In T.Code OPL8 Maintain Selection ID for Routing and also maintain type of Routing selection (3 - Automatic Routing selection)
    Regards,
    Dhaval

  • Capacity check during Planned order to production order conversion

    Hello Gurus,
    I have a strange situation during capacity check.
    While Converting the planned order to Production order, I release the order and I don't get any warning. All work centers are available
    But for the same material/quantity/dates, if I create the Production order manually, release it, system check the capacity and I got the message the Capacity Over loaded (which is correct also as there are overload on the work centers).
    My question is why I am not getting this message while converting the planned order to production order.
    There are overload on the work centers and manual creation of Production order is working fine, but problem is during planned order to production order conversion.
    For information, I have maintained Finite scheduling indicator in OPKP, capacity availability indicator "NO CHECK" is also blank in OPJK.
    It will be grateful if you can please help me here.
    Thanks in advance,
    Sandeep Kumar

    Hi KK,
    Thanks for your feedback.
    I have checked all these settings but still no success.
    I am surprised but it is not a customizing issue I believe, because capacity is checked in Dev client while converting planned order to production order. I am facing this issue only in Staging client.
    Master Data is same. In CM01, in Quality(Staging) client, it is showing overload. while creating production order, it shows overload but only when convert from planned order to production order, it does not show overload .
    Please suggest what else I need to check.
    thanks in advance.
    Br,
    Sandeep Kumar

  • Conversion planned order to production order without BOM - no message

    Hello
    Problem: during conversion planned order to production order system does not inform (warning or error) that BOM is not exist. Is it possible  to force system to any reaction by standard configuration ?
    Everything is ok if production order is created by CO01, but during conversion there is no any reaction - production order is created, released etc. I only see by system status that something is wrong (NMAT - No material components). Probably we will have to do it by User Exit but I want to know that all standard configs are exhausted.
    Thx in advance. Reg.
    Joanna

    Hello
    The BOM is not read again when a planned order is converted to production order on the standard system.
    You may implement the modification from note 391846 to force master data to be read again, therefore, an error message will be triggered during the conversion when the BOM is invalid.
    BR Caetano

  • Bug in Conversion 4m Planned Order to Production Order.

    Hi guys,
    While conversion of Planned order to Production Order i got the below error,
    "YOU CANNOT MAKE AN ASSIGNMENT TO MAKE-TO-ORDER STOCK"
    Message # CO684
    Settings i ve done,
    MRP3 View for this particular Material i have selected Stratergy as 20.
    Please help me to resolve this issue,and what are the settings i need to do.
    Awaiting a positive reply.
    Regards,
    Kumar.S

    Resolved Sucessfully
    Kumar.S

  • Partial conversion of Planned orders to Production orders

    Hi all
    I wan tot partially convert planned order to production order. I am able to do this with MD04. Is there a tcode for mass partial conversion. CO41 does not allow a partial conversion. Is there a way I can collectively do a partial conversion.
    thanks

    Hi John,
    To the best of my knowledge there is no t-code to do a mass partial conversion of planned orders.
    You can try with a lsmw recording of t-code co48 & then input your planned order numbers with the qty to be partially converted or alternatively use co41, change the qty & convert the planned orders, but with this you will need to re-run MRP to create another planned order for the balance qty.
    Hope the above helps.
    Regards,
    Vivek

  • Program PPBICO40 for conversion of planned orders to production order

    Hi,
    The program PPBICO40 is for conversion of planned orders to production orders in the background job.But while set up of variant it is asking me for peson who created error folder and recipient.I want to know the significance of these two fields and how these are useful.
    Please throw some light on this.
    Thanks in advance,
    Ravi

    Dear,
    PPBICO40 the non-convertible planned orders are put together in one batch input session and can be postprocessed with batch input tools. It is possible to create a separate error session for each MRP controller.
    Error folder for each MRP controller: creates a separate error folder for each MRP controller.
    Receive folder according to view: If the indicator is set, the error folder is not deleted after processing in batch input.
    Creator of the error folder: User who is entered as creator in the error folder .
    Send mail: Sends a mail to the respective MRP controllers during the creation of a batch input session. If the indicator 'Error folder per MRP controller' is not set, the mail is sent to 'Recipient (alternative)'.
    Express document: sends mail as an express document.
    Recipient (alternative): Recipient of the mail, if no recipient is specified in the material requirements planning master record of the MRP controller responsible .
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Re-exploding BOM at conversion of planned order to production order

    Hi, all.
    I'd like to be able to specify that the planned orders I'm converting to production order re-explode the BOM on the scheduled date rather than the basic date of the production order.
    I want to be able to do this in customizing rather than specifying a BOM Explosion Date (fixed key date) in the planned order or independent requirements.  Is there anything in customizing that could do this?
    Thanks!
    Sarah

    Hi Sarah,
    I think you have checked the note:
    391846 Modif: Reading master data when converting planned order
    Because only with the modification of this note, you will be able to re-explode the BOM when converting the planned order to production order,  however, there is no way to set the BOM explosion date to the scheduled date during the conversion, there is no such customizing as the note only add three action for this function:
         ' '  Do not read
         '1'  Read with explosion date from planned order
         '2'  Read with newly determined explosion date
    So if you need such function, you may try to develop the modification by yourself.
    Regards,
    Rachel

  • Auto conversion of planned order to production orders

    Hi Gurus,
    Few days back I posted a question on; Auto conversion of planned order to production orders.
    http://forums.sdn.sap.com/thread.jspa?threadID=2135568&tstart=0
    There is standard SAP Transaction to run a batch job. no need to use - user exit or a BAPI
    Follow this procedure:
    TCode: COHV
    on the initial screen; select "CHECK BOX" for planned orders and deselect production orders.
    select mass processing tab.
    Function: 210 Convert planned orders.
    On Menu-Programs-Execute in background
    Thanks

    HI Alok,
    I was looking at CO41 and there is only one small problem with that. You have to give an 'Order Type' as a input. And I don't see 'Execute in the background' anywhere. I think I have to create a job using wizard in SM36.
    Please correct me if I'm wrong.
    Thanks

  • Conversion of planned order to Production Order

    Hi,
    I am converting Planned Order to Production Order in CO40.
    During this I am getting an information "Error or warning occured during master data transfer". What is this due to?
    Please give your inputs.
    Regards
    Ramakanth

    Hi,
    Check whether the BOM and Routing Maintained for this Material and they are valid or any PV maintained is OK.
    If there is any problem with the BOM then the relevant information like BOM Not fond etc.. can be seen in MD04 itself.
    It seems, the problem is with the Routing, as at the time of Production Order conversion only the Routing will be copied..
    So, check the details and revert for further discussion..
    Regards,
    Siva

  • Error in Conversion of Planned order to Production Order

    Hi,
    I am getting error while converting the planned order to Production order.
    Error is " Scheduling parameters not defined for the production orders"
    I have maintained the parameters in Prod-> Shop Floor Control -> Operations -> Scheduling....but after that also the same error is coming.
    And also I have maintained in the Capacity Req Planning
    Kindly assist me where I can define the scheduling parameters for the production orders in MTO cycle.
    Regards
    Toshi

    Hi ,
    My production order has been created ....but now m getting error while releasing it.
    Its saying that "No checking rule maintained for operation"
    I have maintained the checking rule in OPJK. But still m getting the same error.
    Kindly assist me for the above error.
    Regards
    Toshi

  • Pegging gets broken after conversion planned order to production order

    Hi All,
       I am getting pegging of finish product and dependent product planned order in MRP after taking MRP run.......But after converting the planned order to production order all order gets start from today by breaking the  relationship of each other..........can anybody explain me why this is happening.............your answer will be appreciate ........thanks in advance.........waiting for reply........
    Best Regards
    Sharad

    If it is backward scheduling, system takes the requirement date and starts going back…
    If the start date calculated is less than today date, then there are two ways system will do the adjustment.
    If in scheduling setting for production order, if there is a setting – start date allowed in past and you have entered some days, then system will go back to that date and schedule so that production order will start from past i.e. from today.
    Now if past days are not allowed then system will switch over to today scheduling I.e. the start date is today.
    In your case production order start date is today….this may be your case.
    Just for the case of testing see what is the production lead time and calculate the start date manually and see whether it is going beyond today?
    What is the exception message you have in the production order line in MD04…this also will give some idea…

  • Planned order to production order conversion problem

    Hai All,
    I am converting a planned order to production order during which following error is coming and system is not creating production order.
    You can not make an assignment to make to order stock.
    How to solve the issue.

    hai sundaresan
    Thanks for your reply. As you mentioned i am using strategy 25 for this Material. I have tried all the settings and changes mentioned by you. But not able to convert the planned order to production order. But when I changed the strategy to 20 and created a new sale order then did MRP run and then tried to convert the planned order to production order and it worked. Now my question is when it is working with 20 why it is giving problem with 20. Actually I am doing VC for material and while creating sale order selecting the values from characetristics. Can you help out why it is not working with strategy group 25.

  • Conversion Planned Order to Production Order

    I am trying to convert planned order to production oder with the transaction code: MD04
    I am getting this error when I try to convert planned order to production oder:
    Scheduling parameters are not defined for production orders
    Message no. CT604
    Diagnosis
    No scheduling levels have been defined for production orders  in Customizing for plant T024, order type PP01 and production scheduler * . You cannot conduct any scheduling until a selection ID for detailed planning, rough-cut planning or production rate planning has been entered. The selection ID determines the priority for the selection of the routing according to the criteria task list usage, type and status.
    Moreover the scheduling type must be maintained.
    Procedure
    Maintain the scheduling parameters by entering a selection ID for detailled planning, rough-cut planning or production rate planning and select the scheduling type.
    I have retraced my steps and checked all the configuration for scheduling parameters and they all seem accurate. I am lost as to how to keep going and where to look to correct my mistake. Can someone please guide me further so that I can convert planned orders to production order. Thank you for your time.

    Dar,
    ????  Now I am wondering how you were able to 
         ...checked in the following places:
    Define Production Scheduling Profile
    Define Production Scheduler
    Define Scheduling Parameters for Operations
    At any rate, basic questions by students are best addressed in one of the 'Community Discussion' forums, such ast Test and Playgound  Try SCN Features
    As always, in the T&P forum, like this one, it is expected that the questioner will first perform their own basic research, before posting a question, according to the rules of engagement.
    Best Regards,
    DB49

Maybe you are looking for

  • Message cannot be displayed because of the way it is formatted

    I have an email sent to my company exchange 2003 account with pdf attachments. When I open the email on my Ipad, I can view the the pdf files but when I move to another email message and then go back to the email message with the pdf files the follow

  • Error occurred during operating system migration/Heteregenous system copy

    Dear Gurus,    We are performing a system copy Source system: R/3 4.7 OS HP unix DB: Oracle Target system : R/3 4.7 OS windows DB: Oracle It throws an error while in phase of accessing a table which i have mentioned below and it's a show stopper for

  • How to lock a specific text message so it wont be deleted

    I would like to lock a specific someoen sent me but if i delete the rest of the the thread i wont that line will still be there. I used to do it on androind phone wasnt sure if iphone could do that as well.

  • DB backup restoration

    Hi, Apps team want to restore the DB backup of April 10 from Prod to QA . Backup team maintains DB backup of April 10 on tape as below in Prod but it is not available on disk. Online Full Backup time: 10\apr\2015 (01:31:14 EET) - 10\apr\2015 (02:52:0

  • QuickTime 7 not displaying video in 16.9 Anamorphic

    I'm sure other users have discovered this frustrating problem with QT 7 and if anyone can point me to a solution I would be very grateful. After exporting my edited Final Cut Pro movies (Which are displayed correctly in 16.9 widescreen) through Quick