COPA Assessment Cycle using KEU5 for multiple controlling areas

Hello All,
There is an organization with operations in several countries. There is a separate controlling area for each country. There is one controlling area, for instance, for Germany and another for Netherlands.
A problem is encountered while executing transaction KEU5 for multiple controlling areas in parallel. For instance, when one user from Germany executes KEU5 for an assessment cycle for Germany controlling area and at the same time another user from Netherlands tries to execute KEU5 for a cycle for NL controlling area, the user from Netherlands encounters an error message u201C'Cycle XXXX 01.02.2008 cannot be started because run group 0000 is locked'.
Apparently SAP allows assessment cycles for exactly one controlling area to be executed together. This poses a problem since the organization plans to implement SAP in several other countries (There will be one separate controlling area for each country as per the organization structure adopted by the company).
Any ideas, views or suggestions on the aforesaid issue would be highly appreciated.
Regards,
Soumya

Hi Soumya,
Did you find any text in SAP Documentation saying that "SAP does not allow cycles belonging to different controlling areas to be executed at the same time"...?
Pls find the following text from SAP Help...
Parallel Processing of Cycles of an Allocation Type
Use
Parallel processing of cycles results in considerable time savings. To process cycles of one allocation type in parallel, they must be assigned to different cycle run groups.
You define the cycle run groups in the cycle header data. You also assign cycles to the cycle run groups in the header data.
To process the cycles of a cycle run group in parallel, start the cycles one after the other, if required, in different sessions.
You are carrying out a cross-company code cost accounting and want to perform the actual assessment in the individual company codes in parallel. Create a cycle run group for each company code and assign the appropriate cycles to these groups. You can then carry out the actual assessment in the individual company codes in parallel.
When you execute a cycle, you can start a consistency check. The system checks whether you are allowed to execute the selected cycles in parallel.
Though I didn't come across such requirement, I feel, my earlier suggestion will work out...
Srikanth Munnaluri

Similar Messages

  • COPA Assessment cycle run KEU5

    What all  can be as a Reciever in COPA Assessment cycle.Why is COPA Assessment cycle run KEU5.

    Hi,
    What all can be as a Reciever in COPA Assessment cycle.
    ..this is [documented|http://help.sap.com/saphelp_erp60_sp/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm] in help.sap.com. As per [rules of engagement |/thread/931177 [original link is broken];pls. search before posting
    Why is COPA Assessment cycle run KEU5.
    ...no idea what you mean. Pls. explain.
    Regards
    Karl

  • Same operating concern for multiple controlling area

    Dear all,
    We have a senario in which multiple controlling area is defined with multiple currency. Is it feasible to use same operating concern or different.
    Thanks & Regards,
    Vishal

    Hi
    As long as the Fiscal Yr Variant is same between the two, you can use same Op Concern
    I dont think the above reply is valid because in my opinion, there is no restriction with regards to Currency
    br, Ajay M

  • COPA Assessment Cycle - Segment Wise

    Hello Friends,
    Good Day!
    I have created COPA Actual Assessment Cycle by T-Code KEU1. I have created around 5 Segments in that cycle. I want to execute the Assessment Cycle, but Segment Wise. I am trying to execute KEU5 and execute the Cycle. The assessment was properly as desired but for all Segment at once.
    But if I want to execute this Cycle Segment Wise, is there any possible way to do that?
    Many Thanks,
    Pritesh Lodha

    Dear Lodha,
    Please try in the following manner which may suits your requirement:
    Lock indicator available in Assessment cycles segment wise.
    If you have many segments and want to run for few segments, you can use the lock indicator in assessment cycle T Code: KSU2
    After locking the required segments you can run the assessment cycle using KEU5 by specifying the cycle name.
    Cycle will consider the active segments only.
    Regards,
    Pavan Kumar Arvapally

  • Prcessing KEU5 transaction for multilple controlling areas in parallel

    Hi,
    I have executed KUE5 transaction with an assessment cycle for a controlling area and when i try to execute the same transaction with an assessment cycle for another controlling area in parallel, there is an error message 'Cycle YOCETEST2 01.02.2008 cannot be started because run group 0000 is locked'.
    Please provide me a solution to execute the assessment cycles for multiple controlling areas in parallel.
    Regards,
    Satish.

    Hello,
    Are you able to solve this? I am getting this error sometimes when the transaction KSV5 fails.
    Please let me know.
    Thanks,
    Rushi

  • Posting - COPA Assessment Cycle

    Hi
    when i am trying to run KEU5 for period 12 for the previous fiscal year,the system is posting (with warning)but when i am running for period 1 for this fiscal year,the system is not posting.Can anyone please help me out.
    Whether any fiscal year change over or period end/year end activity has to be carried out for the COPA ASSESSMENT CYCLE.
    Appreciating for the help extended.
    Thnx & Regards
    Pran

    praveen,
    please check have u maintained fiscal year for the new year in fi and co
    sateesh

  • COPA-Assessment cycle KEU5

    We have run cost center -assessment cycle for a cost center group and all the cost of the profit centers are distributed to respective costcenters.And now we goto COPA-Assessment cycle KEU5 and run the cycle for the cycle with same cost center group as sender.
    System posts a difference amount of positive amount in the credit side of each costcenter of that group.Which reduces the credit value and shows in over/under absorption.
    Please suggest where from the system is finding the difference when all the costcenters are with zero value as cost is distributed thru CCA assessment cycle.What differences will a cycle run in co-pa determine.Please suggest.

    Hi,
    Actually, the Sales overhead and Corporate expenses which are captured in the Cost Center shall be allocated to the COPA. All other expenses captured in other Cost Centers shall be allocated to the Production and shall be absorped into the products manufactured. Hence, the same Cost Center shall not be used as sender in both the cycles. If we use like what you described, it will definitely result in over absorption that is more credits. Hence, please describe why need to add the same Cost Center group in both the CC cycle and Copa CC cycle.
    Trust this helps much!
    Cheers!

  • COPA assessment cycles for revenue postings

    Dear SAP gurus,
    is it possible to allocate revenues to COPA via assessment cycles (tcode KEU5)? We have service income related revenues that are not linked to COGS therefore they are posted to Cost Centers but they need to be visible in the cOPA report to have a complete profitability by product. at the moment I am not allowed as revenue are considered statistical postings... any clue how can I solve this?
    Thanks
    Monica

    Hi Monica
    Welcome to SDN!
    I dont agree with the responses provided above.. As far as I know, statistical postings can neither be settled, nor can they be allocated
    Catg 11 cost elements post statistically to Cost Centers.. Hence, you cant allocate...
    For the postings made till now, Manually update COPA using KE21N (If you are using Costing Based COPA)
    Way Forward: Make your service income postings in an Internal Order and you can settle the same to COPA and then allocate using Top Down Dist KE28...
    Try note 605281  and see if it allows to use IO as senders in KEU5.... 
    BR,Ajay M

  • How to analyse the Receiver Tracing Factor in COPA Assessment cycle -KEU5

    Hi
    While executing the COPA Assessment cycle,we will get receiver tracing factor.My client wants to know how we got that.How can i analyse that Receiver tracing factor?Kindly advice me...
    How can I recalculate the tracing factor for assesstment?
    For example, Actual Assessment Cycle RS_A01 under Segment ITCMFG2AD uses Variable Portions Rule for Receiver tracing Factor with Value Field of 62 Sales.
    The intent of this assessment was to be allocated based upon sales dollar values however when I review the test calculation, it appears the tracing factor is in billions of dollars when our monthly sales are in the million of dollars range.
    Supriya

    Hi,
    If Receier Tracing Factor Rule is Variable Portion, then please also check the Receiver Weighting factor (the last tab in the assessment cycle, it normally is 100 for the receivers.
    Secondly also check if there is different currency setting in CO Area & the Operating Concern which translates into different figures.
    Hope this works.
    Regards
    Saket

  • COPA Assessment Cycles

    Hi Guru,
    I really need some help with setting up COPA assessment cycles in 6.0.  I have used the best practice guides but unfortunately they were to lazy to be thorough.  I am using transaction code KEU7 to create the cycle.  I have attached a few segments to the cycle and added the sender/receiver (cost centers, companycode) details aswell. I checked it before saving the cycle and i got no error messages.  Now when i execute the cycle through tcode KEUB i get errorr/warning messages saying that "no valid sender entries found" and "this segment does not contain any senders".  I am not sure what i am missing and what i may be doing incorrectly.  Can someone please help me understand how to rectify this issue.  I am extremely generous with rewarding points!!!
    Thanks in advance,
    Shaun

    Hi Smith,
    Basically we created copa cycles in KEU1 and execute through KEU5.Find that recivers are product hi-erarachies, In our orgainisation  Corporate oh are be charge to products through copa cycles.
    Coming to your problem,When ever you define new copa cyle you find the error in differet ways.
    1) NO VALID SENDER FOUND  for segment means, Go to the segment there is an button ie consistancy chek box.Click on the check box System returns relavant segment.Observe that segment contains valid senders and revicers are produtc hierarachies or not.
    2) Other wise go to the segment and clik on find button, give the cost center, cost elements.Observe secondary cost elements and rules.
    3) other wise you can directly execute the co-pa cycle and click on segments.Here you can easily find that sender contains valid recivers or not.Basically these kind of error message will appears still now there is no Transaction passed to that products..
    I hope you understood.
    Regards
    Maruthi

  • COPA Assessment Cycle Process

    Hi
    Can any one tell me the entire COPA assessement Cycle with its uses and period end activity,sender and receiver logic,etc.
    If u have any document,can u send it to me... praviin_5at yahoo.co.in
    I m in 6.0
    Regards
    Praveen

    Hi,
    COPA assessment cycle is used to bring the overhead values, cost center values to copa through copa assessment cycle. for that you have to create a COPA assessment cycle in KEU1 with senders, receivers value fields. After that you have to execute  KEU5 t code.
    Sateesh

  • COPA Assessment Cycle

    Hi,
       I prepared one copa assessment cycle(T.code : KEU1) with a receiver type -Variable portions / Revenue with Billing type (F) . When i run the COPA Assessment cycle , i got a message that no sender values found. I created some revenue entries in the period 12 and some Cost center related expenditure.
      I prepared another cycle with receiving type as fixed amounts. When i run the KEU5 , The values are perfectly flowing.
      Any inputs on this. Thanks in advance.
    Thanking You,
    D.K.Lakshmi Narayana

    Hello Pran,
    With reference to your Error
    1) Please check the value of Sender. I think it is 0.
    2) In second case please add the reported GL in allocation structure KF which you are using.
    Hope this will help you.
    Regards,
    Pawan Kumar

  • COPA Assessment Cycles and FI Period closing.

    Hi Gurus,
    I have question related to the COPA Assessment cycles.
    We have closed the FI Period 03 and running the COPA Assessment cycles. while running the same, for few of the assesment cycles are completed and for the rest of the few  cycles it is error out stating the Period is closed.
    Why it is running successfully for few cycles and why it is complaining for Period closing for the others. We are on ECC 6 Version of SAP.
    Error out cycles contains Cost accounts and Asset Account GL Accoutns.

    Hi:
    If your CO allocation has some external postings (like GL or fixed assets) or generating some intercompany documents, then it needs FI to be open also. It happens sometimes if the allocation goes external so it would need fI period to be open also. If FI is close but CO is open, it would only work for CO specific allocations and others would error out.
    Please check the cycle/segment which is in error. If it is suppose to hit FI, then FI (OB52) and CO (OKP1) periods should be in sync.
    Thanks.
    Rahul

  • COPA Assessment cycle + OKP1

    Hi,
    As part of month end activities, OB52 and OKP1 were closed for last month.
    But still COPA assessment cycle is not completed.
    Pls. let me know if they need to be opened again for executing the assessment cycles.
    Thanks,
    Sridevi

    Hi Sridevi,
    Goto OKP1 T.code and open transaction "Assessment to CO-PA" for particulare period and execute Assessment cycles for COPA and  Goto OKP1 T.code and close transaction "Assessment to CO-PA" for previously open period.
    Hope this helps you.
    Thanks,
    Rau

  • USING MULTIPLE CONTROLLING AREA in the column

    Dear Experts,
    As per my requirement i need fetch the data from multiple controlling areas in to one report. please let us know how many ways are there? can i able to use controlling are in the column of the report. when i try to select the controlling area is not appearing in the coumn and it is appearing only in the gene

    Hi,
    You can select multiple Controlling area Please try with following steps.
    Maintain variant
    Click on attributes.
    Environment > Maint.sel.varables.
    Click on Display/Change.
    Create new Parameter.
    Maintain selection options to new parameter.
    Save and back.
    Select "T" in selection variable against Field name :Controlling Area.
    Select the selection variable(Newly created Parameter)
    Regards
    Mahesh

Maybe you are looking for

  • USBOTG and Charge Simultaneo​usly on Stream 8

    To keep this thread as efficient and productive as possible for all those who it will be useful to: Unless you have in front of you 1. A schematic of the Stream 8 USB port (USB port and battery power circuit etc) 2. Source code of the BIOS firmware a

  • Adobe Acrobat 8 crashes with IE 7

    Hello, I have exhausted all the help resources I can find regarding issues like this. My client has a full version of Adobe Acrobat 8 (and also we have installed adobe reader 9.0 for testing purposes). Her office website has a button where she can cr

  • Discussion Forum Email Subscriptions - Locking Issue

    After a user clicks on the envelope to enable e-mail subscriptions - from that point on, whenever the client attempts to post a message into that forum, s/he receives the following error message: Unable to perform the operation: JBO-26041: Failed to

  • CMSPermissionDeniedException

    Hi.. My system is sap.com/SAP-JEECOR  6.40 SP12 (1000.6.40.12.0.20050510033908)  20051122131622  sap.com/SAP-JEE  6.40 SP12 (1000.6.40.12.0.20050510034043)  20051122131702  i try to import configuration using NW Developer Studio to our NWDI server. B

  • Javascript stopped working

    Javascript just stopped working. I've tried toggling it on and off but this didn't help. this has affected every site that I know uses Javascript. The only thing I've done recently that I could imaging affected it was to install Vidalia (in order to