COPA -costing based accounting

Hi,
Could you please provide me configuration steps for costing based accounting?
That could be gratefully
Thank you

HI,
Please refer to the Thread posted today for COPA config.
Re: COPA
Basic config steps
1. Maintain Characterstics
IMG- CO-Profitablity Analysis - Structures -Define Operating Concern - Maintain char
2. Maintain Value Fields
3. Define Operating concern (Accouting based or costing based) , copy the standard operating concern settings provided by sAP
4. Set operating concern (KEBC)
5. Assign CO area to Operating concern
6. define profibaility segment char
2. Master Data
2.1 Maintain char values
2.2 Define char hierarchies
2.3Define Char derivation
2.4 Define and assign valuation strategy
2.5Define keys for accessing material cost estimates
2.6 Assign costing keys to any char
2.7 Assign value fields
3 Planning
3.1 Define number ranges for planning data
3.2 Maintain versions
3.3 Assign quantity fields
3.4 Setup planing framework
3.5 Assign char groups to plan cycles
3.6Assign receiver plan versions
3.7Define structure of cost center assessment
4.Flow of actual values
4.1 Define number ranges for actual postings
4.2Maintain value field groups
4.3 Assign value field grops for line item screens
4.4 Activiate transfer of incoming sales order
4.5 transfer of biling doc
4.6 Assign quantity fields
4.7 Maintain PA transfer structure for direct posting FI.MM (KEI2)
4.8 Automatic account assignment (OKB9)
4.9 Define PA transfer structure for variance settlement
4.10 Assign PA transfer structure to Settlement profile
Activate profitability analysis (customizng req gets generated)
All these can be accessed throug SPRO - Controlling - PA
AFter maintain the configuraiton settings, you can develop custom defined COPA reports using Information ssytems.
Hope this helps. Pls assign points as a way to say thanks
Thanks and regards,
RAdhika
Thanks and Regards,
Radhika

Similar Messages

  • COPA (Cost based & Account Based)

    Hi Gurus;
    Can some share me the documents for cost based & account based extraction of COPA.
    I am looking for differences and how exactly do you do extraction for the both(Step-by-step).
    I am also looking for which model should we use if COPA is not implemented in R/3 and otherwise.
    Thanks in advance!

    Hi,
    chk this:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20-%20retraction
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/fb07ab90-0201-0010-c489-d527d39cc0c6
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sapportals.km.docs/documents/a1-8-4/how%20to%20set%20up%20connection%20co-pa%20-%20extraction
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20upload%20co-pa%20hierarchies.pdf
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20extraction%203.0x
    Thanks,
    Raj

  • What is CoPA , what is the difference between Cost based, Account based

    Hi
    what is Copa, what is the difference between cost based , Account based copa,  where we can use. 
    can you send me please related document.
    Thank you
    Anil

    Hello
    Profitability Analysis (CO-PA) enables you to evaluate market segments, which can be classified according to products, customers, orders or any combination of these, or strategic business units, such as sales organizations or business areas, with respect to your company's profit or contribution margin.
    The aim of the system is to provide your sales, marketing, product management and corporate planning departments with information to support internal accounting and decision‑making.
    Two forms of Profitability Analysis are supported: costing-based and account-based.
    ·        Costing-based Profitability Analysis is the form of profitability analysis that groups costs and revenues according to value fields and costing-based valuation approaches, both of which you can define yourself. It guarantees you access at all times to a complete, short-term profitability report.
    ·        Account-based Profitability Analysis is a form of profitability analysis organized in accounts and using an account-based valuation approach. The distinguishing characteristic of this form is its use of cost and revenue elements. It provides you with a profitability report that is permanently reconciled with financial accounting.
    You can also use both of these types of CO‑PA simultaneously.
    Check this link for more help
    http://help.sap.com/erp2005_ehp_02/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    reg
    *assign points if useful

  • COPA cost based data source missing data in BI

    Hi All,
    We have a copa cost based datasource.User has complained that some data is missing in BI frrom R3.When we checked in Infopackage history no data loads got failed and all requests were succesful.
    Is there still a chance that data might get missed.
    I created a full infopackage and again ran the load .Again load is green and complete.Still the same data comes in PSA.
    Should i need to check repair full request flag.
    What could be the other reason.User sent the R3 COPA report screenshots highlighting the missing data.
    Regards,
    Sushant

    Hi,
    Please check if all the value fields from ECC have been mapped in BI system.
    May be the case that some value fields were not mapped & hence the data is missing.
    try & reconcile your data with the data from table CE1<OP Concern> from ECC side.
    u can Make use of transaction KE24 aswell.
    Thanks & Regards,
    VIraj Dhopavkar.

  • COPA Costed and Account based

    Hi Experts,
    I have running In BW, PA Costed based, and now I need activate PA accounted based extractor.
    a) does somebody have any doc or  how-to papers, specific about COPA Accounted?
    b) can will appear any issue or problem  about my current PA costed based loads?
    c) how can I see with pa model (costed or account based)  is running in the R/3 instalation?
    Thank you in adavance!

    Hi,
    Costing-based Profitability Analysis is the form of profitability analysis that groups costs and revenues according to value fields and costing-based valuation approaches, both of which you can define yourself. It guarantees you access at all times to a complete, short-term profitability report.
    Account-based Profitability Analysis is a form of profitability analysis organized in accounts and using an account-based valuation approach. The distinguishing characteristic of this form is its use of cost and revenue elements. It provides you with a profitability report that is permanently reconciled with financial accounting
    Hope this helps
    Regards,
    Aparna

  • COPA - costing based and accounting based

    Hi Expert,
    If the COPA implemented using acounting based and later can it change to costing based? 9 my client is using ECC6
    Please advice what will be the impact if the changes can be made or it is possible to do this way.
    Can any expert advice on this.
    Thanks & Regards

    Hi Sridhar,
    Thanks for your reply, can you explain if we want to stop one of the method, what is the steps that need to be done?
    thanks again!

  • COPA Cost based datasource

    Hi ,
    Please read the scenario given below:
    One cost based DataSource  is existing in ECC6.0, because of business requirements we have configured account based copa  and created the account based copa DataSource  on same operating concern. Now the problem is while enhancing the operating concern, copa consultant deleted few fields from the operating concern, that fields are part of the cost based DataSource . Because of that reason cost based DataSource  is not working, the only way I know is to create new cost based DataSource  with  the available fields. the existing DataSource  is delta one working based on time stamp management. If I create a new DataSource , is it possible to reinitialize delta from that time onwards( for example in production we have loaded data till yesterday with existing DataSource  using delta update, next day onwards is it possible to load data using the new DataSource ).
    If I create a new datasource it will work based on generic delta, but the previous one is working based on time stamp management
    Will it create any problem to reintialize the delta with new datasource?
    Please give your inputs.
    If any additional details is required, I will provide..
    Regards
    Nivas

    Hi Sreekanth ,
    Thanks for the update .
    Coming to R/3 side Is it possible to build to COPA Datasources based on i.e 1) Account absed COPA Datasource and Cost based Datasource .
    Presenty we are using Account based COPA datasource .
    We are planning to configure Cost based COPA datasource in coming days .
    Can we do it if so what are impacts and suggestions from your side .
    Thanks
    venkat

  • COPA Cost Based

    Hi,
    Are Value fields in the Operating Concern mapped to key figures in a cost based COPA?
    Thanks

    Summarization levels for an operating concern have the same function as aggregates for an infocube
    CO/PA summarization levels are managed by the infocube, and always contain the same numbers as the infocube that they are based on.
    Characteristics in CO/PA correspond to the characteristics in infocubes.
    The value fields in CO/PA can be regarded as key figures with additional summarization in each characteristics
    Line items in CO/PA can be compared to line items in the ODS

  • COPA- Cost-Based Chagning KSTAR(Cost Element) from technical to fixed field

    In the PA module-
    What are the implications with modifying the COPA field catalog in table v_tkef. That is changing a technical field (T) into a fixed characteristic or alternatively modifying the function module rke_external_data_get to allow technical fields to do the same functionality as B, S, U, or V.
    B- Basic key figure
    D- Dimension (characteristic)
    F- Fixed characteristic
    K- Key figure
    S- Fixed basic key figure
    T- Technical field
    U- Unit
    V- Fixed unit
    Details of Issue-
    We are using Cost-based COPA and there a requirement to post actual and plan documents by cost element in PA. However Cost element (KSTAR) is a technical field in cost based COPA.
    We would like the implications of modifying the field characteristics of KSTAR from technical to Fixed characteristic and setup the KSTAR as a characteristic within the Operating Concern.
    Your answers will be helpful in knowing the implications, feasibility and recommendations.
    Thanks,
    Krishna

    Hi,
    YOu are making that kink on CJIC where you can assign fix asset to WBS , before doing that you needs to check procured items agaist that particular WBS(on CJI3) & get create fix asset. To my knowledge that is the standard way to link fix asset & WBS rather than having ABAP validation.
    Regards,
    SL

  • Need info for COPA (Cost based profitability analysis)- Archiving objects

    Hi All,
    SAP have introduced new 2 Archiving objects COPAA_xxxx, and COPAB_xxxx instead of the old archiving object COPA1_xxxx.
    Where xxxx = operating concern.
    Can any one please give the document path how to archive the COPA data.
    Means exactly i want the variant parameters for the 2 new archiving objects.
    Please waiting for your reply...
    Thanks,
    Nagendra

    Hi Chandra sekhar,
    I need to Archive the data in R/3 system & ECC6.0 not in BW system.
    I want the steps how to Archive the 2 objects COPAA_xxxx, COPAB_xxxx in ECC6.0 System.
    Please if have any info please help me...
    Thanks,
    Nagendra

  • COPA : Cost of sales for trading goods

    Dear friends
    We activated cost based accounting and made setting in  "Define Access to Standard Cost Estimates" to transafer standard cost of material to copa. We have to transfer Variable and fixed part of the standard cost to COPA, to two diffrenct Value fields
    And it is woking fine
    But when we sell, any purchased goods (having price control V) system asking for standard cost of the purchased goods. Then we are running Standard cost run for that material and we are able to sell the goods.
    Please speciy the above procedure is correct, any other procedure is available.
    The problem I am facing is suppor today I run standrd cost run for a trading goods and sold the same, today for that material MAP and standard cost is same.
    After some time the MAP of that same material is changed and if we sell the that goods, old standard cost of that material will go to copa
    How to solve this probelm.
    Regards
    Bala

    For the purchased products, you may perhaps use the condition type VPRS to bring in the  material price from the material master.

  • Activating Account based Copa in the existing Cost-based COPA

    Hi Sap CO gurus!
    Please advise me for the following issue.
    Presently, My client using Cost-based COPA for segment wise reporting.( Already activated).
    Now they wanted the reports in Account Based. Is it possible to activate the Account based now? Will the system allow us to activate or not?
    If yes, What will be the implications? I want to know the pros and cons for that.
    If not, How Can I edit the COPA settings( Operating concern)? Or shall I delete the Operating concern and create one new one?
    Can you please explain the impact of each situation?
    Thanks a lot in advance
    Rama

    Hi Joe
    You can deactivate Account Based COPA, but you will have to do a thorough testing so that you are aware of the issues that can crop up
    The IMG Menu is SPRO > Controlling > Prof Analysis
    You will have to do a testing of how the open sales orders would behave... The open sales orders mean Sales Orders where PGI has been done, but billing is pending AS WELL AS Sales orders which are just created, but no Logistics movement (PGI) has taken place... You will have to do testing on both types of sales orders
      - When you do PGI after deactivating the account based COPA, you may face error. Because, COGS GL account is a cost element in Account based COPA, where as in Costing based COPA, it is usually not a Cost Element
      - Also do a billing from an open sales order and see if you get any error there...
    Similar issue can arise during variance settlement also, because the variance account is not a cost ele in Costing Based COPA.
    Test out the above scenarios and do share your experiences
    Regards
    Ajay M

  • Reconciliation of  costing based COPA and account based COPA

    hi experts,
                 I want reconciliation statement of A/c based copa and costing based copa through SAP. we have not configured any account based copa reports. now we are manually doing the reconciliation. Please tell me the configuration.
    Thanks & regards
    jay

    HI
    Costing-based Profitability Analysis is the form of profitability analysis that groups costs and revenues according to value fields and costing-based valuation approaches, both of which you can define yourself. It guarantees you access at all times to a complete, short-term profitability report.
    Account-based Profitability Analysis is a form of profitability analysis organized in accounts and using an account-based valuation approach. The distinguishing characteristic of this form is its use of cost and revenue elements. It provides you with a profitability report that is permanently reconciled with financial accounting
    Regards,
    Vijayanand Sankaran

  • To activate costing based COPA while Account basedCOPA activated previously

    Dear all,
    I have a client which currently using Account-based COPA which activated 5 years ago. Due to requirement to analyse production variance by variance categories, costing-based COPA needs to be activated.
    Can anyone tell me whether is it possible to activate costing-based COPA in a system which have Account based COPA activated 5 years ago. If yes, is there any guiding SAP notes on doing this. As I would like to know the impact of such activations
    Thanks & regards,
    -Alice-

    Dear,
    You can activate costing based COPA, for this use KEA0 and select your operating concern and select costing based COPA.
    Then normal steps are required to be maintained like characteristic and value fields creation and all. Please refer the documents available online.
    Regards,
    Chintan Joshi.

  • BW - COPA extraction requirements for account based and costing based

    Our client has a requirements of having both account based and costing based BW extraction from ECC.
    Is it recommended? if yes, how does it effect BW data model?

    Hi Ali Khan,
    Kindly have a look at below link,
    http://sap.seo-gym.com/copa.pdf
    yes it's possible and it will not affect BW.
    Hope this helps.
    Regards,
    Mani

Maybe you are looking for

  • Can't open pages 3.0 docs with Pages 2.0

    I have Pages 2.02. I am having a person create flyers for me. They are created in Pages 3.0. I am unable to open them. Is this normal, early versions of Pages cannot open later versions. There may be an answer to this but I couldn't find one. It seem

  • Adobe Premiere elements 4 error

    I keep receiving this error message any time I use the edge feather video effect on pictures which on in psd file in adobe premiere elements 4 http://i125.photobucket.com/albums/p64/sapphirecharmed/premiere_error.png This problem just started early t

  • Wired keyboard-number pad&right arrow keys not working-serial # help!

    Hello to whomever reads/replies - I have a wired keyboard for my iMac(it's not the aluminum imac, but the version before it with the keyboard and mouse that came with it). I got this keyboard June 2007 after the original keyboard sent to me had probl

  • Which event is the best one to put JS for HIDING the pages?

    Hello I have developed a interactive form, the back end system is SAP and ERP system. The form is launching on the browser, am hiding 2 & 3 pages of 4 page adobe form, working fine(if popup do not ooccurs, pls. read further), but in some exceptional

  • How to download .sca WAS Java files automatically with MOPZ

    Dear experts, following my title subject, i would like to know how to download .SCA was java files automatically with the Maintenance Optimizer in my solution manager 7.0. (transaction code DSWP or SOLUTION_MANAGER) Currently, i only can download .SA