COPA derivation for thecombination of Cost center and Cost element/GL accou

Hi Gurus,
In COPA derivation using KEDR i am trying to make a derivation for the
combination of Cost center and Cost element. Here i got following problems
• While posting FI document using t.code FB50 system not automatically
updating the fields Cost center and cost element in Profitability
segment. Hence system not posting COPA document. How can i make this
derivation? Is there any note should i apply regarding these.
• How can i create cost element as characteristic.
• If i configure derivation for the combination of Cost center and cost
element will it be posted with copa document for postings or automatic
postings from MM,HR and FI
Pls provide me solution at the earliest.
Thanks and Best regards,
Dhanumjaya.Ranga
Mobile: - 919940093579
Mail : [email protected]

Hi Murali
Thanks for update
I explain my req clearly
For me segment is Distribution channel field (EXPORT and DOMESTIC)
If GL account is 1000-2000     always                      Export
If GL account is 2001-3000    and Cost center is     X then Export.
If GL account is 2001-3000    and Cost center is     Y then Domestic.
Based on above REQ i am making derivation using KEDR T.code.
These postings should work for all modules postings such as MM, HR also.
Actually this should work automatically and after saving the transaction we should have copa document also.
But problem is in source fields of derivation we have GL account (HKONT) and Cost element (KSTAR). I am making derivation using either of these.
But after posting document system not giving COPA document.
I found the reason is  at GL postings we are giving input to GL account (HKONT) but we took in KEDR source field as GL account (SAKNR). GL account (HKONT) is not updating GL account (SAKNR) field in PSEG screen in Fb50. Even i try with cost element (KSTAR), GL account (HKONT) is not updating this in PSEG screen in fb50.
If GL account (HKONT) updates either GL account (SAKNR) or cost element (KSTAR) at the time of posting FB50
Or
If we have the field GL account (HKONT) as source field in KEDR i hope my problem
Get solved.
If you want further info pls give me your mobile number then i ll call you

Similar Messages

  • Report Painter Request - Cost Center and WBS Element

    Hi Everyone,
    Currently, my company settles all project related expenses through to a cost center by way of an internal settlement cost element (category 21).  The issue with this is that when the expense gets to the cost center, they lose all visability as to where the expense originated, such as salaries or travel expense (category 1 cost elements).  We can't switch the settlements to the originating cost element from wbs to cost center just because of the additional data/volume that will cause.  My thought was to create a report painter that can run by cost center but also show the wbs's that settle to that cost center and group the expenses by primary cost element (cat 1).  I'm assuming that there is a way to marry a cost center and wbs element by way of the wbs settlement rule but how would that be done for reporting purposes?  I've seen it done before by way of a nightly job that created sets based on the combination of cost center and wbs but I'm not sure how that was done.  Any advise and examples?
    Example:
    Cost Center:  IT
    WBS: A.0017.01.01 (settles to cost center IT)
    Postings made:
    1.  CC IT and CE 552000 "salaries"..............................$20,000
    2.  WBS A.0017.01.01 and CE 552000 "salaries"........... $5,000
    3.  Settlement of WBS to CC (expenses flow through to CC IT by way of CE 985000)
    I want to run CC IT and see that the account 552000 really shows $25,000 and can be broken down by cost object (CC and WBS by the amounts above)
    Thanks,
    Pete

    Hi Peter,
    I had a similar requirement and used report painter report group 1SHK-002 (in library 1VK).
    I took a copy of the standard and ameneded it slightly, I switched the explode so it occured on the cost center not cost element.
    The report runs so that direct costs on the cost center are shown at primary cost level. And values settled to the cost center are shown on the partner object. In your case i guess WBS Elements (Partner ObjType WBS).
    Now in my case I didnt need cost element breakdown on partner level, just on cost center so effectively I have(sorry for text alignment but I hope you get the idea):
    GL1   .............  100
    GL2   .............  250
    + Cost center1 total ....350
    GL3 .............   50
    GL4 ............. 100
    + Cost center2 total.... 150
    Primary Cost Total ..... 500
    X-YZ-1.200 .............   50
    X-YZ-1.400 ............. 100
    + WBS total ............. 150
    IO 1............. 100
    IO 2  ............. 100
    +IO total  ............. 200
    Partner Total............. 350
    Overall total .............  850.
    Its not exactly like your requirement but it might be a good report for you to work with to get what you need.
    Elaine

  • Cost center and cost center group

    hi,
    how can i create cost center and cost center group?

    hi,
    after u enter in to sap easy access
    goto Extras menu-settings->select display technical names
    you can see the T.codes for each transaction
    for example:create cost center
    accounting>controling->cost center>master data>cost center>individual processing-->KS01-create

  • Cost center and Cost element.

    Hi all,
    I am in an urgent need to understand the relation between cost center and cost element. Please provide me with their individual information as well as the link they share. An existing relationship table between the two, if any, ...then plz mention.
    Thanks & Regards,
    Naresh

    Cost Element: cost element is an individual which carry cost like salaries, wages, power expenses, etc.. These Cost Elements are Two types
    1. Primary Cost Element
    2. Secondary Cost Elements
    Primary Cost Element will carry cost form FI to CO (Cost Centers, Internal Orders, Cost Objects, etc…)
    Seconday Cost Elements carry cost with in CO to different Cost Centers, Internal Orders, Cost Objects, etc…
    Cost Center: Cost Center is an individual which contain collection of costs. For example “Admin is a cost center, it contain costs like Salaries, Power, Rent, Stationary etc,
    With this following report you can retrieve  cost elements given a cost center “controlling – cost center accounting – information systems – reports for cost center accounting – plan/actual comparisons  ”
    Thank you

  • Cost center and cost element display through report painter/writer

    Hi
    Can any one suggest me how to display both cost center and cost element in the output of a report painter.
    Presently --- I am able to display cost center and its cost elements in the same leading coloumn and its periodical values for 16 consecutive col.s.
    Help Needed --- Suggest how to display cost center and cost element in the output of the report along the periodic values.
    Thanks
    Tangudu

    Can any one share some advice on this above query.
    Thanks
    Tangudu

  • Cost Center and Cost Element Hierarchy and Actual Cost Center

    In Bex - Right now I am displaying Cost Center and Cost Element hierarchy with 12 months of data. I want to display the actual Cost center number next to cost element hierarchy - Can I display in Bex?
    Tried to with Structure creating formula variable for Cost Center using replacement path - didn't work. Can you please suggest me how i can achieve this?
    The format should be
    CostCenter H1   CostElement H1   CostCenter   Jan  Feb ...
    Thanks in advance and appreciate for any help...

    Let me explain it clearly and hope it is clear now...
    Designed the report as like this - Cost Center Hierarchy by Cost Element Hierarchy for 12 months of data. But Business agian search in R/3 for actual cost center numbers based on above two hierarchy nodes.
    I am trying to achieve this Bex instead of going back to R/3 - so that they can understand how the dollar amount is summed up on which major cost centers.
    If I remove the hierarchy on Cost Center - it will display all the cost centers. They want to see the Cost center numbers based on CC and CE hierarchy node so that you are displaying only those cost centers. That's the reason I am trying to design the  report with CC Hier, CE hier, Cost Center number and 12 months of data.
    In my data model - have only one Cost Center, if i can create another ZCOSTCENTER same as 0COSTCENTER - May be I can achieve this. still looking for options with out changing the design.

  • CO, which table decribes "cost center" and "cost center group"?

    Hello experts,
    now I have the transaction KP06. Maybe through customizing the user has built a "cost center group" for some "cost center".
    In which table can I find out the relationship between the "cost center" and "cost center group" ?
    Thanks.
    RD
    Edited by: Marching Dai on Jun 16, 2008 2:05 PM

    Hi Arun,
    Please check this link
    http://www.erpgenie.com/abap/tables_fi.htm
    Please check CKPE --->CO-PC Cost Object Hierarchy: Individual Objects
    CSKA Cost Elements (Data Dependent on Chart of Accounts)
    CSKB Cost Elements (Data Dependent on Controlling Area)
    CSKR Resource master record
    CSKS Cost Center Master Data
    Best regards,

  • How do i fetch workcenter ,cost center and cost elem using plant ,material

    Hi.
    i have plant and material in my sleection screen..
    how do i get corresponding workcenter,cost center and coste elements..
    i need to find total quanity(total hours per cost center) in terms of huors corresponding to each costcenter

    Start with VAPMA and then go to VBAP. You can use the information here to go to BSEG if necessary.
    Rob

  • Cost center and cost element in different collumns

    Dear all,
    I developed a report painter where the lead collumn has cost element and cost center. When I run the report it shows at the same collumn the cost centers and in a different line the cost element totalizing the amount of each cost center. So the report shows for each cost element the cost centers posted with this cost element. The report show like below:
    |-------
    Cost center A    | 100
    Coste center B  | 200
    |-------
    Cost element xxx - 300
    The problem is: How can I make the Cost element in a separate column ? Ex:
    Cost element xxx  |  Cost center A  | 100
    Cost element xxx  |  Cost center B  | 200
    Cost element xxx - 300 (In fact I don''t need the total)
    I need cost element and cost centers in different collumns to allow export it for other application..
    Regards

    Hi
    In report painter report we have only one lead column so we cannot have cost centers and cost elements in two different columns.Instead we can use the functionality of variation.Give the cost center in general data selection screen and select the variation functionality.So that cost centers are displayed on the left side of the report as hirearchy and only cost elements are only displayed in lead column.
    Thanks
    Sandesh

  • Table for Cost Center and WBS Element.

    Hi Experts,
    i done the creation of Servcie Contract with account assignment category as Cost Centre "K"  & Project "P". Now i'm trying to take the report for this document.
    Plz help me, in which table the Cost center data and WBS Element data is stored.
    Regards,
    sudhakar

    hi!
    check the table T163K and the field is KNTTP.
    Reward if useful.
    Yuvi.

  • Mass Extension of cost center and cost element validity dates

    Hi SAP Gurus,
    We have around 5000 cost centers and 6000 cost elements for which "Valid to" date is 09/27/2008. We need to extend this date for another 5 years.
    Can you please suggest any pointers as how we can do the mass update.
    We have already tried KS12 which is not of any help.
    Thanks,
    Sreeni.
    1-408-307-7965
    CA, USA.

    Hi,
    Run the LSMW.
    Or Use the fuction automatic creation of Primary/Secondary cost elements in the SPRO.
    Or You can write a program which replaces the valid to date directly in the database table.
    For this you require ABAPER help.
    Regards,
    Edited by: Jagadeesh Sornapudi on Sep 13, 2008 8:25 AM

  • Send cost center and cost center hirarchy to another client

    Hi
    our HR and FI system are in different client, and HR need post document to FI with cost center, but the cost center is from FI client.
    now we want to synchronize cost center from FI to HR, whether  should we use COSMAS message type? whether the hirarchy of cost center group in KSH1 need to be synchronized too? if needed, what is the message type?
    how to trigger the synchronization in FI client if the model in BD64 is setted up?
    Thanks a lot
    shaoming

    Hi,
    We are doing same thing, but not able to send hierarchy to HR system through ALE. Can you please send me the process that you have followed.
    Regards,
    Chandra.

  • Query Cost Center and Cost Element Hierarchy

    here is the problem.
    We are trying to build a query that does the following.
    Its a CCA query.
    We have Costcenter in the Filter area with a Hierarchy assigned and a hierarchy node variable attached.
    We run the report and its looks good and the user cannot drill down because nothing is in the "rows" area. Its perfect.
    Now the user has said that within that Costcenter Hierarchy we only want to see a total number based on the CostElement Hierarachy assigned. Different CostElement Hierarchys are valid for different times of the budget.
    I have created a Hierarchy variable and attached it to the CostElement.
    Here is The issue ****
    If I drop the Costelement in the "rows"area it prompts for the Hierarchy name , filters Costcenter properly and provides the extact number. Problem is the user can now drill down and that is not allowed becuase we are going to have 3 summary totals with a "grand total" at the bottom.
    So if I put the CostElement in the Filter area it now does not filter the CostCenter and I get the wrong number.
    Is there a way to prevent drill down or some how force the CostCenter to be filtered by CostElement also.
    Thanks for any help
    Richard

    Hi Richard,
    Not sure if this will help as I have not tried it out, but you can try by setting the display property of Cost Element to No Display, when it is in the Rows area. This can be done by Cost Element > Right Click > Display As > No Display.
    Hope this helps...

  • How to get the cost center and division for a given FI vendor document...

    Hello Experts,
    I am currently developing a report wherein I have to show the cost center and division used in the given FI document.
    These documents are vendor related transactions.
    In the file that was given to me by the user, she indicated the cost centers used by the FI documents
    but when I view it via VA03 I cannot theere are no cost centers used in all the line items.So are there
    any FM, BAPIs and/or tables that I can use for my requirement?
    Hope you can help me guys. Thank you and take care!

    Hi
    I am not sure on the requirement. You are developing a FI report and accessing VA03 which is sales transaction. Anyway for getting cost center you can go to table VBAK,VBAP for line items.
    Hope solves ur problem
    Thiru

  • KO88 - Error when settling for Cost Center AND Auc for the same Internal Or

    Hi Experts,
    We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
    We did the following:
    1. Created Auc Class
    2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
    3. Created Allocation Structure "CV" with two assignments:
    01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
    02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
    4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
    5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
    6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
    When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
    But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
    1. Assignment 02 is not AUC, is CTR;
    2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
    Did you face any problem like this?
    I cannot find out what is the missing configuration, or if it is a program error...
    Kind Regards
    Mayumi Blak

    Hi Ajay
    I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
    I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
    When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
    The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
    I'm thinking about changing message KD506 to warning, do you know if this can help?
    Kind Regards
    Mayumi Blak

Maybe you are looking for

  • Paste Images Problem

    Hi all, I'm having a problem pasting images from an external application to my java app. The external app uses the Windows clipboard to copy these proprietary images into a format that is not documented, but as I understand it, Windows uses BMP by de

  • Zen Firmware error mess

    Basically my zen keeps coming up with the error message "firmware error", then boots to the recovery mode screen. Ive tried reinstalling the firmware but as it finishes updating it says "update failed". So im kinda stuck and no clue what to do ;[

  • Playlist display on ipod

    I use my ipod to store music for a dance class, therefore under album name I've listed the name of the dance instead. Would like to be able to set up a playlist for each class for the week, but prefer to see the album (dance name) displayed than the

  • Problem starting Photoshop CS5

    Hello When I launch CS5, I get that error: The procedure entry  point ?append@String@ScCore@@QAEXPD@Zcould not be  located in the dynamic link library ScCore.dll I tried to reinstall software, delete preferences... it helps for 1-2 sessions but then

  • Is there a newsgroup reader that works w/ Yosemite?

    I have a new iMac 27 running Yosemite V 10.10.1 and need a newsgroup reader that works w/ this new iMac.  On old Mac Power PC I was using MT Newswatcher but the latest version doesn't work w/ Yosemite.  Any help greatly appreciated.