Copa valuation strategy - doubt

Dear experts,
Pls guide me on the below.
Need to use copa valuation strategy in order to transfer cost to copa through cost componenet wise.
So i have assigned cost component to value field and i m using standard costing key with standard setting.
but need to define valuation strategy material,material type or any other characterstics.
which valuation strategy i will use?.
Which  record type and point of valuation i will use.i am not doing actual costing and material ledger.
What are sequence of step in order to t/f cost to copa through valuation strategy not through vprs.
regards
RR

Hi
a. Select Valuation Strategy 001 in KE4U
In DETAILS tab: Assign it to Appl = KE, Check Mat Cstng, and Qty Field = ABSMG
In Assignment tab: Assigning 001 to Point of valuation 01 and Record Type = F
b. Creating a costing key in KE40
Check : Transfer Std cost estimate
Period indicator =Current Cost estimate acc to entry in mat master
c. assigning costing key to material types in KE4J or KEPC and
d. assigning Cost Comp Structure to Value field in KE4R
br, Ajay M

Similar Messages

  • What it the Tcode for COPA valuation strategy

    Hi,
    Kindly give me the Tcode for COPA valuation strategy
    Thanks
    Sunitha

    Hi
    Check This Tcode
    KE4U. Create a valuation strategy
    Ranga

  • COPA Valuation Strategy Issue

    Hi,
    When posting the Billing document,I am getting Direct Material cost 2 times in COPA line item document in KE24.
    I guess this is beccause problem in Valuation strategy configuration for COPA in the system.Kindly advice me why i am getting Material Costs 2 times,one is From KWMAEK value field,it is getting updated from Stadard  Cost estimate.
    if it is having problem with Valuation Strategy in COPA,kindly advice me what are the necessary settings that i need to make.It  would be a great help for me.
    Why it is taking material cost 2 times,kindly advice me as it is very very critical issue for me.
    I will assgin points
    Thanks
    Sunitha

    Hi Thanks for your  reply.
    System is posting differant amounts one with value field VVMAT material Cost and one with KWMAEK direct material cost.
    Can you suggest me
    Thanks
    Sunitha

  • About Material Cost Estimatite Valuation Strategy

    Material PPC001 have three purchase info record, it's price is 4.27/CNY,3.68/CNYand 2.56/CNY. Price 4.27/CNY and 2.56/CNY have invalid. Material of moving average price is 3.14/CNY. When I create the material cost estimate,in the material valuation, system use moving average price to calculate cost price. But in last month, I create the cost estimate, the material vaulation is use Price form purchase info record. I dont know what the material still has valid price 3.68/CNY, why system use moving average price to calculate cost price? How to work about the material valuation Strategy?
    My material valuation variants priority strategy sequence is 1.Price form Purchasing Info Record,2.Moving Average Price,3.Standard Price in Previous Period.

    Hi Jack,
    This forum is specific to SAP Master Data Management and your query is related to MM I guess. Post your query on below link to get it solved quickly.
    SAP ERP - Logistics Materials Management (SAP MM)
    Regards,
    Jitesh Talreja

  • Material  valuation strategy U in valuation variant

    Dear All,
    We r trying to use the material valuation strategy U in the valuation variant.
    We have also activated the project with the user exit
    COPCP005 : User exit for material valuation (strategy U)
    Component :EXIT_SAPLCK21_002
    INCLUDE ZXCKAU08
    However we r not able to get the desired result.
    Could you please guide.
    Thanks and Regards,
    Anand

    Hi Ram
    During first costing run planned prices entered thru MR 21 will be updated as standard prices.  Which means planned prices = std prices. 
    If you wish to change the prices 6 months down the line = u need to MR 21 upload again and over the earlier planned price.  Then u do costing run again. with this costing run, if there is diff in standard prices, system posts revaluation entry.
    For Raw materials
    Create a simple query which gives u moving avg price, current std price.  Analyze the variances and consider revised prices as planned prices for the next 6 months.  Next, do costing run and system revaluates the inventory values for raw materials. 
    If the situation is that prices of raw materials are highly volatile, do costing run level by level as earlier suggested.
    But give a word of caution to client on how dynamically variances get recorded and revaluation entries get posted.  Also tell them how it impacts not only raw material valuations but also finished and semi finished stock valuations. 
    Pls assign points if the above clarifies your requirement.

  • Costing variant with a valuation strategy

    Hello all,
    I have the following issue:
    In PM I have defined a costing variant with a valuation strategy first u201Cstandard priceu201D and second u201CMoving Average priceu201D, and assigned this costing variant to the plant and order type.
    When I create a PM order (PM01) with a planning plant and enter the components in the order with a different plant and determine the cost, the system determines the correct plan costs based on the Costing variant for planned costs. The planning plant and the plant where the components are reserved are belonging to the same company code.
    When I create the same order with a planning plant and a different plant for component reservation and both plants belong to different company codes and determine the costs, the system doesnu2019t take the Costing variant into account. The costs are determined based on the price control assigned to the material type and not based the valuation strategy. In this case always the moving average price is taken.
    Can anyone help me with this issue?
    Thanks in advance

    Hi
    In OIOF you can specify the valuation variant for plant and order type, system determines the same . for your second case kindly check in the order which valuation variant system has determined.
    regards
    thyagarajan

  • Valuation strategy for Split Valuation.

    Dear SAP Experts,
    We have split valuation for some of the raw materials.
    Whaile running Std Cost estimate system gives following errors even if we have maintained the price under valuation type.
    CK465: No price could be determined
    CK240: Cost component split costed with value of zero
    CK168: Cost estimate for material is Incorrect.
    In Valuation varriant we have strategy 7 & 4 (ie price control as per material master & as per planned price). We dont want maintain any planned price.
    I would like to know is there any Standard Valuation strategy exist in the valuation variant.
    Best Regards
    Nikhil

    If you have maintained price at valuation type level then to consider them you will have to activate mixed costing for costing type and valuation variant you are using in configuration. You will also need to create a qty structure type for this. Once this is done, you will have to maintain procurement alternatives ( T code CK91N - process category BBV) and maintain mixing ratio (CK94). This will ensure correct costing.
    Assign points, if useful.
    Regards
    Rakesh Pawaskar

  • Valuation Strategy for Sales Order Costing

    We are currently using valuated sales order stock in ECC 6.0. The "without valuation strategy field" on the requirements class is not checked. However, the valuation strategy varies for a material and for a sales order. Sometimes it is using valuation strategy 2 - cost from the production order cost estimate - which is desired and other times valuation strategy 3 - cost from the standard price field in the material master - which is not desired. When is the valuation strategy determined for a production order for valuated sales order stock?

    Costing Variant is assigned to Requirement class
    Requirement class is assigned to Requirement type
    Requirement type is assigned to Planning Strategy
    Planning strategy is assigned to strategy groups
    Strategy group is assigned to MRP3 tab in Material Master
    System picks the costing sheet in requirement class
    In this way product will be costed for Make to Order sale order costing.
    Srinivas

  • Material Valuation-Easy Cost Planning Using Valuation Strategy U(Userexit)

    Hi Experts,
    I am implementing a userexit for <b>CJ20N</b> for <b>Valuation Price with Valuation Strategy U: COPCP005</b>, in that i activated the function exit <b>EXIT_SAPLCK21_002</b> and wrote my logic in that, i want to use project wise material price instead standard price which is stored in a Z table.
    For that i need to identify the project ID inside the function exit, i can get it using the input parameter <b>IMP_AUFNR</b> for WBS with Network, for Easy Cost Planning the same exit is triggered but iam not getting the <b>IMP_AUFNR</b> there, so i want to know how to identify the project inside that function exit.
    Could someone suggest me a way to find out the <b>Project ID or description or WBS elemen</b>t inside the function exit.
    Thanks in Advance.
    Regards
    Karthik D

    Not answered....i did it using enhancement point....

  • Valuation strategy 2 rejected by activity valuation

    Dear all,
    I wish to close the PM order.Balance of the PM order is ZERO.
    System displays the error
    Valuation strategy 2 rejected by activity valuation
    Message no. CK295
    Diagnosis
    Price strategy 2 is not allowed for the application.  It is not possible to find average standard rates with an actual cost estimate.
    Kindly suggest any possible solution!
    Thanks and regards,
    Satyajit

    Satyajit,
    I'm fairly sure it just cannot find a rate to use that is valid for the time period in which the posting date falls. Long text of your message says:
    It is not possible to find average standard rates with an actual cost estimate
    Look at KP26 but maybe another transaction. Also check with your CO people.
    -Paul

  • Valuation strategy - costing keys in COPA

    Hello All,
    In Valuation using material cost estimate in COPA, I have defined a new costing key and I want to assign the new costing key to characteristics. Can anyone please let me know the procedure.
    Thank you
    Srinivas

    I got the procedure..
    Srinivas

  • Raw material costing - Valuation strategy with info-rec. "L" - Consignment

    Hi all,
    I want to implement raw material costing for all our raw material.
    I created a new costing variant which use strategy "L"  (price from purchasing info-record).  My sub-strategy is 9 - Effective Price from PO followed by 5 - Effective price from info-record.
    Everything works well except for consignment with vendor.
    I have a raw that is procured from a vendor. The price for the raw is stored in the purchasing info-record and has condition types associated with it. This PIR is of CONSIGNMENT type. However, When costing the raw in CK11N the price for this consignment material is not pulled into the estimate.
    I have seen in note 552486 that "For the valuation with a price from the info record, the system can basically only consider info records with category 'N' (normal) and 'L' (subcontracting). "
    Have any of you come accross this situation? if yes, how did you resolve it?
    Thanks in advance

    Hi,
    any other idea about this ?  I want to use strategy "L" but want to know if I can make it work with consignment.
    Thanks

  • How system determines Valuation strategy in PP order confirmation.

    Hello Experts,
    i have maintained in valuation variant for valuation variant 006 and 007 strategies are 1st  standard price  2nd moving price and 3rd plan price.
    We have maintained two prices in material master one according to price indicator That is V in our case for eg 1000 per ton and other price which is standard price For eg 1200 
    Now while creation of production order my planned price according to valuation variant 006 is picking 1200 for a ton which is perfect  but while doing confirmation and saving my production order system is not picking the strategy defined in 007 which same as 006 and its should pick same 1200 instead of 1000 but not happeninng
    kindly reply as soon as possible
    Regads
    Naveen Chawla

    HI
    The System will take either Standard Price or Variable price but it will not take the values at time even though u maintain both the prices in material master . if its is taking the standard Price than your material may be Semifinshed  or Finished good s
    For Semifinished & Finished Goods --- Standard price is taken into consideration
    For Raw Material - Variable price is taken into consideration ,,,,
    Varable price is not consideration of HALB&Fert as in the the priceses are updated by the variable price inthe raq material when we perform Costing Run ...
    Hope this may help u
    Regards
    Ramanujam

  • COPA Valuation

    I have found out an error in valuation in COPA (due to the +/- Sign in Condition type assignment to Value fields - KE4I) What is the most optimum way of correction of this error.
    Should the billing document be reversed and reposted.
    Or the fi document should be reposted using KE26.
    (in which case i need to modify my pa transfer structure etc)
    Regards,
    Ravi Rana

    Cancel the billing document which will reverse biling and FI. Fix your PA valuation. Then repost the billing document.
    pls assign points if helpful as a way to say thanks.
    Message was edited by: Dave Scarpino

  • CK11N User exit for valuation strategy sequence Price Purchase info records

    Hi,
    When ck11n is executed for a particular material whose purchase order is created then only price from purchase info records is considered. As the sub strategy selected is purchase order price via condition table.
    Requirement: CK11N should consider purchase info record even if there is no purchase order against that material. As the check of valid  agreement is done outside SAP.
    Can anyone sugest a solution ? eg any user exit
    BR,
    Ameya

    Hi
    I lost my notes on this somewhere.... Just to refresh my memory - Can you tell me whats the difference between Net Quotation price, Gross quot Price, eff price from Quotation and Quot price via cond table
    I compiled it actually, but lost it somewhere
    br, Ajay M

Maybe you are looking for

  • Calendar - "This event no longer exists" Cannot see event details

    When I tap an event to see the details, the details view opens and a message that says "This event no longer exists" is shown.  After I click on OK, the calendar returns to day view. My calendar syncs with Google Calendar. To reproduce this:     1)  

  • Problem with multiple users sharing a single library

    We have a family iMac. I am the only one with Admin privileges. I want to share my iTunes music folder with the other users so we don't end up replicating all the MP3 files. I put the music folder in my Public directory and the other users can see it

  • Unable to create Business View in BO 3.1

    Hi All, I have the issue as mentioned below u2022               We are migrating from BusinessObjects XI R2 to BusinessObjects 3.1 u2022     We can open the Business view manager and able to create Data connection, Data foundation, and Business eleme

  • Displaypor​t version and maximum resolution​(s)

    Hi. I'm considering buying a TS140 server for use as a workstation (Software development using multiple virtual machines). I'm also considering buying  a 4k monitor and would like to know if TS140 (70A4) supports 3840 x 2160 resolution at 60Hz. This

  • ALL music files lost on 4G/20 gig iPod today - help?

    Had the iPod since February of this year. No problems. Recently updated to the latest version of iTunes. Everything's updated. Today, went to turn it on and every single file was gone. The menu settings were completely reset. Plug it into the pc and