Hello
Does anybody knows whether it is possible to copy the plan figures for a cost center/group in 2008 to 2009 with a percentage surchage? I know it is possible to copy figures from one year to another via KP97.
Thanks in advance
Best Regards
Søren Kirch

Hi
After copying from year 2008 to 2009 goto TCode KP06 and enter your parameters and then select the line items and then select change values button and enter your revaluation factor say 125% and select revaluate button and then SAVE
Cheers
Srinvias

Similar Messages

  • Automatic plan figures updates at Profit Centre level.

    Hi,
    I would like to know whether do we have any scenario like Automatic Plan figures updates at Profit Centre Accounting level when we do Cost Centre planning.  The Profit Centre should be picked up by the system automatically from the Cost Centre master. 
    Of course, here the Cost Centre to Profit Centre relationship is 1:1. 
    If anybody come across the above required scenario, please let me know how to achieve it.
    Thanks for your inputs well in advance.
    Note: I know we can copy the Cost Centre plan figures to Profit Centre level by using copy function.
    Regards.
    Chandra

    Hi
    In version maintenance, you need to tick integrated planning....
    In PCA, create the doc types for planning and maintain no ranges...
    Also, if you are on New GL and you want to use New GL planning, you need to do settings in new GL menu for the same... assign version to ledger, fiscal year , etc
    last month there were couple of threads on it .. Refer this link for new GL planning settings
    Re: Buget Upload, Planned values-KP06
    Regards
    Ajay M

  • Updating Cost Center Planned figures in FAGLPCP Table

    Hi Friends
    We are in ECC 6.0.  I am doing cost center planning through KP06 t.code and figures and getting updated in GLPCP Table which is a old one.  But in ECC 6.0 version it shoudl get updated in FAGLPCP but not getting updated.
    Can anybody throw some light on this.  Due to this we are not able to fetch the values from FAGLPCP for our z reports.
    Thanks in Advance.
    Brahma

    Your suggestion helped me very much to overcome my problem. Thank you very much. But still I couldn't understand the settings in KPSI,  how those are related to Cost Center Credit. It would be great if you could explain thes three check boxes and their relation to Cost Center
    1. scheduling = 0 reconciling
    2. primary cost not reconciled
    3. activity reference not reconciled
    Edited by: saidarao G on Jun 22, 2011 1:24 PM

  • Integrated Planning - Navigation attribute not shown for Planned figures

    Hello,
    I have created a Input ready query to get the actual figures from previous years and enabling users to enter the planned figures. I have created Planning functions to copy and revaluate.
    Reg   Account    Actual         Planned
    US         123000     $3000         $4000
    US         124200     $5000         $6000
    I have one more report where it shows the Actual & Plan comparision.
    In the Actual & Plan comparision report I have an additional Navigational attribute SIC code to be shown  for each account.
    My Actual & Plan comparision report should ideally be seen like below.
    Reg   Account    SIC  Actual         Planned  
    US         123000      3026         $3000         $4000
    US         124200      4325         $5000         $6000
    But it is showing as below where it has # for Planned figures and it shows blank.
    Reg   Account     SIC   Actual         Planned  
    US         123000      3026         $3000         <blank>
    US         123000      #              <blank>       $4000
    US         124200      4325         $5000          <blank>      
    US         124200      #              <blank>        $6000
    SIC Code is a navigational attribute of account. What changes do I have to do to make the SIC code to be shown for planned figures.
    Any help would be highly appreciated and rewared.
    Regards,
    KK

    I figured it out. I didnt assign the navigation attribute to the plan cube in the multiprovider. Thanks!!
    Edited by: KK on Feb 19, 2008 10:12 PM

  • Transparent Table for Plan Figures

    Hi,
    Can somebody tell me from which table I can get the plan figure entered in KP06, on a per month basis.  I will be creating specs for customized P&L.
    Appreciate any help you can give.
    Thanks,
    Rod

    CSKA ---- Cost element depending on  Chart of accounts
    CSKB----Cost element depending on  Controlling area
    CSKU -- Cost element texts

  • How to copy restricted key figures in query designer ?

    hi,
    i have created a query in query designer (BI 7.0).
    How can i copy existing restricted key figures ? i can't find anything. i always have to create a new one, and then i have to do all the things like 'details of selection' etc.... manually. that CANNOT be, there MUST be a way to copy those key figures.
    any ideas ?
    best regards, Martin

    Hi Martin,
    Restricted key figures can be stored on the infoprovider basis . For which right click on the key figure (left hand side pane ), Select the necessary key figure and assign the restriction through characteristics combination, and give it a restriction and save it . Next tiem when you create query on the same info provider it should appear in the left hand side as readymade reusable piece .
    Hope that helps.
    Regards
    Mr Kapadia

  • How can I copy test plan WITH ITS RESULTS (PASS/FAIL) to other project in MTM??

    How can I copy test plan WITH ITS RESULTS (PASS/FAIL) to other project in MTM??

    Hi odedn,
    Thank you for posting in MSDN forum.
    Based on your issue, you mean that you want to copy the test plan with test results from the current team project
    to other team project, am I right?
    If yes, as far as I know that when we copy test plan with test results to other team proejcts. It is default that
    there just will not copy the test plan with test results (pass/fail) to other team project in MTM.
    You can refer the following MSDN document’s
    what gets cloned, it explained that which objects are copied from the source test plan to the destination test plan.
    Reference:
    http://msdn.microsoft.com/en-us/library/hh543843.aspx
    If you still want to this feature, I suggest you can
    submit this feature request:
    http://visualstudio.uservoice.com/forums/121579-visual-studio. The Visual Studio product team is listening to user voice there. You can send your idea there and people can vote. If
    you submit this suggestion, I hope you could post that link here, I will help you vote it.
    Thanks for your understanding.
    Best Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Copy restricted key figures

    hi,
    how can i copy restricted key figure?
    thanx

    Hello Elif,
    it's not possible because it requires a tecnical name to a restricted or a calculated keyfigure which are cube level. This technical name should be given by you.
    Sarhan.

  • Error during Activity input planning in KP06

    Hi,
    I received two errors while carrying on activity input planning in KP06.
    1) Cost center xxxx has none of the activity types used here (Message: K8102)
    2) Activity type xxxx not planned on any of the cost centers used here (Message: K8103)
    The activity types and cost centres both exist for the planning period.
    Please help me out with a solution.
    Regards,
    Siva Kumar D

    hi,
    Ya i am able to enter values in kp06 after i enter kp26.
    But i could not understand why i need to first maintain kp26 for this. Is there any conceptual understanding behind it?
    In my case, i still clearly do not know the credit side of the cost center. So i will plan for credit side of cost center in kp26 at a later point of time.
    But roughly i know how much activity is going to be as input for this cost center. I will be revaluating it later.
    Even to enter KP26 first, my input and output activities of the cost center are not the same.
    Now i need to enter only kp06. What should i do in this case?
    Regards,
    Siva Kumar D

  • Copy Billing plan from Quation to Sales order at header level

    Dear Gurus,
    I am using custom routine (600) to copy Billing plan from Quotation to Sales Order.
    I used following code to copy Billing plan.
    LOOP AT CFPLT.
    MOVE-CORRESPONDING cfplt TO FPLT.
    CLEAR FPLT-FPLNR.
    FPLT-FPLNR = FPLA-FPLNR.
    MOVE-CORRESPONDING FPLT TO XFPLT.
    XFPLT-UPDKZ = 'I'.
    APPEND XFPLT.
    CLEAR XFPLT.
    ENDLOOP.
    UPD_FPLT = 'I'.
    I also tried with CFPLA instead of CFPLT.
    Using this code all line item Billing plan is coping into header Sales order Billing Plan (Duplicating records). When I save and come back it is giving Express Document error.
    I could not able to save document.
    Please guide me this regards.
    Thanks,
    Vasanth.

    Hello Nag,
    Did you check your copy control routines in transaction VTAA? You need to see if these fields are included in the routines maintained for copy control between your contract and sales order.
    I hope this helps.
    Best regards,
    Ian Kehoe

  • Can you copy Classic Planning Applications?

    Hi,
    Is it possible to take an existing Classic Planning application, and make a copy (or duplicate version) of it? For Essbase applications, this is a simple process in EAS, just right click the application and hit Copy. However, while this method will copy a Planning applicaiton's outline in EAS and nominally show a new application in Enterprise View, it does not actually create another application in the Planning workspace. This makes sense, because the process for creating Planning Applications is not done in EAS. There are two questions I have, and an answer to either would be appreciated. First, is it even possible to make a copy of a Classic Planning Application, in order to allow two different admins to work seperately in two independent applications that both begin with the same dimensions, outline hierarchy, data forms, task lists, user provisions, and initial data set? Second, if it is possible, what is the process, or could someone point me in the direction of where I may find this in guides? Thank you.
    Edited by: user3x3 on Apr 9, 2009 6:55 AM

    Thanks,
    I am a bit confused by what you mean when you say "replace SQL repository". I am not very experienced in this area, I am using SQL Developer to access the RDBMS. Could you explain what the steps are for this? I can find the tables that are created when a new Planning App is made, but I'm not sure what they mean, so the more specific you can be, the more helpful it would be.
    Also, when in Shared Services, I select the artifacts I want to migrate, and then click Define Migration, bringing up the Migration Wizard. However, after I select the source (which is the Old Planning App), I click next to select the target, and the screen goes blank white and seems to be stuck. I can exit out of the screen, but I have let it load for 20 minutes now several times, and it just stays on this blank white screen, like the Migration Wizard has frozen. Any ideas of what might be causing the Migration Wizard to go blank?
    *Additional note:  I am also no longer able to check the Artifacts box for Relational Data in Shared Services for any of my applications, and am not able to open up the Tree to expand it.  The artifacts for Plan Type, Configuration, Global Artifacts etc. can still be selected.
    Edited by: user3x3 on Apr 10, 2009 7:32 AM
    Edited by: user3x3 on Apr 10, 2009 7:33 AM

  • Copy Detailed planning for cost elements in CJ9BS

    hi PS gurus,
    What is the purpose of selecting this option (Copy Detailed planning for cost elements)? What does it do?
    Many ThanKs
    MM

    Hi,
    In case you have done detailed planning for your project you can specify whether you want to copy the detailed planning data using this check box.Planning done using cost elements is called detailed planning in PS. CJR2 is the transaction to do that. For more details you can hit F1 on the field and check.
    Regards,
    Gokul

  • Error while copying the planning version : "S001 001 doesn't exist in P44V"

    Hi Leads,
    I am trying to copy the planning version for S001 (Version - 001), from the Transaction MC8V. But, it is giving error sayin "S001 001 doesn't exist in P44V".
    How can I solve this issue.
    Please do suggest.
    Thanks,
    Sandeep

    Check this thread
    [Re: SOP Confituration- Maintain Copy Profiles version A00 not maintained   |SOP Confituration- Maintain Copy Profiles version A00 not maintained;
    thanks
    G. Lakshmipathi

  • Error While copying the Planning version : S001 001 doesnt exist in P44V

    Hi Leads,
    I am trying to copy the planning version for S001 (Version - 001), from the Transaction MC8V. But, it is giving error sayin "S001 001 doesn't exist in P44V".
    How can I solve this issue.
    Please do suggest.
    Thanks,
    Sandeep

    Check this thread
    [Re: SOP Confituration- Maintain Copy Profiles version A00 not maintained   |SOP Confituration- Maintain Copy Profiles version A00 not maintained;
    thanks
    G. Lakshmipathi

  • Planned Figures in COPA Reports

    Hi,
    While we are able to capture the actual figures in the COPA Reports, we desire to key in the planned figures also in the COPA for comparing the actual with plan.. What are the relevant value fields for the same and how do we maintain the characteristics for entering the planned figures in COPA.
    Would appreciate assistance in this regard.
    Thanks in advance.
    Rgds

    Hi Ashok,
    Thanks for the feedback, Would you explain a bit more as to how to create the Transfer Structure. Or else if there is a documentation would you be able to pass on the same to me.
    Thanks in advance.
    Rgds

Maybe you are looking for

  • Restore programs and files after a restore to facory settings

    When I suspected my hard drive was failing I tried recovery to factory settings, and when asked if I wanted a backup I agreed and after many hours, a backup was made and a restore to factory settings was done. I recovered the backup to my desktop, bu

  • Is there or will there be a way to draw accurate measured lines and curves in Line?

    I am very excited about the new Line app and Ink & Slider; however it would be far more useful for me and many others to be able to measure line length, angles, curves, radii, etc.  Will this function be introduced in the future? This functionality w

  • FF_5 Statement Upload Error

    Dear Expert, i try to upload the MT940 bank statement in FF_5, i am getting the following message on one particular date only. kindly plese check and is ther any configuration or master date to be update in the EBS. Account 400039002       0025290890

  • Sorting the mails in mailboxes all at once

    I need to know if there is a way to arrange all the mails from folders in the same time. I have to many mailboxes to start sorting each one of them. Please help!

  • Is LabVIEW able to create ActiveX Object for other sw to use?

    I would like to create some ActiveX object from LabVIEW that VB could use it. How do I do it? I only find info about labVIEW use ActiveX created by other SW. Please let me know if LabVIEW has such ability. Thanks.