Copy of Storage bin while creating Material master
Hi,
When I am creating a material master by coping a existing Material Master (which has WM view and Storage bin maintained), system does not copy the same Storage bin to the material which is getting created
All the informations are copied except the Storage bin,
We need this for some business reason
Is this possible
Hi,
We are creating the Material master copying exisiting material for Plant --> Warehouse --> Storage type
Similar Messages
-
Error Message no. MM214 while creating material master
Hi folks!!
While creating material master, when i fill the MRP controller field and press enter, I get the message...
The MRP controller 391 does not exist for plant
Message no. MM214
I have checked, the MRP controller is availble in Master Data for MRP Controller. And we have already created many material master with this MRP Controller.
What could be the possible cause for this error. Please help.
Best regardsHi Qamar,
Please go thru the bellow threads,
Assignement of MRP controller to Plant
MRP CONTROLLER
MRP Controller
Re: MRP controller extension from plant 1 to plant 2
Thanks,
Swamy H P -
Runtime error while creating material master data
hello sir,
i am facing one prolem while creating MATERIAL MASTER DATA.
AFTER GIVING ALL REQUIRED INFORMATION WHEN I AM GOING TO SAVE THE DOCUMENT ITS SHOWING ABAP RUNTIME ERROR.
MESSAGE TYPE: - MDS_KEYMAP.
MESSAGE CLASS: 001.
PLEASE TELL ME WHAT TO DO?
REGARDS..SIR THANK YOU FOR YOUR REPLY.
I ALREADY DONE THAT DUMP ANALYSIS.
SO PLEASE KINDLY GIVE ME IN DETAILS ABOUT THAT SOLUTION... -
'Storage bin field in material master
Can we increase character length of 'Storage Bin' field in material master so that bin details can be accomodated ?
No you cant!
Takehelp of some other field.(text field)
Edited by: uttkarsh agrawal on Jan 30, 2009 3:11 PM -
I want validation while creating material master with profit center
Dear Experts,
I want validation while creating material master with profit center.
If 0001 plant having 100100 profit center
0002 plant having 200200 profit center
Material A cant be created for 0001 plant for with wrong profit center 200200.
Kindly help & provide me solution clearlyHi,
Profit centers are assigned to controlling areas. And controlling areas can have many plants under them. So as long as both the plants and profit centers are in the same controlling area users will be able to extend the materials.
You should put in your validation control in the material master user exit. One of the exits you can use is
MGA00001 Material Master (Industry): Checks and Enhancements
Thanks & regards
Hameed Parvez -
MG144 Error Messages while creating Material Master
Hi,
When creating Material Master getting Error for structure field is required. Message Number MG144.
Pls suggest.
Regards,
VRGo through this note 45998
Or check, which field is required field and try to maintain or just make the optional entry in customizing -
10 digit code need to be created while creating material master
Hi, Please advise how to create a 10 digit code automatically when we create material master in SAP? Please note that this code is required as one of the basic data view fields, not as material code. Is there any enhancements available for the same.
Dear
Try to use Product Hierarchy field MARA-PRDHA in the Material Master for this purpose
Regards
JH -
Update Termination while creating Material Master MM01
Hello,
While creating the Material Master system is throwing the error Update was Terminated.
Before that we have client copied.
Can anybody throw some light??
Regards,
Kumar RayuduHi,
Check the material number ranges are copied ?
in SPRO>LOGISTICS GENERAL>MAT.MASTER>BASIC SETTING>NUMBER RANGES FOR MAETRIAL TYPES
BR
Diwakar -
Error while creating material master
hi,
I'm getting this error message when I'm creating a material master in a specific plant/sloc. I'm probably guessing its in config. I really need some help here.
"Tables TCURM and T001W inconsistent; notify your system administrator" .
could any one draw some light on this.
thanks regards,
chintathis is not application server specific problem.
Suggest you to go to [Logistic/MM forum|SAP ERP - Logistics Materials Management (SAP MM);.
regards,
Vincent -
Problem while creating Material Master (MM01)
Gurus,
I am novice to sap sd, and I am trying to create a Material (MM01) for a Customer, and have given the inputs 'Material', 'Industry sector' etc.
To my surprise, I am unable to see ' 'Sales org 1' , 'Sales org 2' ' Sales : General plant' tabs .
Should I need to enable something to view these tabs ?
All I could view is 'Organizational levels' ' check screen data' ' Additional data'
Kindly bare for this silly question!
Thanks,
KarthikHi,
Try to create a Material in this way. Check whether you are using same steps.
Go to MM01
Enter Industry sector & Material type (Eg: FERT - Finished Products)
Click on "Select view(s)" button option without pressing Enter key directly.
Then you should be able to see all tabs listed in "Select view(s)" pop up window.
Check whether "View selection only on request" tick box is marked. If it's marked, Un-tick it. If you have marked that, then this screen will not automatically appear.
Highlight relevant tabs.
Press "Organizational-levels" button in that pop up.
Enter relevant Sales Org/ DC & Division.
If "IOrg. Ievels/profiles only on request" is marked, then Un-tick that also. Its for same purpose as above.
Press Enter.
Now check whether you get those tabs in the Material Master.
Best regards,
Anupa -
Multiple storage bin for single material
Hi,
We wanted to assign multiple storage bins in the material master as the material is stored in mutilple storage bin in the same storage location. We are not using WM.
We want to resolve the issue without implementing WM.
Please advice where and how do we maintain the same.
In plant data / stor 1 view there is a provision for maintaining only one storage bin.
Thanks,
Reddyit is not possible without WM.
As workaround :
You either create for each storage bin a storage location,
or
you active batch management and let the batch work as bin. -
Duplication in part numbers should not accepted while creating material ma
Hi all,
How can i set Duplication in part numbers should not accepted while creating material master. How can do this requirment plz help me.
thanks
rameshhi,
please check is there any user exit or BADI available and make use of it. -
Error while creating Materialized View step 3 of 6 using wizard
have oracle 9i Rel 1 on Windows 2000 server. Master Site has been setup. Database links are created at Materialized view site. But while creating Materialized View Group using wizard there is following error on step 3 of 6.
Statement:----------------
/*OracleOEM*/ SELECT 1 FROM SYS.dba_constraints@masterdbname WHERE OWNER='username' and table_name='tabname' AND constraint_type='P'
Stack Trace:----------------
ORA-00942: table or view does not exist.
ORA-02063: preceding line from masterdbname.
All parameters for replication are correct.
Please help me early.
ThanksHello,
In the masterdbname, logging as sys user, you must grant select permission on sys.dba_constraints view to mvadmin_dbname user (where dbname is the replicated database name).
Regards, -
Error while creating Materialized View step 3 of 6
I have oracle 9i Rel 1 on Windows 2000 server. Master Site has been setup. Database links are created at Materialized view site. But while creating Materialized View Group there is following error on step 3 of 6.
Statement:----------------
/*OracleOEM*/ SELECT 1 FROM SYS.dba_constraints@masterdbname WHERE OWNER='username' and table_name='tabname' AND constraint_type='P'
Stack Trace:----------------
ORA-00942: table or view does not exist.
ORA-02063: preceding line from masterdbname.
All parameters for replication are correct.
Please help me early.
ThanksHello,
In the masterdbname, logging as sys user, you must grant select permission on sys.dba_constraints view to mvadmin_dbname user (where dbname is the replicated database name).
Regards, -
Error message AA119 while creating asset master through AS01
Hi
while creating asset master (AS01), i am getting following error:-
Depreciation key M003 not allowed (Check your entry)
Message no. AA119
Diagnosis
Depreciation key M003 is not defined.
System Response
Processing is terminated.
Procedure
You have the following choices:
Use a defined depreciation key (use input help).
Define a depreciation key in Customizing ("change" pushbutton) and activate the key.
I have done following in configuration:-
1) No change in base method
2) copied multi level method from standard key "011" to "M03" and maintain vlaue as - Acquisiton year - 9999, Years - 999, Validity period in month - 12, Base value key as - 01and depreciation % as 10
3) No change in Period Control Methods
4) Copied standard depreciation key "GL20" as "M003" and maintain the multilevel method as "M03"
5) save the configuration
6) Activate the depreciation key by selecting depreciation key and clicking on Activate button on top of the screen
7) Import the configuration
now while creating asset, depreciation key M003 is appearing in drop down list but getting above error. but if I tried with depreciation key GL20 (which is standard depreciation key) system accepting the input
In target client, depreciation key display in Active stage.
please revert if anybody has any clue to come out from above problem.
Regards
DDDear All Foram members
Thanks for your response.
I got the solution and now problem has been resolve.
Initially i have maintain Scrap Value as Default Value from Company code and Depreciation Area in Depreciation Key (AFAMA) and I was getting the error. But now I have change the Scrap Value as CutOff Value is ignore and problem gets resolve.
But still do not understand the relation between the erro and Scrap Value assignment. Any Idia. It will be helpful for other members also.
Thanks Pankaj, Madhu and Paul...........
Regards
DD
Maybe you are looking for
-
Plz any one convert this code from AS2 to AS3???????reoly me on [email protected] #initclip function Dot() { this.color = new Color(this); this.color.setRGB(16775372); this._rotation = 150; /////////////////rotate o
-
Stored Procedure that creates a trigger on new tables
I am trying to create a stored procedure that creates a trigger on new tables whenever the table is created. The procedure should receive the new project table's name, and then create a dml trigger on that procedure. When the procedure is run, I ge
-
Still on track for EoM July? re: timeline for v6...
could anyone comment on the v6 release? I see test files were posted on 16-July. timeline still this week or ? will it be iso d/l from CCO vs. physical media, etc. thanks, Rob.
-
Apps panel does not appear, "Install Adobe Apps" not working
Hi, I would like to download Photoshop CC (first the trial version) but after downloading Creatice Cloud Desktop, the Apps panel does not appear at all. If I click on the "install adobe apps" tab nothing happens. I have tried everything that was writ
-
Can i change the Domain membership of Vcenter server 6.0 ??
Hello All, We have VCenter server 6.0 and we have joined the server to On-premise AD , call it as X.com Also we have our cloud set-up and most of the applications are running on it , we have an AD in cloud, call it as Y.com, we are planning to dec