Copy Production Area Planned Orders to a corresponding processing plant

Hi All,
   I am in need of design a dialog program which copy production area planned orders to a corresponding processing plant, In my requirement i am not able to find what are the tables involved and what is the bapi must be used to update the tables.
  I appreciate if anyone come with tips to start with this requirement.
Thanks and Regards,
Babu

Hi folks,
      Thanks for the prompt reply, i have one basic doubt, whether the order no must be passed by us, if i am not giving order no it will returns the error.
Thanks and Regards
babu

Similar Messages

  • How Can i Calculate The shortages against production or planned Order

    Dear All
    how can i get the shortages against production or plan order .
    condition is Egg.----ITEM  <b>X (available qty is 6000)</b>is using for three assembly .A,B,C
    I have created one order For <b>A--5000 qty</b>. At this time <b></b> item x is reserve for Order Created Of A.
    Now i have created one another order for<b> B--4000 qty</b>. then it would showing the shortage of  3000 Qty.
    And same Order of <b>C Qty 5000</b> Material x would be showing the shortage
    5000.
    <b>Bcoz Shortage of 3000 is for B And Now i want only Shortage Of C.</b>
    How can this procedure done.
    Rgds
    Pankaj Agarwal

    Hi Prasobh
    Don't mind
    Points is not so major issue for me.Till i m not getting right answer or near by sothat i cant concentrate on point .almost all answer was clarify by me already . then if i cant get the right solution then  i will take help from experts like u.nothing more.and  point of view we have already touched with this community and i have given points more of them.so don't mind . take it as a challenge definitely u will get superior point from me.
    Rgds
    Pankaj Agarwal

  • Table name for work centers with production or planned orders

    dear gurus,
    can you please help me on what table names have the work centers with planned or production order

    For production Order
    1.AUFNR ---> AFKO ---> AFKO-PLAF
    2.AFKO-PLAF --> AFVC -
    >  for respective VORNR get AFVC-ARBID
    3.AFVC-ARBID --> pass as  OBJID into ---> CRHD --->ARBPL (Work Center)
    For planned orders
    1.PLNUM ---> PLAF ---> PLAF-BEDID
    2.PLAF-BEDID -
    > KBKO ---> PLAF-PLNNR, PLAF-PLNAL
    3.PLAF-PLNNR, PLAF-PLNAL -
    > PLPO -
    > for corresponding VORNR (Operation number) get ARBID pass as OBJID ---> CRHD --> ARBPL (Work Center).
    Regards
    soundar
    Edited by: Soundar on May 29, 2008 9:18 AM

  • Modeling dummy product and planned orders

    Hi SAP Gurus,
    I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
    I am modeling subcontracting requirement and i need to create following master data.
    All the below products are at plant P.
    P has the components as Q_D
    Q_D has the components as Q
    Q has the components as R
    Where Q_D is the dummy product produced at plant P.
    P and Q are subcontracted items to the vendor V.
    P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
    When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
    Please advise.
    Thanks.
    Jagadeesh

    Hi senthil,
    Check if the forecast date is beyond PPDS horizon.
    Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
    Bye.
    Nitin

  • Production and planned order not scheduling

    Dear Experts,
    Created new plant ,scheduling parameters,order type parameters ,confirmation parameters.
    Scheduling parameters: Detailed Scheduling ,Forward etc.
    created BOM, Routing,WC.
    Maintained Work center Scheduling Tab formulas entered,Routing Machine,setup time entered.
    System showing at the of creating production order Scheduling Start time and end time is same.
    scheduling not done in production order.
    Anyone explain process for scheduling
    Regards,
    Naresh Reddy.

    Hi Naresh,
               The problem is mainly due to the work center scheduling formulas only. Maintain the scheduling formulas as SAP001 for setup and SAP002 for machine. In OPU3 check the automatic scheduling check box, adjust dates as 'adjust basic dates , adjust basic requirements to operation date' and recreate the production order.
    Let me know if u are still facing the same problem after doing these settings.
    Regards,
    Krishna Chandra

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • The FM to copy the simulated planned order to operative planning

    Hi Gurus,
    Is there a function module which can copy the long-term planing results (Simulated Planned Orders) to the operative planning environment and create a PR, like MD43?
    I found the FM MD_COPY_PLAF_LTP. But it seems too complex to be pratical. Or I just simply create the PR by reading the planned order data?
    Thank you.
    Regards,
    Felix

    Hi, I have the same requirement with you.
    Did you find the solution? Could you please share with me
    thank you.
    Huang

  • Mandatory production version planned orders

    Is it possible to block the launch of a planned order that does not contain a production version?

    Hi
    If you want block the field in order to prevent the user from inputting any values, you can also use the standard variant which can be created via transaction SHD0, this provides very filexible functionality what you want.
    Steps.
    1. Go to SHD0
    2. Input the transaction code
    3. Click the tab 'Standard variant'
    4. Input the name of variant. e.g. Z123....please start with Z.
    5. Click 'Create ' button F5.
    5. Then the system will bring you to the transaction, please set the version as blank.
    6. In the coming popup, please tick the check box 'W.content' in the
       line for 'Production version'. if you hope protect this field you can also tick the 'Output only'.
    7. Exit the transaction and save the variant.
    8. Activate the stanard variant in SHD0, please note that this will be
       valid for all users.
       You can also control other transactions this way in SHD0 by creating
       variants for them.
    Best Regards.
    Leon.

  • Plan Order Conversation in to Process Order and Plan Order in Back Dates

    HII
    we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
    2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
    Regards
    Ahmed

    Dear
    Problem No 1 : we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
    Answer :
    1.Please check the OPPR -Plant and MRP group -Select Order Type Button -Check what Order Type you have assinged here ( PI01( May be the default Process Order Type )
    2.If you are maintaing MRP group ( 0001 or 0002) , did you asisng the same in MRP1 view ?? because
    3.Did you maintain the similar Order type in OPKP -Define Production Scheduling Profile ? -This has highest priority .
    4.Did you maintain correct order type in OPJH-Maintain Order Type ??
    Refer the expert comments on the same issue : Strategy group to define production order type
    Problem No 2: 2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
    Answer : You can plan the order in back dated , if you maitain Satrt date in the Past optiuon in OPU3/OPU5-Define Scheduling parameters .Goto OPU3 -Select the Order Type -Double click -Maintain 90-60 days in the Start Date in the past in Scheduling Control and Details scheduling tab .
    Hope it helps
    regards
    JH

  • Restriction of planned order generation (mrp)in other plant.

    Hi,
      I am running mrp for sales orders and i want to restrict the planned order generation in other plants other than the sales order plant. 
    through standard activity it can be blocked by not maintaining special procurement key of stock transfer.
    But some users are creating manual demand in other plant(STPO) against the same sales order for some sub assembly. so if they are running MD02 in their plant it is creating planned orders against the same sales order.
    I want to restrict the planned order generation against any sales order in other plants. How it can be done.any enhancement please suggest.
    Regards
    Madan

    Hi,
          we cannot restrict the authorizations so specifically here in my business client.
    Based on planned orders we have defined some programs.
    the programs are  effecting because of these unwanted planned orders which have been created  for a different plant sales orders.
    Is there any enhancement or BADI to control the creation of planned orders in other plant for a sales order of different plant.
    please suggest.
    Regrds
    Madan

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • What are the ways to Copy Firm Planned Order from one ASCP Plan to another?

    We run two EDD Plans with very similar options, but with different plan horizons.
    To have the suggestions synchronized, we need to copy the "Firm Planned Orders" from one plan to another.
    We tried inserting the records in MSC_ST_SUPPLIES with Order type 5 and firm planned type 1 with appropriate plan id, but Planning ODS Load is not considering those inserted records.
    We don't want to insert directly into MSC_SUPPLIES.
    Any inputs is appreciated.
    Thanks
    Sundar

    You can also call a custom DTSX package in SSIS via the datamanager.
    there are at least 5 ways of transfering data in BPC between apps.
    1. Through the front end (excel etc) via evdre/evsnds
    2. Through Script logic using *Dest App
    3. Using BPC's standard export dtsx package via DM
    4. Using SSIS using BPC's custom SSIS tasks
    5. Through Script logic using stored procs.
    i am sure people will come up with more.
    remember if you use ssis and move data into any table but the wb, you need to process the cube afterwards.

  • How to see planned orders for P3 mrp type products in APO?

    Dear experts,
    I have materials with P3 MRP type (not planned in APO but in R/3 using MRP)
    I have active integration models with P3 and X0 mrp type products for planned orders
    however I can not see in APO product view the planned orders for P3 materials,
    is this normal or should I see those planned orders in APO?
    Thanks for your answer,
    best regards
    Elynn

    Hi,
    The following prerequisites must be met so that planned orders can be transferred from SAP R/3 to SAP APO
    and vice versa:
    1.The material masters must be transferred to SAP APO.
    2. PPMs must exist for planning in SAP APO.
    3. The relevant integration models must be active.
    4. An active integration model for planned orders must exist in SAP R/3.
    5.An active integration model must also exist for materials, so that the components of the planned order are transferred.
    6.The relevant distribution definitions must be maintained in SAP APO, so that planning results can be
       transferred from SAP APO to SAP R/3.
    Thanks,
    nandha

  • Function with production/planned orders of a work center or capacity

    Hi,
    does anybody know if a function exists which we could use in a tailor made report, which will list all production and planned orders for a given work center or capacity ?  The aim should be to create a report which is more or less equal to the capacity evaluation overviews in CM01-CM07, but then in ALV and with customer specific fields in it.
    Many thanks for any valuable feedback !
    Kristof Wylin.

    Will be done in another way.  Orders will be collected via KBED.

  • Number Range for production order / Planned order

    Number Range for production order / Planned order depends upon what?
    Plant, order type, mrp controller??

    Dear,
    Number Range for production order :- Client Specific assign to the order type You can check in CO82 and OPJH.
    Planned order  :- Plant specific OPPQ or OMI2.  Number ranges for Manual creation - OMI3
    Hope clear to you.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Can anyone confirm if/why the finger gesture for zoom stopped working for 3D content in reader XI ?

    I use 3DPDF to demonstrate products all the time on my touch screen tablet (win 7 64) When I upgraded to reader XI, one key feature stopped working. This is the Zoom gesture (spreading fingers closer together or further apart to zoom out/in). I thoug

  • Apple TV audio through interface and monitor speakers?

    Hi all, See following pic of my setup... My question is as follows.... When Macbook is linked to tv via airplay, which is my normal setup as I produce music and use both screens, the sound output is set through Saffire audio interface and comes out t

  • Ios 8.3 losing clipboard information

    Since updating to ios 8.3, my clipboard data doesn't seem to stick around.  Almost like theres a timeout.  This is annoying because I use it for inserting the same bit of text quite often. Not a signature, but actually during a login for a game app..

  • Exchange 2010 report not working

    Hi all, I'm trying to compose a mailbox size report for Exchange 2010. The output is to an html file that is automatically emailed to whoever I wish it to be. The functionality works GREAT, but the report is outputting no data. Can someone tell me wh

  • Dynamic Parameter Batch Size in InfoView

    How do I increase the size of the batches used during prompting for a dynamic parameter?  I am wanting to increase the batch size to a number that will actually allow me to get rid of the "batch" functionality on dynamic parameters.  I am using Cryst