Copy Purchase Requisition - Material Short Text

When creating a new purchase requisition by copying an existing purchase requisition using the document overview in ME51N, the material short text is always copied from material master (makt-MAKTX) instead of the line item (eban-TXZ01) from the source purchase requisition.
Is there a way to set up copy control for short texts as there is for long texts ?
using ECC 6.0
thanks in advance

Hello Thomas,
Unfortunately no, when you copy the PR from another PR the System redetermined some  fields from the material master,these fields are :
Planned Delivery Time,
Unit of Measure,
Material Short Text  
Goods Receipt Processing Time,
Material Category,
MRP Controller...
This system behaviour is intended since many companies more often change the data in the material master rather than copying a purchase requisition that contains changed material data.
Regards,
Mauro

Similar Messages

  • Copying Purchase requisition header text  to Purchase order.

    Hi Experts,
    Can you suggest me a way to copy purchase requisition header text  to purchase order?
    Best Regards,
    Shailendra

    Hi
    PR header text cannot be copied to PO ....... its std SAP .... reason being many PR can be copied to same PO .... so how to decide which PR header text to be copied to the PO ....  ???

  • Copy purchase requisition with me51n

    Hi,
    I have a problem when I want copy a purchase requisition in me51n.
    I have two documents types in specific and I use a variant of transaction who fixed the document type.
    I execute me51N
    I search a purchase requisition with other types.
    I do a drag & drop to copy the purchase requisition.
    But in the first copy, there is a document type present on header level was copied and in the second copy it is a document type comes from reference that is copied.
    I want for the first copy, the document type comes from reference in the copy.
    What am I doing ?
    Thanks.

    in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
    are several steps necessary.
    When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
    the Purchase Requisition will be automatically inserted into the table EPRTRANS.
    But not in case of if you create a Purchase Requisition without a Material-Numnber.
    e.g. Purchase Requisition with free text and account assignment.
    Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
    into table EPRTRANS.
    I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
    It trnasfers all Purchase Requisition from EPRTTANS to the external system.
    I hope it clarifys some of the confusion .
    regds
    ertas

  • Making material short text grade out while creating PR

    dear all
    while making pr for materials,by t-code me51n, the system does not make the material short text diable/grade out.
    eg if i select material from material master say material code 1000055-----& short text is --cement 53 grade.
    then at the time of creating pr i can change the short text cement 53 grade to any off my choice.
    logically this should not happend, as then their will not be any trace of PR in system.
    pls let me know how to come out of this problems.
    as we want that when ever we select the material from MM master, the system should make the short text grade out while creating the PR, so that further complication can be avoided.
    thanks in adv
    regards
    pairkshit

    hi manohar
    this process does not work. beacause with this process the system disable the entire coloumn of short text in ME51N.
    which is not our requirement.
    the system should only grade out the material short text cell while we create the PR for material, so that one could not able to change the material short text which has come from MM master
    is their any other solution for this.
    regards
    parikshit

  • Updating purchase infor record short text (EINE-TXZ01)

    Hi all,
    I am creating a purchase info record through BDC where i have to update the purchase info record short text manually(CREATE_TEXT Function module) with some default values'XXXX'.
    Can any one provide me some information how to achieve that??
    Thanks

    Hi,
    you can use screen fields in BDC to update short text. you need CREATE_TEXT or SAVE_TEXT function module to update long text. Transaction may any. You have to pass some parameter to update long text.First try to use READ_TEXT to get existing text for practice.You will get some idea of long text, then create your own long text for any transaction

  • Copy Purchase Requisition Header Text to Purchase Order

    Hello!
    I will like to copy the Header text of the Purchase Requisition to the Purchase Order.
    I have read that SAP does not allow to copy it to the Header Text of the PO but it allow to copy it to the Item text of the PO.
    Can you give some hint on how to do this.
    Thanks.
    Regards,

    Hi
    You can't copy the header text of PR to PO header
    because Sometimes you need to convert different PRs to one PO.So each PR will have different header text, how the system will identify in PO header text.
    So whatever the item text you maintained for PR will be copied to item text of PO if you create the PO with respect to PR.
    So for this reason SAP has not provided the option for link the PR header text to PO header text.
    Hope you understand,
    rgds
    Chidanand

  • Reg Workflow Copy while copying Purchase Requisition to different user ID

    Hello Guru's,
    Will anyone suggest me, i have copied a purchase requisition from user D1 to user ID2.  Once it has copied to ID2 it should work as per the workflow which is assigned to ID2.  But it is taking *ID1 workflow* is there any way to stop it and assign it to ID2 workflow. Will anyone guide me.
    <REMOVED BY MODERATOR>
    Edited by: Alvaro Tejada Galindo on Apr 22, 2008 12:57 PM

    Hi Ram
    In SWI5 transaction, check whether a work item has got generated for director and VP or not.....
    You will find the work items in SAP Inbox if system has generated a work item for director or VP....
    That will narrow your analysis
    Regards
    Virender Singh

  • Purchase order history short text

    hi,
    may i know where i can get the short text at first column in purchase order history tab in me23n.
    for example DCGR, GR, DCIn, etc...
    thanks

    Hi
    Check in IMG - MM - purchasing - Statistics - purchase order history categories. Here you can find PO history details.
    Thanks

  • Material short text difference

    Hi Gurus,
    my client has created a Po having 2 line items with the same material no. (packing material)
    the short text of the material is differ for the one line item.the confusion is how it will happens coz.. the material code is same for the both line items.it should be the same.
    I checked in the item changes of the Po.. but no data is appearing regarding the short text changes
    please help me how to find out the route cause of the issue..
    regards
    subbu

    Hi,
    It is possible to change the Material Description while creating PO (ME21N), which will not get recorded as changes for that document. User might have changed during PO creation (in ME21N).
    Or check whether 2nd line item has been added later in PO, in change mode and check Material master changes in MM04. It might also happen that before adding 2nd line item in PO, somebody would have chnaged material description in MM02.

  • Purchase requisition material price

    Hi all
    My understanding is that the valuation price of a material (In my case MAP) is defaulted into the purchase requisition valuation price.
    I have a bit of a funny scenario here. 
    I have a plant WB00 (requesting plant - no stock is kept in this plant) (we manually update the MAP for release purpose on the PREQ)
    I have another plant (SWB0) (Supplying plant - this plant holds stock and seen as vendor.  Requsting plant will create order against this plant).
    I have now activated Split Valuation on plant SWB0.
    I have the following
    Material 1 - SWB0 - Val Type "" - R200
    Material 1 - SWB0 - Val Type New - R300
    Material 1 - SWB0 - Val Type Reclaim - R100
    Material 1 is in Plant SWB0 and Sloc WB52.
    On Plant WB00 there is no Split valuation.
    In the account view of Material 1 in plant WB00, the MAP price is R300.
    When I create the PReq for this material and enter the plant WB00, the price comes as R300.
    However when I put in the Sloc WB52 o nthe preq, it then changes the price on to R200.
    I require it to stay at R300.  What could I be doing wrong.
    Thanks

    Thanks
    But as you will see, that is not happening.
    The MAP price on plant WB00 is R300.
    When I create the purchase requisition it initially has R300, but when I populate the sloc, it changes the price to R200. I cannot understand why.
    R200 is the average price on plant SWB0, and Plant SWB0, SLOC WB52, is the supplying plant for the material.
    It seems to be taking the price from there, which is WRONG.
    WB00 should be independant?

  • ME59n exit/BADI to copy purchase requisition custom field to purchase order

    I have added a custom field (Unloading Point) in the Purchase requisition customer screen. Now When a purchase order is created from the purchase requisition through t-code ME59N, I need to copy the unloading point value from the PR to Unloading Point in the shipping tab of the Purchase Order. Whch User-exit/BADI can be used for this purpose. <removed by moderator>
    Edited by: Thomas Zloch on Nov 23, 2010 12:44 PM - please do not offer ...

    Good you found out what was the answer. Please share your solution, that sort of the idea of a forum like this.........

  • MATERIAL & SHORT TEXT

    Sir,
    i am facing a issue when we put material code & enter it it will pull data from material master.
    but when you just put material code and dont enter it and write any short text it will not take from masters.
    i want to restrict this
    ply help

    hi,
    > I strongly recommed you to not to change the field settings for the requirement....Because if you this, then you may face problem in near by future...
    > For eg:
    > If you wanna do procuement for consumables, then its necessary to use this field...at that time to can > face a problem...
    For your requirement, i think you shd take the help of ABAP consultant...
    This is because, you can ask the ABAP consultant to make the new field to enter the general text for the normal standard PO and even when you press enter this field will not affect...and don't make the above field as display...
    Regards
    Priyanka.P
    hi Diptasya,
    I think for consumable PO ie. with account assignment catagory, we can NB document type and Do use NBF indirectly i suppose....
    Make me correct if anything wrong...
    Regards
    Priyanka.P
    Edited by: Priyanka Paltanwale on Apr 21, 2009 10:53 AM

  • Passing text information from sales order to purchase requisition

    Hi
    My requirement is in third party processing. I want to pass line time text in sales order to the purchase requisition created in a third party processing.
    My question : is it possible in standard config setting?
    If not, Is there any user exit to address this
    please send us valuable inputs
    Thanks
    Sriram.

    Dear Sriram,
    Try this,
    Go through this IMG path do the required settings
    SPRO>IMG>Material Management>Purchasing>Purchase Requisition-->Texts for Purchase Requisitions.
    -->Define Text Types here you can define the Text type same as sales order Text type for Purchage requesition .
    -->Define Copying Rules -->Here you select the Text type(Newly defined) to which text type you want to copy the sales order text then click on Text Linkage -->New Entries in the New entries screen you enter
    Sequence
    Source Object as Sales order
    Source Text
    Fix as blank -Text automatically adopted in target object
                      Finally save the settings.
    Now you create third party sales order system will copy the sales order text to the Purchase requesition
    I hope this will help you,
    Regards,
    Murali.

  • Make short text field in Purchase order creation only display..

    Sir,
    Yeah my requirement is quite unusual, but such is the situation.
    I want to make the short text field in purchase order creation "only disply". what is happening is that user while creating PO is able to change the text of material in short text column. I want to make it only for display.
    Can it done on document type level, since for service type, and Text type of account assignment cat, only text field is filled up. so how to do it.
    Please assist...
    Rahul

    Dear Rahul,
    If you want to have the short text display only for standard item but not service item, you may check below customizing.
    Transaction SPRO:
    MM-PUR-PO
    -> Define screen layout at document level
    Field Selection group: Basic Data, Item
    Field Selection Key:  PT0F Standard item purchase order
    Field: Short text -> set as display
    Hope this help.
    Ian Wong Loke Foong

  • Header Text for Purchase Requisition

    Problem Description: Is there a way Header text can be configured / customized for purcahse requisitions just as we do for POs and then defined to be copied to purchase order?
    I know Header Note is available on Pur Req but comments in this section remain internal. 
    I have also reseached that there is a BADI 'Adopt Header Text When Copying Purchase Requisitions' but in standard system this is not active.

    Hi,
    try this BADI - ME_REQ_HEADER_TEXT     : Header Text: Enjoy Purchase Requisition