Copying a symbol -- create new symbols?

Alright, so say I have a movie clip, whose name is "A". This
clip contains a graphic, named "B". Now, there are two things I
want to do: the first is copy the movie clip as a new symbol and
then edit the graphic in this new symbol. Ok, so I do that special
"Copy to new instance" or whatever feature (the name escapes me)
and it will now paste a movie clip called "A copy" or some name
like that. However, this symbol "A copy" will still contain the
graphic "B", and so I won't be able to edit "B" for only "A copy".
The "B" in both A and "A copy" will change.
So I ask, is there a copy function that will create a new
symbol for A and also create new symbols for all the objects inside
A? (i.e. in the example this copy function would give me a movie
clip called "A copy" containing a graphic called "B copy)

in addition to david - duplicate A and B - then you can edit
either one without effecting the originals.
Chris Georgenes
Animator
http://www.mudbubble.com
http://www.keyframer.com
Adobe Community Expert
*\^^/*
(OO)
<---->
cool cow wrote:
> Alright, so say I have a movie clip, whose name is "A".
This clip contains a
> graphic, named "B". Now, there are two things I want to
do: the first is copy
> the movie clip as a new symbol and then edit the graphic
in this new symbol.
> Ok, so I do that special "Copy to new instance" or
whatever feature (the name
> escapes me) and it will now paste a movie clip called "A
copy" or some name
> like that. However, this symbol "A copy" will still
contain the graphic "B",
> and so I won't be able to edit "B" for only "A copy".
The "B" in both A and "A
> copy" will change.
>
> So I ask, is there a copy function that will create a
new symbol for A and
> also create new symbols for all the objects inside A?
(i.e. in the example this
> copy function would give me a movie clip called "A copy"
containing a graphic
> called "B copy)
>

Similar Messages

  • How to copy VI and create new subVI paths

    Hi all,
    I'm still pretty new to LabView, and I'm not sure how to properly do this..
    Basically I have a working VI which validates a chassis, but I want to use the code on another chassis. The only differences (that I know of) are the login name and password for the new chassis. I enter these two fields using string constants in a subVI.
    If I simply copy the directory of the VI and all the subVIs to a new directory, and open one of the new .VIs, any of my changes are updated to the original VI. How do I break the links to the 'old' files?
    I want to have separate directories for chassis "A" and chassis "B" with all the necessary VIs and subVIs in each, even if the files are redundant on the hard drive (in case the VIs or subVIs need minute changes).
    Sorry for the vagueness in the subject, by the way.
    Solved!
    Go to Solution.

    Are you using projects?
    Copy the code to your new location.  Create a project and add the folder that contains your code.  Use the conflict resolver to fix your VIs.
    In some weird situations, I have also been known to delete the old project, resolve the conflicts for the new project, and then restore the old project from the recycling bin.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions
    Unofficial Forum Rules and Guidelines

  • "Copy items" command creates new folders on clients

    I'm using ARD 3.1 admin and client on the computers at our school. I've noticed that when I try to copy items to clients, incorrect locations are being created on the client machines. For example, when I specified a path such as users/teacher/sites, a folder was created on the client machines called "sers" which then contained a folder called "teacher" which then contained a folder called "sites".
    Several other folders have been created when I've specified paths. It seems that the folder created just leaves off the first letter of the first word in the path.
    I've read about other copying issues in the forum and I'm having those also. But didn't see anything about this particular problem. My apologies if I missed it.
    Is this just related to what seems to be a copying problem with ARD 3.1?
    Many thanks,
    Lisa

    Hi Lisa!
    You must be very specific with your paths: users/teachers/sites does not equal /Users/teachers/sites does not equal /Users/teachers/Sites. Pay attention to capitalization and prefex your paths with a slash to specify the startup disk.
    If you must specify a path with a space in the name then escape characters won't be necessary. You can simply use _*/Applications/Folder with spaces in name*_.
    Hope this helps!
    bill

  • How can I mass move symbols with their motion paths without creating new keyframes?

    I want to move a lot of symbols all at once if they are off centered or just need to be moved around to see differenr styles across the document, but I can't seem to move a lot of the symbols at once, only one at a time slexting their motion paths. It's rather annoying when I have items coming in at different times and have to re line everything up one by one if I want to move things even over by 1 px. Every time I slecect all my symbols and try to move them it just creates a new keyframe that they follow. Is there any tool or certian way to select the symbols and/or thier motion paths and move them without creating new key frames?

    Hi,
    There's no direct way of moving all the symbols/ motion tweens begining at different frames altogether, but the following steps should help you do it -
    1. Select a motion path on stage, goto Properties panel > Options menu (top left corner) and enable - Always show Motion Paths.
    2. Enable - Edit Multiple Frames option in the Timeline.
    3. Adjust the frame-markers in Timeline to show all your symbols, motion paths etc.
    4. Now that you see all your symbols and motion paths together, Select-all and Move them together. Or, use Shift + click to selectively select the Motion paths/objects and move them.
    Let me know if you have any doubts..
    Regards,
    Nipun

  • How to create new text symbols for the standard program.

    Based on the customer's requirement, I need to create a new implicit enhancement for the selection screen.
    I want to create new text symbols for the parameters and blocks, but I cannot change the standard ones.
    Does anybody know something about that? Thank you.

    hi ming yu,
    example : %_MATNR_%_APP_%-TEXT -> this is the material  description name in mb5b
    change the description in ur enhancement implementation
    %_MATNR_%_APP_%-TEXT = 'Material'
    it is works only input/output field
    Thanks&Regards,
    naveen

  • How create new draw layer in Spreadsheet View Multisim Symbol Editor ?

    Hello,
    I would like to know how create new draw layer in Spreadsheet View Multisim Symbol Editor ?
    I am interested in this to create a contact or switch with 3 positions (one in and three out).
    So ... ??
    Best regards

    Hi,
    I am not really sure what you are trying to do with a new layer but the spreadsheet was hard coded and you cannot add a new layer.  In the Symbol Editor, there is a rectangle with dash lines, this is the symbol boundary and you can select Edit>>Resize Boundary Box to make the boundary larger/smaller.  Whatever you draw must be inside the boundary, you can only place pins outside the boundary.  The switch you created will not toggle in simulation, only the switches in the Master database can do this, R&D have to program them to toggle.
    Tien P.
    National Instruments

  • How do you creat a copy right symbol in aperture for your photos

    How do you creat a copy right symbol in Aperture 3?

    You can type the copyright symbol in any Mac application using the keyboard shortcut "{Option}+{g}".
    ©
    Google is a good source for answers to questions of this sort:
    how to type a copyright symbol on a mac?
    You can, of course, also use Copy and Paste.

  • How do you copy a Symbol to other fla without importing it?

    If I try to copy or move a symbol from one fla to another, it
    automatically gets imported, i.e. in the new fla the symbol has in
    its properties a source pointer, to where it was taken from. How
    can i copy a symbol for real, or "clone" it, into another fla
    library, without importing it? If I go to an imported symbols
    properties, how can I cancel the source option? I don't see a
    button for removing the source pointer.
    There has to be some way to make the symbol an independent
    symbol without any relation to its source fla???

    Funny thing is, both if i copy and paste the symbol, or drag
    it from another library, the symbol in the destination .fla gets
    "imported" with information about its source (in the symbol
    properties). I guess either my Flash has some funny settings, or is
    not working as it is supposed to?? Maybe I should reinstall it. I
    have found one way to break the "import" by making "duplicate" of
    the symbol, and then deleting the original, and renaming the
    duplicate back to the original name. Of course, this method is too
    tedious if I wanna copy hundreds of symbols.

  • Copy  Field-symbols

    How to create an internal table from an field-symbol internal table .
    Thanks & Regards
    Santhosh

    I think you want to copy field symbol internal content to another internal table ?
    then
    loop at < fs> assigning <wa_fs>.
       move <wa_fs>-matnr to itab-matnr.
       append itab.
    endloop.

  • Copying home DVD videos, editing, and creating new DVDs

    Here is the situation:
    I have the 17" and this is my first Mac to own. I am computer literate with most my experience on Windows and Linux.
    That being said, I am trying to edit home videos; but they are already on DVDs. I got a LiteOn DVD/VCR combo recorder for my entertainment center. I have a camcorder that uses Hi-8 media and it is only able to use S-video/composite outputs (no USB or Firewire). I am using the LiteOn recorder to archive all my videos to DVDs because it has composite inputs. The LiteON has hardly any editing capability. So I want to take the "simple" DVDs I made, copy them to my HD, edit them (to cut out junk, create better menus, and give it as nice touch), and create new DVDs to distribute to my family and to get rid of old tapes.
    So in short, the process I want to do on the Mac is:
    1. Copy my family home DVDs
    2. Edit the video.
    3. Create more "creative" DVDs for my family.
    I have been looking around the website and reading posts and I don't see how to do this. I did try to create an image on disk utility, but it failed for whatever reason (maybe I am missing a step). How can I accomplish the three steps above?
    Please help.
    Thank you, Michael

    If these are true, standard video DVDs that the drive creates, there are a number of utilities that can extract and convert the videos for use in editing applications. A couple of utilities that people have reported success with are DVDxDV, Cinematize, and MPEG Streamclip (MPEG Streamclip is freeware but requires that you have Apple's QuickTime MPEG2 Playback Component), and there are no doubt others.
    Once extracted, you can use iMovie to edit the clips and iDVD to burn them to a new DVD. Then you can use Disk Image or a third-party application such as Roxio's Popcorn to make additional copies.
    Hope this helps.

  • Not able to create new paragraph format for copied layout of WESCHEINVERS3

    hi all,
    Iam facing one of the pecular problem I copied WESCHEINVERS3 into Zlayout from client 000.
    when i tried to create new paragraph format I found the create element greyed out I have never seen this issue earlier.
    May I know why the menu path paragraph->EDIT->create element is greyed out.
    thanks

    Hi,
    U can create new paragraph formats, windows, character formats etc., only in original language of the FORM.. I guess u were trying to create a new paragraph format in 'EN' but the original language of form 'WESCHEINVERS3' is 'DE', so u can create the new paragaraph format in the copied Z form only in DE language.
    Try to open the Z FORM in DE and create the Paragraph format...
    Hope it helps!!
    Rgds,
    Pavan

  • Create new BPS documents from "COPY DOCUMENTS" user exit.

    Hi Gerd,
    thank you so much for your reply.
    I'm continuing other thread here. (Copy "document icon" to new sheet from "SEM-BPS 1" sheet)
    <b> We've a layout that doesn't use macros. </b>
    We'd like to attach a document for each line that is entered on this layout. All the document attribute characteristics are included in this layout.
    Document contents & technical name can be any thing.
    Should I be able to do this?
    This ensures that users be able to edit documents on other layouts which is crucial.
    I tested this For couple of lines and I was successful.
    Before I'd like to start implementing this, I appreciate your inputs on the prcoess that I follow if this is an effective way of doing?
    Any concerns from the performance side?
    any other hidden issues/concerns that you might be familiar with?
    1) I'm reading all document attribute characteristic values of the layout new lines from the user exit.
    2) I've created one variable for each "document attribute characteristic"
    3) I've created "COPY DOCUMENTS planning function" and included variables in the parameter group
    4) user exit in step 1 fills all variables (fills only 1 value at a time) & passes to "COPY DOCUMENTS parameter group"
    4) due to restriction of only single entry variables usage in
    "COPY plannig funciton", I'm using "API_SEMBPS_FUNCTION_EXECUTE" and executing "COPY DOCUMENTS planning funciton" as many times as number of new lines
    5) if there are 6 new lines, user exit in step 1 loops 6 times & calls "API_SEMBPS_FUNCTION_EXECUTE" 6 times which inturn executes "COPY DOCUMENTS planning funciton" 6 times
    Am I on the right & effective path?
    Is there any better approach?
    Appreciate your inputs

    Hi,
    This is one way you can do that. The bad side of your implementation is that the planning function is called 6 times. It would be better to copy the coding of the planning function and modify it in such a way that you can do all of the steps in one go. If the performance is all right I would still leave it the way it is as then you do not have to change to coding.
    Best regards,
    Gerd

  • Copy long text during creating new assets by reference

    Hi,
    I would like to have copy long text during creating new assets by reference. Is it place in spro where I can set it?
    Rgds, Stenwa

    Hi Stenwa,
    For the field Description you cen set the indicator Indicator: "Copy field group from reference asset" in the screen layout rule.
    If this indicator is set, the screen layout rule specifies that when you create an asset using another asset as a reference, the specified field group is automatically supplied with values from the reference asset.
    For the logtext there is a possibility to maintaine a text in the tables  STXH or STXL with key ANLA
    regards Bernhard

  • Creating new DC using existing DC like copy paste

    Dear friends,
    Any steps how to create a new DC using existing DC.
    I would like to create a new DC which is exactly equal to other DC like copy paste.
    Early reply appricated
    Many thanks.
    Lakshmikanthaiah

    Hi,
    Create the DC in the Track with same name.
    to do this, you need to remove the DC name reservation in the SLD,
    After that, copy src of old project and paste in the new project,
    before copying the src, you have to add the depedencies in your new dc as per the old dc, becuase the copying won't take the dependent dc reference,
    after adding the dependent dc's you can copy the src to new dc,
    when you paste the src under new dc's that should promt you for add some files to acitvity, other wise delete the src and paste it again until u get the popup to add files to activity,
    after pasting - repair the dc project strucutre, roload and rebuild after that check manually all the depenceies are working, now you can build the dc and deployee,
    this process work for only for the same naming dc's,
    i have done this, this will work fine,
    Cheers,
    Apparao

  • With PS 7  create new  Place two objects on the new file  then you may cut copy and paste Cs2  create new  place two object on the new file Cut is not available how does one cut and paste in new file

    With PS 7
    create new
    Place two objects on the new file
    then you may cut copy and paste
    Cs2
    create new
    place two object on the new file
    Cut is not available how does one cut and paste in new file

    If your using File>Place then photoshop cs2 creates what's known as Smart Objects, which photoshop 7 didn't have.
    In photoshop cs2 you can rasterize the smart objects and that should make the Cut function available.
    Select both placed layers, right click on the area to the right of the tumbnail and select Rasterize Layers.
    If in photoshop cs2 you to Help>Photoshop Help and look under Layers>Smart Objects, that should give you a good overview of what smart objects are.

Maybe you are looking for