Copying assembly indicator in BOM

hI ,
i AM COPYING A bom FROM ONE plant to other plant ..In first plant item is a sub-assembly with assemby indicator. When i am copying to other plant this indicator is not copying. Because of which i couldn't able to see its components.
Regards
Patnaik

Patnaik,
BOM Copy happens at single level only. When you are copying the BOM from one plant to another only the Header material BOM gets copied. You need to create/Copy the subassembly BOM for the new plant. Once this is done system would automatically activate the "Assembly Indicator" in the header level bom for subassembly components.
Regards,
Prasobh

Similar Messages

  • Assembly Indicator in BOM Level

    hi,
    can any one let me known any function module to get the list of all materials at BOM
    i,e if i give a material number i should get all the material including the assembly for materials.
    or let me known where the assembly indicator will stored at table level
    i have seen CS_BOM_EXPL_MAT_V2 function module which give all levels of the materials and gives the assembled
    material also but
    My requirement is for given date range, plant and material i should get materials including assemblies with the total quantity used  in that  given date range.
    Regards,
    R K.
    Edited by: R K on Aug 12, 2010 2:17 PM

    hi,
    Thank you very much for effort in helping me on the issue,
    I have already seen all the table in the list previously.
    i closed the issue, using the fm CS_BOM_EXPL_MAT_V2 
    after using the above fm we will get all the assembly materials
    into table MATCAT and passed all those materials and date range to S026 table which gives
    quantity day wise, collected those quantities material wise into another final table .
    Regards,
    R K

  • Assembly indicator in BOM doesnu2019t consider BOM Usage

    In a business scenario we are using two types of BOM 1. Production BOM & 2. Engineering BOM.
    Letu2019s say for Material 'A' there is an engineering BOM & it consists of two components say 'B' & 'C'.
    Material 'C' has its own BOM but with usage "Production".
    Still in transaction CS03, when we display Engineering BOM (Usage: 2) for Material A.
    Assembly indicator for material 'C' is active though there is no engineering BOM for material 'C'.
    Is there is any condition for checking BOM usage for assembly indicator? Or what can be the solution to take into consider BOM usage.
    PP gurus please help.
    Many thanks in advance.

    Hi Sumedha
    BOM usage defines the area (such as engineering/design or production) where a BOM can be used.
    when ur material A is having C as component and C is having its own bom so it will show that in the system. bom usage is only for using the bom in diffrent area
    if u have an engineering/design BOM and if u want to use that in production that time it will give an error
    or massage that BOM usage is not as per requriement
    hope u got it
    regards
    Sachin

  • How to find 'Assembly' indicator in a BOM explosion FM

    Hi experts,
    I need a function module to explode BOM for Materials which are having checked by Assebmly indicator.
    I tried fm : CS_BOM_EXPL_MAT_V2. But i didnt find a field for this indicator.
    Can any of you tell me how to find weather 'Assembly' indicator of a material is checked, using a FM. 
    Please !
    Thanx.
    Matt.

    Hi,
    U can find it in another way by using Table MARC,
    if the value of SOBSL field is 50 in MARC then its an assembly.
    Hope it helps!!
    Regards,
    Pavan

  • BOM assembly indicator

    Dear Gurus
    Please tell me, In which table I can find assembly indicator with related to a BOM.
    Thanks & Best Regards
    Charith

    Hi Rupesh,
    Use FM  CS_BOM_EXPL_MAT_V2 with input as given below.
    CAPID - PP01
    DATUV -System date
    EMENG - Quantity as 1
    MKTLS = X
    MEHRS = X
    MTNRV = Parent Material Number
    SVWVO = X
    WERKS = Plant
    From the output internal table STB get the Field XTLTY. If XTLTY = M, then consider that as Assembly. Apart from this you can also use the Internal table MATCAT. All the Materials MATNR in this table MATCAT are nothing but assemblies.
    Hope its clear.
    Thanks & Regards,
    Ramagiri

  • Table for Assembly indicator checkbox in BOM

    Please inform me about Table for Assembly indicator checkbox in BOM
    Field name--- STLKZ.
    If table is not there then how to find if this field is checked or Not checked  in development program

    Dear Mayuresh,
    There is no table where in you can get this information which has got an assembly of its won.
    Either you can use CS11,CS12 or CS13 for limited level explosion or else to identify for which
    components an assembly exists for itself.
    Or else at Functional module level.
    Regards
    Mangalraj.S

  • Table field for Assembly indicator

    Hi,
    What is the table in which the assembly indicator (BOM) is getting stored?
    Regards,
    Charumathi.B

    Hi,
    Check table STPO and field is STKKZ.
    You can check out this link for BOM related tables-
    http://www.sap-basis-abap.com/sappp007.htm
    Regards,
    Sujit

  • If a material reports to two higher level assemblies in the BOM /Is there a

    Hi, 
    If a material reports to two higher level assemblies in the BOM would creates two planned orders for it. Each of the orders has a different date?
    For example
    Z is final assembly
    In that Y is one assembly in that says X1material in level 2
    And the again same material X1 is reporting to Y in levels 5 so here my question is it would create two planned order with different dates?
    And
    Is there any report to see confirmed time to say machine time / labor time or shall we go for report.
    Thx....Srini

    Srini,
    CS15 can be usefull to check the usage of component in assemblies.
    if its used then more then once it can be easily located through this report.
    another concern what you expressed is not clear.
    But what i understand is same component is used at level 2 and level 4 of a BOM.
    assumption from the word levels is , X is used in  level 2 its used directly in BOM of Y and Y have some differnt component G which inturn again have X in it .
    so at both this levels if the dependent requirement is different, you can get 2 differnet orders use individual /collective indicvator for this material as individual .
    If your concern is for BOM position (Item Number) field in BOM then system will create a single plan order even if you set it for individual requirement in material master.here some work around can be possible by maintaining lead time offset IN BOM in item detail screen.
    check and come back
    Hope it helps you
    Regards
    Ritesh

  • Fixing indicator for BOM explosion marked by default

    Hello Experts,
    I'm in a repetitive manufacturing scenario and I want to know if it is possible to generate planned orders with Fixing indicator for BOM explosion marked by default. Does anybody know if it can be done??

    Hello Laura
    As far as I know, this is not possible to do using customizing, however, you can do that using BAdI
    MD_PLDORD_CHANGE.
    Check the following document for more details about the BAdIs available for MRP:
    BAdIs for MRP
    BR
    Caetano

  • Cad indicator in BOM header or bom item

    Hi All
    Cad indicator in bom header or bom item  is set  only using the CAD interface.The system sets this indicator if the bom header or  item is generated in a CAD system and transferred to the SAP System via an interface.
    If we upload bom with our upload program then this indicator cannot be set.
    Is there is any way by which we can set it for all boms which are uploaded through upload program ?

    Hi,
    Why would you want to do that? Wouldn't it be incorrect representation?
    Regards,
    Vivek

  • Regarding assembly indicator

    Hi,
    I have a simple query regarding the transaction CS03. When I give the Material Number, Plant and BOM Usage as input, I would get the list of components for this material.
    Inside the transaction, is a CHECKBOX field ASM - this Indicates that the component for this material has its own BOM or has further components).
    Could anyone tell me in which SAP table this information is stored i.e. an indicator to tell us if the component/material has further BOM or not.

    Hi Ashwin,
    I have given wrong info...sorry for this.
    By defualt the procurement type will be E or X for all BOm assemblies or F/30..you can use ITSOB field in STPO for special procurement type.
    If you want BOMs for all finished or semi-finished assemblies the join MARC and STPO table.
    Regards
    TAJUDDIN

  • How to tick phantom item indicator in BOM

    hi all,
    i would like to create BOM which i will later use during BOM transfer.
    however, some materials, i use for structuring the BOM only so i do not want it to be procured..
    according to some i should use phantom item however the tickbox indicator is GRAYED OUT/UNEDITABLE in the item data of the BOM...
    how do i do this? my main requirement is to be able to create multilevel bom where only lowest items are actually procured.. in the example, the level 3 items are procured while level 2 bom items are for structuring the BOM only so i would like to set it as phantom item.
    EX: HOUSE1 - main BOM
           ROOF -  level 2 BOM
                  Nails     - level 3 bom
                  Paint     - level 3 bom
                  Tiles      - level 3 bom
           WALL-   level 2 BOM
                  Hollow Blocks   - level 3 bom
                  Cement            - level 3 bom
                  Sand                -level 3 bom
           FLOOR- level 2 BOM
                   Steel Bar         - level 3 bom
                   Cement           - level 3 bom
                   Gravel             - level 3 bom
                   Sand              - level 3 bom

    Hi Ramesh,
    This is a material level setting. If you want only level 3 BOM items are to be procured then create level 1 and level 2 material as phantom assembly (set special procurement - 50 in MRP 2 view and procurement type as no procurement) in material master and then create your BOM as mentioned. During BOM transfer in CN33 select the check box for multilevel and then your purpose will be solved.

  • Set cad indicator for bom?

    Hello,
    i have the following question in the CAD/CAD-Desktop-environment:
    i copied material-bom-data from one plant to another by using batch-input. i didn't notice, that with batch-input the cad indicator cannot be set.
    The result is, that i have all bom without this cad-indicator and now it is not possible to work properly with these data in the cad-desktop.
    my question is: is it possible to set this field afterwards? Is there a function module to do this (i have'nt found one to CHANGE this field)? Or is it possible to simply set the fields in the database (STKO-CADKZ & STPO-CADPO) without crashing any data references?
    Or do i have to delete all the bom an create it again the right way?
    Thanks for any help
    Sven

    Hi Sven,
    try the function module BAPI_DOCUMENT_CHANGE2. In the table DOCUMENTSTRUCTURE you can handle document stuctures.
    regards Iring

  • Delivery Copy Control to sto BOM Header

    hi friends
    we have requirement to stop copying BOM header if there is any component is not copied from sales order to Delivery.
    we are trying to use the copied routine from existed standine routine FV50B101.
    please any one can give me the solution in this program where i can find the how many for compnents copied fo each BOM. if i know the location where are they copying compnenets then i can handle it.
    please give me solution.
    Thanks
    Ramesh

    remark: for me the check is in line 113 (SAPKH60407).
    Please read OSS note 842829:
    2. The system does not transfer the partner data from the STO to the replenishment delivery. This particularly applies to the forwarding agent. The replenishment delivery uses only the customer of the receiving plant (EKPO-WERKS) as a partner. In the replenishment delivery, this customer (EKPV-KUNNR) is the direct goods recipient. The customer is not the sold-to party or a general debtor, for whom the system would determine a (different) goods recipient using the customer master in the replenishment delivery. If the PO header contains a vendor, you can use a modification to transfer the vendor as a partner to the replenishment delivery, if required. However, this is not the standard system behavior. There is no known modification for transferring the forwarding agent.

  • Assembly Item in BOM

    Dear Gurus
                       How to remove the assembly item from a BOM?
    Suppose i have a BOM for materials A,B,C,D. A consists of A1,A2,A3.
    now if i want to remove A3 from the BOM, How would i do it?
    Pls Help
    REGARDS

    Hi,
    There are two possibilities in your case. whether it is permanent deletion or  temporary deletion of item A3.
    1. If you want to delete permanently item A3 from BOM of A. Then go to transaction CS02 & from component list select A3 & delete it. This will change your master data for BOM A, permanently.
    2. If you want to delete item A3 for particular production order, ( temporary delete), go to the transaction CO02, go to the component details screen. From there select the material A3 & delete this. This will be temporary deletion for particular production order. From next order onwards, you can continue with all BOM components A1,A2 & A3.
    Regards
    Sandeep.