Copying pricing procedure from sales document to another

Hi all,
I have a sales document type ZDSI that has a specific pricing procedure and one
sales document type DR that doesn't have pricing procedure.
When I create a sales order DR referencing the sales document type ZDSI ,
the item is copied but without any pricing procedure (total sum is 0).
On the Copying Control: Sales Document to Sales Document - I already tried to set for the item category pricing type = G,E & D.
I need that the system will use the pricing procedure that was copied for the item ,do you know how can I change it to copy from the referenced sales document?
TX
Dana Siman

Hi dana siman
In VOV8 For the document type DR check what Document pricing procedure (Dupp) has been maintained and also check in the document type ZDSI what Document pricing procedure (Dupp) has been maintained.In both the document types DR and ZDSI  Dupp should be same  So if you have pricing procedure RVAA01 and its Dupp is A then check in the DR document type what Dupp has been maintained.If the Dupp is same then the same pricing procedure will get copied
Regards
Srinath

Similar Messages

  • Copy a page from one Document to another

    Can anyone help
    In Pages '08 we had the ability to copy a page from one document to another.
    In Pages '09 this does not seem possible.
    Does anyone have anwser....
    Thanks
    Message was edited by: AJCUR
    OK my bad
    I just realized that I was in Word Processing in one document and Page Layout in another and you cannot do the copy between the two. Changed the Blank documentto word processing and voila it worked.

    I think this might help. Go to the document you want to copy the page from and go to the "View" menu and choose "page thumbnail" so you can see the thumbnails on the side of the document. Right click (or control click) on the thumbnail of the page you want to copy and choose "copy.
    Go to the document you want to paste the page into and make sure you have the "View thumbnail" option turned on. If you already have some pages click on the page you want the new page to follow and then right click and paste the page where you want it. (you have to do this in the thumbnail view area, not in the actual document itself.) If you have inserted the page in the wrong spot, just drag it to the right location. note: I have tried dragging the thumbnail from one document to another and it does not work. Too bad because it works that way with a PDF documents in "Preview" app.

  • Returns pricing procedure for sales document RE !!

    Hi, friends !
    I have doubt in the logic that while doing sales flow from order to billing it picks one pricing procedure. And for returns i want another pricing procedure should be picked.
    As we are giving reference fo Invoice for Returns document it normally picks the old pricing procedure but not the new pricing procedure.
    Please let me know how to configure to pick the new pricing procedure for RE document type.
    Thanks & Regards,
    Sreedhar.
    Email ID: [email protected]

    Hiii Sredhar How are you !!!! where are u !!!
    Go through this steps
    --> First you define the New pricing procedure in the transaction V/08.
    >You define the new document pricing procedure in the IMG path>SPRO>Sales and distribution>Basic functions>Pricing>Price control>Define and assign pricing procedures>Define Document pricing procedure.
    -->Now you assign this Document pricing procedure to the Return order type in the detail screen.
    -->Now you determine the pricing procedure through OVKK transaction with new defined document pricing procedure and pricing procedue.
    -->Maintain the condition records for that condition types.
    -->Now you create the Return order it will pick the new pricing
    Still if it not picks check the Copy control settings In the VTAF transaction
    Go to item details there you eneter "B" carry out new pricing in the Pricing type field
    I hope it will help you
    Regards,
    Your Murali.T

  • Copying Pricing date from Sales Order to Invoice

    Hello,
    I am trying to copy pricing date at line item level from sales document to invoice. Currently I have a pricing date of 04/02/2015 in sales order line item, but in invoice, the same line item pricing date is coming up to be 04/08/2015. The pricing date is defaulting to when the invoice was created.
    How can I change the pricing date of the invoice so that it matches sales order pricing date?
    Thanks,
    Brijesh

    Hello Shiva,
    The line item I am looking at has the item category of Z0N1 (used for Stock item), but when I go into copy control using tcode (VTFA) under item level, I don't see this item category as one of the options for selection. Is that normal?
    Thanks,
    Brijesh

  • Cs sdk: copying an item from one document to another

    is there a way to copy any item from one ai document to the other ?

    I'm not one for bumping old threads, but this problem is really giving me a headache...
    I'm having the same exact problem with copying groups from one document to another.  It doesn't seem to matter if it's a top-level group or not; any group that gets copied over results in the copied art not showing up in the layer list and gives errors when trying to click on it.
    If my source document looks like this:
    Layer 1
      <path 1_1>
      <path 1_2>
      Layer 2
        <path 2_1>
    If I DuplicateArt on the GetFirstArtOfLayer(Layer 1), Layer 1 gets copied into the new document, but it doesn't show up in the layer list and I get errors trying to click on any of the art.
    If I iterate over the children/siblings of Layer 1 and duplicate them all separately, <path 1_1> and <path 1_2> will show up correctly in the new layer list and are clickable, but Layer 2 will not, and clicking on <path 2_1> results in the error.
    At this point, the only solution I can think of is to recursively iterate over the source tree, manually creating the destination groups, and then copying the art work into them.
    Very frustrating!

  • Copy/Move Layerset From One Document To Another Without Flattening

    Hello,
    Does anyone know how to move a layerset from one document to another using JavaScript ExtendScript, but without having to flatten the layers first as I still need to edit them after the move.
    Many Thanks,
    James

    This requires that you have the the two documents open the first document open is the one you are copying from with the layer/layers selected.
    activeDocument=documents[0];
    dupLayers();
    function dupLayers() {
        var desc15 = new ActionDescriptor();
            var ref12 = new ActionReference();
            ref12.putEnumerated( charIDToTypeID('Lyr '), charIDToTypeID('Ordn'), charIDToTypeID('Trgt') );
        desc15.putReference( charIDToTypeID('null'), ref12 );
            var ref13 = new ActionReference();
            ref13.putName( charIDToTypeID('Dcmn'), documents[1].name );
        desc15.putReference( charIDToTypeID('T   '), ref13 );
        desc15.putInteger( charIDToTypeID('Vrsn'), 2 );
        executeAction( charIDToTypeID('Dplc'), desc15, DialogModes.NO );

  • Copy an Image from one document to another

    Is there an easy way to copy a rectangle containing an image (not a link to an image) from one document to another?
    Thanks.
    Chris.

    I can now copy-paste text frames and linked graphics from one document to another using snippets, but embedded images still don't work.
    If I embed an image from a pdf file it works but not for jpeg images. When I open the new document (for which I placed the snippet) in InDesign, there is a frame (with a dark grey background and a diagonal cross) shown, but no contents. The place() method did not throw an exception. What am I doing wrong?
    Chris.

  • Copy Pricing Conditions from Sales Order to Billing

    Hi,
    Is there anyway to copy pricing conditions for item level from Sales Order to Billing Document at the time of creation of Billing Document.
    Thanks

    This question is not on topic for the Web Dynpro ABAP forum and has been locked.

  • Swatch palette becomes full of unused colors when copy and paste from one document to another!!

    sometimes (i haven't found a pattern yet of when) when i copy and paste an object that is solid black (for example) into another Illustrator document, a bunch of unused swatches copy into the swatch palette for no reason! lots of "default global colors" and PMS swatches. i then have to 'select all unused' and delete them all to clean out the palette (which always seems to stall while thinking when selecting or deleting them). often times i get the global swatch warning (always 2x, not just once) before placing an object and before the whole swatch palette fills up with unused colors.
    this has only happened recently in the last few months and i have been using Illustrator for years so i'm not sure what's stemming this. a new update? has anyone else noticed this problem and know a solution? is there a preference checked somewhere that i don't know about?
    guess i should mention i'm on CS3 Illustrator running MAC OS 10.5.6
    thanks,
    kim

    I've had this problem before as well and it has to do with a currupt file that your coppying from. It's too complicated to explain here so here is my fix for it.
    I take the file and save it down or up in CS1. Open infected file in CS1. Create a new file in CS1 the same size as the one you've opened. Select all and drag and drop into the new empty file. Don't copy paste, it must be dragged into the file. You can then delete all global colours and save your file. The curruption will be gone. There's a way to check suspect files to see if they have the deleted global colours present. Open your suspect file in a text editor like simple text, scroll down a little way and if you see a bunch of lines of code mentioning "deleted global colours" then you know it's infected and has to be fixed.
    Hope this helps
    Here is another idea from a bit of research I just did. Don't know if this works or not but you might want to give it a try and it explains the issue in more detail
    http://adobe.groupbrowser.com/t177412.html

  • Copying an object from one document to another in CS4

    When more than one document is open in CS4 (for example document 1 and document 2), and the documents are arranged with tabs at the top, it should be possible to drag an object from document 1 to the tab of document 2, have the tab of document 2 automatically come to the top, and then drop the object onto a page in document 2. Is this a bug or is it just me?

    You're right, it SHOULD be, but it isn't. I filed a feature request as soon as CS4 was released, but add your voice at http://www.adobe.com/cfusion/mmform/index.cfm?name=wishform
    In the meantime you need to either use copy/paste or switch to a tiles view.
    Peter

  • How can I copy a page from one document into another?

    I have produced a document in two separate fils and want to merge them into one.  There are six pages in each file, I need to put them I to one file, turn into a PDF and then mail them.

    Menu > View > Page Thumbnails > click on them > Copy > Paste into Thumbnails of other document
    Peter

  • VL01N user exit to copy pricing conditions from sales order

    Does anyone know which user exit could be used to copy sales order line item conditions to delivery note conditions screen.
    The sales order screen is SAPLV69A field KOMV-KSCHL
    The delivery note screen is SAPLV69A field KOMV-KSCHL
    Thanks

    Hi,
    Just goto include - LV69AFZZ
    And Check ..
    userexit_pricing_check -  USEREXIT_PRICING_CHECK
    Thanks

  • FW CS5: Copy Page from one document to another without changing layers

    Hi,
    how can I copy a Page from one document to another without changing the layers?
    Drag-and-drop isn´t possible and by Copy-Paste all elements are placed in the same layer.
    Greetings,
    toho

    Use File > Import.
    Open the File, then navigate to the page you want to import
    Be sure to select Insert after current page, or FW will just import the content into the current page itself.

  • Copy billing plan lines from one sales document to another

    HI,
    we want to copy the open billing plan lines from one sales document to another, which routine should we use in the copy control in configuration?
    we tried to use,401 and 402 but with no success..
    it's should'nt be a standard process with out any development?
    Best Regards
    Yehudit

    Hi,
    Check where you entering this routine
    If your billing plan at header then enter it at header in copy control, if billing plan is item level then maintain at Item level in copy control
    Kapil

  • Different pricing procedures on Sales order and billing documents

    Hello All,
    I have come across a situation where I will have to maintain seperate pricing procedures for Sales order and the corresponding billing document.
    I was just wondering if this is normal. In my previous projects I always had same pricing procedure for the order and the billing.
    Please share your experience.
    Appreciate your help.
    Thanks,
    Raj

    Hello Friend
    This is a very common requirement in many implementations depending on the scenario
    Sales order with one pricing procedure The same sales order when goes for billing
    Billing document with another pricing procedure
    Settings needed
    Order type VOV8 has a document pricing procedure  Say A
    Billing type VOFA has a document pricing procedure  Say B
    Sales area 1000,10,00 and CPP is 1
    OVKK settings is like this
    1000,10,00 DPP A, CPP1 Pricing procedure is  RVAA01
    1000,10,00 DPP B,  CPP1 Pricing procedure is RVAA02
    The control data in both  RVAA01 and RVAA02 is different
    In VTFL between your del type to billing type aunder the header that item level The pricing type should be B (carry out new pricing) if delivery related billing
    In VTFA betwen your ord type to billing type aunder the header that item level The pricing type should be B (carry out new pricing) if ordery related billing
    Now the same sales order will carry PP RVAA01at order level and RVAA02 at the billing document
    There can be some business scenarios you want to add some extra discount at the time of billing
    That time you have a discount type added in the billing PP so that it is reflected in the billing
    This is scenario dependent
    Hence SAP has given the option of DPP in VOFA so that by billing documentwise we can differentiate
    To achieve this Copy control settings and DPP should be different both in VOV8 and VOFa
    Regards
    Raja

Maybe you are looking for

  • Idoc creation when sales order is saved

    Hi all, I have a requirement of Idoc creation in CRM 7.0 server. Whenever Sales order will be created , upon SAVE , idoc should be created and will be passed to XI server. This  is a scenario of Idoc to XML conversion . I am new to CRM server . Kindl

  • Regarding provide

    Hi, I am selecting some fields from infotype by using provide. like .. provide aedtm            ename            plans            orgeh            kostl  from p0001  between pn-begda and  pn-endda. when I am writing where condition the data will be p

  • Can't boot back to OS X

    Hey there, I recently installed windows 7 (32 bit) as I needed a windows build for a class I am in. I am using a 13" Macbook Pro, Core 2 Duo, early 2010 model. Unfortunately, I am unable to boot back to OS X. I have tried putting the OS X utility dis

  • Adobe Reader 9 Fatal Error

    Hello. I recently installed Adobe Reader 9 on an XP SP2 workstation here. Whenever I attempt to run it, a message pops up with a fatal error "Acrobat failed to load its Core DLL". Does anyone know what this means and how to fix it? I've already tried

  • Why won't itunes open in windows 8.1?

    I have installed, uninstalled, and reinstalled iTunes on my Sony Vaio running windows 8.1. Any suggestions?