Copying the LSMW Project is possible?

Hi Experts,
Pls. clarify that "  Is copying the LSMW Project is possible, like se38 objects?"
If so, pls. let me know the navigation.
thanq.

You Can Copy LSMW  Project in LSMW Transaction..
When you enter the LSMW Screen.
If you want to copy existing object into another name.
1)Then in first screen Enter the
Project              
Subproject           
Object      
you want to copy.
2)Then click All Project Objects
3)Place the cursor on the (Subproject or Object) you want ot copy then press CTRL+F4.
4)Then copy that object into the Project, Subproject you want.
Note : The Project and Sub-poject must be initially created.
or  LSMW==> Extras => Export==> Give a local file name as TXT==> Go to same LSMW system==> LSMW==> Extras => Import.
Thanks
Seshu

Similar Messages

  • How copy the same project with its database schema & deploy it on same PC?

    Hi,
    Firstly, sorry about my forum handle. For some odd reason all the handles that I am trying to create are already in use.
    Right, I am a new Application Express Developer and am managing my own Oracle Database Instance as well. I have managed to create a complete project and I have another client who requires the same project. What is the logic and steps that I can use in making a complete copy of the existing project and use it for my second client. The databse objects would be the same.
    My initial thoughts are to create another database schema as a copy of the current database schema and then do an import/export of the existing project so that the new copy will work with the new schema? I am just talking on top of my head here. I am not a DBA and being new to Application Express administration does not help much either as well.
    Thanks for reading my message.
    Shahzad
    Edited by: user10818643 on 05-Aug-2009 08:49

    Virtual private database basically works by modifying your existing query.
    So you have a table with your clients and a code for each client
    So when client A logs in, he uses an application_context to set his code.
    You have to write the procedure to set the context.
    Now , what you need to do, is to modify your tables so that you can join to your client_code table based on client_code.
    So when client A runs his code, he only sees his own data. When Client B runs he only sees his Data.
    But you , if you run as sysdba can see both sets of data.
    Check out http://asktom.oracle.com and the oracle docs. Oracle expert one on one has a good section on this two (by tom kyte too)
    You really want to satisfy yourself that this is the solution you want. Do the queries run slower. Well, it depends on how well you implement fgac. If implemented well, it will be marginally slower but you will have far less maintenance than an alternative implementation. The big advantage is adding additional clients has virtually no extra workload for you.
    I think you may need to use database account authentication for this to work with Apex. I'm really not sure.
    I suggest you read up on this, and maybe try and set up a 3 table demo app with it. That way you can see whether or not its for you.

  • LSMW - Problem with copied and edited Project - missing new field

    I have copied an LSMW project to a new Project to load a Journal Entry to FI - Transaction Code FB01.  I added a new field VALUT (value date) to both the Maintain Source Fields and Maintain Field Mapping Steps.  The data with the new field shows up in Display Read Data, but it does not show up in Display Converted Data.  This new field is the last field in the csv file, i added it to the end of the Source fields.
    I think perhaps i need to create a new Batch Input Session, because when i run the Start Direct Input Program, one of the messages that comes up refers back to the original project name - not my renamed Project. --> "Session Name OLD PROJECT NAME was opened"
    (The steps available on my screen do not include a "Create Batch Input Session" step, as some of the posted answers show)
    Thank you for your help.

    Hi Sandra, Thank you for your reply.  I am not sure what you mean by restart.  if you mean go through all the steps- yes, i went through all the steps again. I also exited out of the LSMW screen completely and went back in to my project and redid the read and convert data again, just to be sure, but i am still missing the new field in display converted data. 
    The only change i made to the Project was to change the name of the Project, subproject, and object and to add a field to the Source Fields and Field Mapping - for field mapping i used the default rule of Transfer(move)and my source and code seems to be correct - in that i followed the example of all the other fields.  i also changed the name of the file where my new csv file was located, but i did not change the names of the read and converted data files. Perhaps i need to change something else? It seems to me that it is still using the instructions from the old project to convert the data.  Thanks again.

  • [CLD] When do you have to copy the project to disk

    As I am in the last 10 days before I take my first CLD Exam I was wondering if anyone knows when you have to copy the Exam project to disk?  I am hoping it could be when the proctor says time up.  
    LeMur Technology Services, LLC
    President
    [email protected]
    Toll Free: 877-761-2916
    Cell: 609-577-2628
    Fax: 215-862-9816

    This is pure hearsay since it has been a long time since I took the CLD.  But I'm pretty sure they do not consider the copying of the files as part of the exam.  So it is done once time is up.  That's how it went for me.  Last I heard, it is still that way.
    The CLD is not exactly easy, but it is not nearly as bad as a lot of people make it out to me.  Even my boss passed and he didn't even finish.  A good friend of mine passed even though he hadn't even touched LabVIEW for at least a year (I mentored him A LOT during the previous year).
    If you are worried about losing time due to copying of files, then I'd say you need to practice more.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions

  • Issues on Copying the Project without Project Stock Checked

    Hi,
    When I copy the operative project (with project stock unchecked and components assigned to the activity in this project) to create a new project, I checked the project stock in the master data of the new project. Although the new component assigned after the creation of the new porject is project stock, the component copied from the operative project is still not project stock.
    Is there any walkaround or solution to make the copied component to become a project stock?
    Thanks,
    Ting

    What was the item category of materials of the old project which you used to copy?

  • I recently had some 8mm film transferred to DVD. I am trying to edit the film clips using Premier Elements 4.0.  Some of the film clips copy into the project but others don't. I tried copying the VOB filed onto my hard drive and then changing the file ext

    I recently had some 8mm film transferred to DVD. I am trying to edit the film clips using Premier Elements 4.0. so I can reburn the films on a single BluRay disc. Some of the film clips copy into the project but others don't. I tried copying the VOB filed onto my hard drive and then changing the file extensions on the VOB files to MPEG but this was no help. Some of the VOB files contain numerous film clips but my software does not appear to be able to recognize them as such. I need to know if replacing my old Premier Elements with the new Version 13 would solve this problem or not. Any advice would be greatly appreciated!
    Bob

    Bob
    What do you have now.....
    What computer operating system do you have?
    We can go into the finer points of source and your intentions, but for now it would appear that you are using SD 4:3 source media to get to a HD 16:9 result. Lots to discuss in this regard.
    What was given to you on the DVD disc? DVD-VIDEO 4:3 or something else?
    If DVD-VIDEO on DVD disc, you should expect to find on the disc a folder named VIDEO_TS. That is your target for your video files.
    If you were given a DVD-VIDEO on DVD disc, then all you want from it are the video files, specifically
    VTS_01_1.VOB, VTS_01_2.VOB, and so on through that series until possibly getting to
    VTS_02_1.VOB, and so on. How many files you have beyond the VTS_01_1.VOB file will depend on the size of the DVD-VIDEO.
    Does the above scenario apply to you?
    The alternative might be someone giving a DVD disc (data disc) which contains just the VTS files mentioned which were copied from
    the VIDEO_TS Folder. So, you do not get the whole VIDEO_TS Folder, just the essential video files. Does this scenario apply to you.
    I see no need to replace your Premiere Elements 4 with a later version unless you have a huge project and need a later version that will be a 64 bit application running specifically on Windows 7, 8, or 8.1 64 bit computer.
    Consider...Premiere Elements 4 and if you have DVD-VIDEO on DVD....
    1. Place the DVD disc in the burner tray
    2. Open Premiere Elements 4 and set the project preset for NTSC DV Standard (assuming you are working in a NTSC setup)
    3. Go to
    Get Media
    "DVD, Digital Camera, Mobile Phone, Hard Drive Camcorder, Card Reader"
    "Adobe Premiere Elements - Media Downloader" and its Advanced dialog.
    Set the Source in the latter dialog for the drive which has your DVD disc inserted in its tray
    You should see your VTS_01_1.VOB thumbnail in the "Adobe Premiere Elements - Media Downloader" Advanced dialog.
    With this VOB selected, click on Get Media to get the file from there into the project.
    Should work fine.
    Complications may be involved if the people who processed your footage gave you something other what is described above.
    Please review and consider, and then we can plan our project strategy accordingly.
    Thank you.
    ATR

  • Copying a video project from CS3 on the PC to CS3 on a Mac

    I am collaborating on a project with a colleague.
    He has Premiere Pro CS3 on his PC and we want to put the raw Premiere file he has worked on on an external hard drive and open it on the same version (Premiere Pro CS3) on my Mac so I can do some edits to it as well. Is this possible? How do we reconcile the .avi and .mov issue? How best to copy the files so PP can find them (or ask me to locate them)? We could use an answer as soon as possible. Thank you!!

    In general terms, it should not be an issue. I work on Mac Projects all of the time on my PC.
    Now, two things to think of:
    1.) unless this has changed, the Mac will only see a FAT-32 formatted HDD, not an NTSF. This limits you on file size to ~ 4.GB. With a program like Mac Drive (might not even be needed with most newer PC's), the PC can handle a Mac formatted external.
    2.) I have no issue using .MOV's with the Animation CODEC on my PC. I'd probably convert all AVI's to that, to work on the Mac (boy, I hate typing that blasphemy, but I'll get over it). If I understand correctly, CS4.1 with the latest QT (Pro?), will now handle the ProRez Apple COCEC's. There is a recent thread that makes mention of this.
    After you do the setup, you should be good to go. Now, I have only gone one way - Mac to PC, so I could well be missing something.
    Good luck,
    Hunt

  • What's the purpose of copying the projects?

    I use Enterprise PeopleTools 8.49 Installation for Oracle for a guide to install the peoplesoft. When I did the step of Updating Database to Latest PeopleTools Release of Chapter 7B, I found that it told me to copy the project to the database but no to tell me to build it. Without building the project, the objects of the project can not be built. Should I need to build the project? What’s the purpose of copying the projects?

    I'm afraid, you were starting to speak about Peopletools installation tasks, which come with its own particularities, now you're speaking about maintenance packs which come with other particularities.
    Honestly, I didn't read the MP6ML installation guide, and if you need to build the project or not, I do not know, and if you need, I don't know the options neither.
    But I'm sure, because I did it several times by the past for other MPs, everything was well explained in the doc and/or template, including the exact options you need to set before building the project.
    For MP application, PSCA should be used as most as possible, if not possible, then manuals steps are described in the templates. If not, then open a case to Peoplesoft support.
    ...the second one just told me to copy the projects named HC9_MP6_ML_1_CP and HC9_MP6_ML_2_CP from file to my target database. So should I build the projects? And which options should I choose when I build the projects?If the template describe only a manual copy project (without build), then copy and do not build the project.
    Nicolas.

  • How do I copy the introduction of a project to other projects?

    I am trying to find out how to copy the introduction (video clip + title + audio clip) of my video series from one project to another.... so far, the only information I can find tells me to 'open both projects at once'.... I have searched everywhere and cannot figure out how to open multiple projects at once.... i can copy the video clip to a new project, but the title and audio track don't come with it... they won't drag and drop nor copy and paste into the new project. I plan to have many episodes of my video series, and want my standard introduction to be at the beginning of each new project, without having to do the title and audio from scratch each time, like i am doing now.
    thanks for any help.....

    Does this mean I would have to then delete all the other clips/audio, etc from the new, duplicated project? Surely there must be a way to just copy one section into a new project. I start making some of the new projects in advance, and want to drop the intro into the beginning... if I already have the next three or four 'episodes' (projects) already started, the duplication thing won't work.....

  • I want to copy video, cutaways and audio combined and use in another project. So far I can only copy the video clip or one of the other elements at a time. How do I group all of them?

    I want to group my  video clip with its audio and cutaway clips so that I can copy the segment and move it to another project. So far I can only move one element at a time. How can I group all the elements?

    You can select multiple objects in the timeline in the usual Mac way - hold down the shift key while you click on the objects then copy, select other project, position playhead where you want to insert then paste.
    Geoff.

  • How can I burn a copy of my project to a DVD . I do not have IDVD because I have the Lion os. I did purchase Wondershare for burning but it will not load the iMovie events or projects

    How can I burn a copy of my project to a DVD . I do not have IDVD because I have the Lion OS. I did purchase Wondershare for burning but it will not load the iMovie events or projects

    There is no proper substitute for iDVD.
    Why is there no iDVD on my new Mac?
    https://discussions.apple.com/docs/DOC-3673
    UPDATE & ADDENDUM:
    But even though you can still buy iLife 11 that includes iDVD 7 from Amazon, Apple now make it difficult to install:
    Poster jhb21939 posted this in another thread:
    “when I attempted to load iDVD into a new iMac. A notice came up on the screen stating that the 'Authorisation Licence' had expired on 25 March this year (2012).
    I contacted the Apple support team and eventually, I was told that the Licence had been withdrawn and could no longer be used.”
    In other words Apple are now so adamant that we don’t use iDVD that they have tried to make it impossible to install.
    In response, Old Toad posted this solution:
    “You can still use it one all of your Macs.  If you get an invalid certificate message just set your Mac's clock to sometime before early 2011 and run the installer.  After you're done reset the time back to the correct time.” He added this comment:
    “It began after iDVD and iWeb were discontued and they were dropped from the Apple Store. All I can think of is the certificate was set to expire after a certain time period after the intitial iLife disc was released.
    I've been able to use the installer even without setting back the date.  I just clicked on the Continue button and it would work as expected.  For some it would not continue unless the date was set back.”
    The latest anorexic iMacs just announced do not even include a CD drive! Proof positive that Apple virtually prohibit the use of DVDs - although the newly announced Mac Minis do include a Superdrive.
    Yet, they still include iMovie! Heaven alone knows or understands what you are supposed to do with your newly edited masterpiece - except make a low quality version for YouTube?

  • I made a duplicate copy of an imovie HD project and when I updated the titles on the copy, the video stuttered . I'm using Snow Leopard OSX. The length of the movie increased unexpedtedly too.

    I made a duplicate  of an imovie HD project so I could have two different versions. I tried making the copies both by using File> Duplicate and the Save As command in imovie.
    When I changed the title on the copy, the video stuttered when I played it back.  Also the overall length of the movie increased by about 6 seconds throwing off some sync even though the replacement title was exactly the same length in seconds and frames as the one I replaced.
    any thoughts how to fix this?
    I'm using OSX 10.6.8.
    thanks.

    *24 December 2009*
    *Dear Mac Users:*
    Hello. Thanks to AppleMan1958 for answering my question about how to edit an iMovie project
    on another computer.
    Here is a question related to the process of transferring the iMovie '09 project file from my friend's
    computer to an external drive so that I can edit that project in iMovie '09 on my MacBook Pro:
    How do I know if my Smart Disk FireLite portable external drive is formatted to MAC OS X Extended (journaled)? How I do format this Smart Disk FireLite USBFLB80C to MAC OS X Extended (journaled)?
    When I connect the Smart Disk FireLite to my MacBook Pro via USB, open iMovie '09, and select View
    Events By Disk or rather "Group Events By Disk," an icon for the FireLite external drive appears, but there is a yellow triangle with a black exclamation mark on the icon for the external drive. What does this "warning" mean? There are MP3s of music on the same external drive and they open just fine in iTunes. The one iMovie project file that is already on the drive will not open up in iMovie.
    So, how do I properly format this external drive in order to transfer an iMovie project file from my friend's computer so that I can edit it on my MacBook Pro using iMovie '09?
    Sincerely,
    Corey

  • Is it possible to copy the same database multiple times simultaneously?

    This is the setup of my environment.
    I have a 'master' database that contains the full schema plus some pre-populated data such as default settings. When database schema changes are made, they get made to the master database. When a new customer signs up for the service, I make a copy of this
    master database (using SMO) that will now be the database containing all of the customer's information. The database is rather large, and the copy operation can take a couple minutes.
    Everything works fine as expected, unless I try to provision two new customers at the same time. It appears that Azure only allows for one DB copy operation at a time. Is there a way to allow for copying the same database multiple times simultaneously?
    Thanks for you input. I understand that this is likely not the optimal setup, and that there is many better ways of doing this, but I am somewhat heavily invested in the current process and I would like to find out how to make it work if I can.

    BTW, you can do this programatically by using PowerShell (https://msdn.microsoft.com/en-us/library/ee210569.aspx), SqlPackage (http://www.benday.com/2012/12/18/deploy-a-sql-server-database-projects-dacpac-with-sqlpackage-exe/)
    or the SQL Server binaries for .NET (http://www.vijayt.com/Post/Deploying-a-data-tier-application-in-SQL-Azure-programatically)
    Hope this helps.
    Alex

  • Is it possible to make a 'save as' copy of a project?

    Is there any way to save a project in FCPX effectively in a ‘Save As’ mode? 
    I know there is ‘Duplicate as Snapshot’, but it only protects compound and multicam clips. and most of my projects have only a few compound clips.  None have multicam. 
    The other option,‘Duplicate’, only creates a copy of the original, and both change if you make further edits. ( I'm sure I must be missing something, but I can't see when this type of Duplicate might be useful.)

    I'm not sure what might be going on. Are you certain that the duplicate project wa the one that was opened – and not the original?
    Here is a single event and with a a very simple test project (Original Project) with some text added:
    Here is that project duplicated with New Text.
    Here is the second duplicated project:
    As you can see, the text from the original project was not affected by the revision in Project1. Otherwise, the second duplicate would not have the original text.
    BTW, it would not surprise me at all if it turned out there was something amiss with your installation. I have, for example, experienced very unpredictable behavior with the library backup function. So for me it is especially important that this versioning method work reliably.
    Russ

  • How can I copy the titles from a project volume one use them for the rest?

    I'm editing a four DVD set, and would like to use the same opening titles and credits for each. How can I copy the titles from volume one and use them for the rest? Thank you.

    Open the project that has the titles you want to use. Select (highlight) all the title clips you want, then right-click and choose COPY.
    Open the new project(s), then paste the titles onto the Timeline.
    Done.
    -DH

Maybe you are looking for

  • Time Capsule vs NAS attached to AEn

    This may be a hard one to answer without having the product but can anyone weigh in on whether using the Time Capsule drive would have faster access times than say a Lacie network drive attached to Airport Extreme N? Reason is that keeping our photo

  • SharePoint via VPN in a hosting environment

    Hello everybody, today I come across with a question regarding infrastructure design. Beforehand you have to know, I am not an architect, until now I was just an Sharepoint admin :) We have a scenario, that one of my customers want us to host a share

  • Clicking F1 in compiled help does not expand the TOC

    When I pretend I am a user of the online help system I have developed using MS HTML Help, the relevant page opens but the TOC doesn't expand to expose the page name on the left. Is this a limitation of the HTML Help program?

  • EJB transaction question in ejbCreate

    I have 2 Entity EJBs participating in an relationship. Order - LineItem. I'm creating the LineItem in the the ejbPostCreate of Order. When I encountered a duplicate key for Order in Order's ejbCreate, I was not expecting the LineItem to be created, I

  • HT204135 Printing email to PDF it will overwrite if other file with same name

    When printing an email to PDF (in OS X 10.8.2) it will overwrite if another already printet with the same name, this did not happen in older versions. Why?