Cost Booked agaist a Process Order

Hi Experts,
For reporting purpose I have to pull Cost Booked agaist a Process Order ( Material cost+ Activity Cost+ Overhead etc etc.
Which Table and Field I need to look for Or Reference in my Report?
Thanks in advance

YOu can see the cost Incurred for thr production order in Co02> go to cost> analysis -- Select the layout cost treand In The layout add the value and cost element, You can see the complete detail
Material cost is picking from Material master as per the price control
activity cost is picking from KP26
Over head cost is picking from IMG> CONTROLLING> cost center accounting > actual posting>period end closing> overhead>costing sheet component--> Define percentage overhead rates
Then find the appropriate tables for the same

Similar Messages

  • Not able to see the Cost analysis in the Process order (T-Code COR2).

    Hi SAP Guru's
    Csoting in the Process order Configuration.
    I have done the Config setting related to the Product Costing Controlling with regard to the
    Cost Sheet, Cost Componet Structure.Overheads, asssigning the Cost elements in the Costing sheet.
    assigned the same in the Process order.
    And also the Costing variant options seen in OPL1 t-code can not be displayed in the Process order Csoting Variant selection.
    where as the in the Costing variant for the cost component structure, i can see  the Xompany code with required plant details.
    looking  the costing alanysis data in Process order, unable to see

    Hi,
    If you are looking at cost analysis.  You will get this only some you do confirmations to the production or process Order.
    I hope you did confirmation of material and quantities to the Process Order
    Best Regards
    Surya

  • Target cost not appearing in process order

    Hi All,
    Please let me know the reasons for target cost not appearing in process order.
    Thanks,
    SAP PQ

    Two more scenarios:
    1. You have co-product.
    2. You reverse the variance calculation.
    It will show the target cost only after you run variance calculation.

  • Target Cost in the settled process order become zero after cost deletion

    Dear all,
    User has standard cost estimates created in Jan 2010 that valid until the end of 2010 for every material in the system.  user created a process order in April 2010. Target cost of the order was created based on the standard cost estimate and recipes as well as order qty.    The order was also confirmed and settled in April 2010 without problem. 
    However, after I deleted all old costing estimates before I did a costing run for all materials in May 2010, the old order was resettled and all Target cost is removed from the order.  I guess system try to look at April costing estimate but it is not there since it was deleted before I created the new costing estimate in May.  Therefore, all varainces are throwed into remaining variances since the target cost become zero.
    Other than mark the settled order for deletion or keep all old costing estimates,  I am just wondering is anyway in the configuration to prevent the system to recaculate the target cost again for the settlement so I can avoid the problem happens?
    Thanks.

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

  • Target Vs Acual Cost Comparison for multiple process orders

    Dear SAPians,
    I want to take a report for target vs actual cost for all process orders and product cost collectors created in a particular period. I have checked the standard report KKBC_ORD that serve my purpose but for a single order. I want the same report for multiple process orders and product cost collectors.
    Is there any standard report or should I create a report painter report. I have tried to create a report painter report based on library 7KO, but target cost was not showing for selected order.
    Kindly suggest.
    Shirazi

    Target Costs are available in library 601 for internal orders (and can be used for process/production orders).
    Regards,
    Adrian

  • Costing Error While creating Process Order in COR1

    Hi when i am trying to release the process order in COR1, I am getting the below error *The business transaction
    cannot be carried out*
    System status CSER is active (ORD 00000000001)
        Message no. BS013
    Diagnosis
        Object ORD 00000000001 has system status CSER (Error in cost
        calculation).  According to this status, transaction 'Release' is not
        allowed.
    Procedure
        You can only carry out the requested function if this is allowed
        according to the status of the object.
    Kindly Help me to fix this issue
    thanks
    Kishore
    Edited by: Emergys Corp on Jan 6, 2010 8:23 AM

    hi,
    goto OPJH and check the nature of the status profile assigned to the PP order type..
    hope this mite help
    regards
    sayeed

  • Costing problem while running Process order

    Hi,
    This is a  problem relating to costing of HALB material.. While doing process order for a fert material (BOM of FERT material contains a HALB and two ROH materials) a window occurs while saving ' Error when calculating costs, see log'. Why is this happening? I have checked the BOM , all components are subjected to cost relevancy (X). For HALB material no values are manually maintained in planned price 1,2,3 fields in Costing 2 view of material master. Do we have to manually maintain or will it be taken from the ROH materials in HALB BOM. For ROH materials values are comin in planned price 1,2,3 fields in Costing 2 view . If this has to be done what is the configuration. The ultimate issue is while running process order for FERT material no costing is happening for HALB material.Pls share your suggestions. Rewards assured.
    regards
    Ashok

    Hi,
    when you have raw semifinish and finish material as in sequence then first order of semifinish has to be created and it will capture raw material cost and other expences if incurred after confirmation of semifinish material you will be able to create a finish material production order b' cause that semi- finish material yo have to consume for finsh order.
    if at all first sfg order has updated the price of sfg (after settlement of order) then it will take correct price for finish material
    reward points if you find it useful.

  • Total Target Costs not updated in Process Order

    Hi All,
    I  have a scenario in a Process Order,
    The Process order is Released, Goods Issued and GR done. But the when i go and check the Cost Analysis i did not see anything in the Total Target Costs  and Total Target Qty coloumns agianst all the cost elements. It show as zero for all.
    It looks very strange. There is variance in the component issues and GR  as well. I simulated for the same material with a new Process order and found the vales get populated automatically on GI and GR's with variation against requirement quantity.
    Could any one explain me why it is so ..? or is my understanding is wrong.....?
    Thanks for your time and patience.
    Regards,
    Srinath V

    Srinath Venkatr,
    I think you are missing PP CO integration configuration during master data creation. There might be information massage to you during process order creation saying , 'Logs during Cost calculation", you are skipping the same and creating process order withought resolving the same.
    Check whether you followed all the steps for product costing.
    Material master,
    BOM,
    OPKP:-Controlling area-activate components and Controll indicators
             :- Assignment of co codes
    KS01: Cost center
    KA01/KA06:- Primary/ Secondary Cost elements
    KL01:-Activity Types
    KP26:- Activity Price Planning
    Then Work center/Resource- assign these cost center and activities with costing formulas.
    Then Routing/Recepi-
    After master data, demand management,MRP- process order. while creating process order check cost calculation errors.
    Hopes that will clear your dought
    Tara

  • Reg: Need to capture cost / energy consumption in process order

    Dear Friends,
    I need your valuable advices for one of the following
    I have a scenario where for one of the process , we are generating Energy(heat) in in-house b y burning coal.
    We are manufacturing steel Pellets , and it is continuous process at the end of the process these steel pellets are heated upto 1200DegC in furnace,
    and for this we are generating energy in in-house by burning Coal on the other side.Now i need to capture this energy cost in my process order. And also i need to have shift wise energy consumption report.
    So let me know how can i achieve this..?
    Can we achieve by defining is as an extra activity type..? if yes , please let me know how and also necesary formula to achieve this.

    1. Define New Std Value in your std value key. Say E0001
    2. Now Ask Costing person to Create New Activity Type say ENG01
    3. Now Decide how you want to calculate your Energy consumption will it based on you Order qty or It will based on the Machine run time.
    4 Now give the std values in Routing as per Operation qty or Machine Run time
    5. If is is based on Based on Operation Qty The formula will be
    ENG01 = (Order Qty x Std Value of Energy)/ Operational Qty.
    6. If it is Based on Machine run say 24 hr will burn 1000 joule
    Then formula will be =
    Machine run x Std value of Energy as in Routing.
    Take help of your Costing guy to arrive at the Formula.

  • Control Costs not Displayed in Process Order Cost Reports

    Hi
    After Variance calculation and settlement of Process Orders also COntrol COst appearing as Zero, is there any step I am missing or any configuration needs to be adjusted?
    Thanks in Advance
    Regards
    Venkat

    Hi,
    I checked in IDES system as well, there also using standard settings control costs are not getting updated on the process orders. 
    I couldn't makeout how the control costs fields get updated in the process order cost reports
    Regards
    Venkat

  • Target costs not displayed in process order

    Hi,
    We have set up a small PI scenario. The issue we are facing is that the target costs are not displayed in the order. Actual costs appear after confirmation, but target costs appear as zero.
    We have maintianed cost relevancy in work centers, defined valid activity types, maintianed price in material master for all components and also run the standard cost estimate and released it.
    Please let us know what we are missing and why this error could be happening?
    Thanks in advance,
    Ashok

    Target costs are populated when you do the goods receipt. System will search for the released standard cost estimate and then apply that for each material component. If these 2 conditions are passed, then you will get target cost in order,
    You need to define the following,
    1. Variance Key - Transaction "OKV1"
    2. Assign that to Plant using "OKVW"
    3. Define Variance Variant using "OKVG"
    4. Define Valuation variant for WIP/Scrap calculation using "SPRO"
    5. Define target cost version by assiging sl no 3 & 4 and also how the cost calculation should be used.
    Once this activities are completed, execute production/process order and then after goods movement and some confirmations process Variance using "KKS2" as a period end activities.
    Edited by: sarin toms on Dec 2, 2008 2:26 PM

  • Actual Costs and Activity Type - Process Order

    Hi,
    I'd like to know if there are any tables recorded with activity type and actual costs from process order.
    Thanks in advance.
    Osmar Tardivo.

    Osmar,
    Check table COEP

  • Planned cost & actual cost are same in process order.

    hi,
    I have created new order type for process order.
    when i made process order & i  going for  confirmation in cor6n , on screen fixed & variable overheads values are coming which system had taken from receipe.
    when i did changes in that values which are in hrs & confirm & settle the order, in cost analysis plan cost & Actual cost was seem to be same.
    I dont get why this is happen ? is there any config in order type.
    thanks in advance.
    regard
    sanjay.

    Check in cost analysis, IN plan VS actual Is activity is available?
    I feel U haven't maintain activity type in costing view of workcenter

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Process order settlement to cost center

    Hi,
    We have a requirement to settle only the quantity to material and the costs to
    cost center from the process orders. This is to ensure the materials are
    handled as non-valuated and the COGM is computed from the goods consumption
    postings.
    The process orders will have both co products and by products as well.
    There is also one more requirement to allow Purchase orders against the non-
    valuated materials.
    I am planning to propose the following :-
    1) To make the materials valuated but set the standard price to zero to give
    the effect of non-valuated materials and at the same time can also raise
    purchase orders because otherwise non-valuated materials cannot be used to
    raise Purchase orders.
    2) When goods receipt happens from the process order the actual costs of the
    process order will remain as it is in the process order since the standard
    price of the FG is zero and only the quantity will be received into inventory.
    3) When process order settlement happens the full actual costs will be settled
    to a price difference account and cost center tied to the price difference
    account.
    Do you guys see any flaws in the above design?
    Edited by: FICO Consultant on Feb 21, 2012 4:28 AM

    Answered

Maybe you are looking for

  • Creating a Master with Two Detail report style

    In a Group-Above report data model, how does one add a 2nd detail group appearing at the same hierarchial level as the 1st group? The report already exists with MASTER and detailA. I need to add detailB and tie it to MASTER just like detailA. |MASTER

  • Undefined step in bpm

    hi, can any body tell me that why do we use undefined step in BPM Message was edited by:         vvr murty

  • HANA level based Hierarchy is not displaying in AOLAP

    Hi all, I have created a level based Hierarchy in HANA which I have been able to display in Excel using a HANA MDX Provider connection: However when I try to use the Hierarchy in Analysis for OLAP I am unable to see it, instead the dimensions are fla

  • MB Air - 2 external monitors

    Hello, is there any possibility to connect two external monitors (no Apple-Displays) with each 1080p to an MB Air 2013? Thanks a lot for your support. br, Timo

  • PS 5.1 crashes on opening

    We bought the Creative Suite last year, version 5.1 ... I received the email for a free upgrade to 6, but I was never able to get the link to work nor to reach anyone at Adobe to help me with it, so I never completed that upgrade. I have this ongoing