Hi dear All,
I got issues running KSU5 to allocate planned costs under cost element type 42. we were expecting that all planned costs (primary and secondary(cost element type 42)) could be allocated by credit cost center (actual). only primary costs are being allocated.
Scenario:
cost center planning (kp06) 1000 currencies in primary cost element in cost center A
running planning assessment - KSUB: cycle uses assessment cost element (type 42): sender cost center A, receiver cost center B (all planned values). assessment cyles posts 1000 currencies from CC A to cost center B
planning in cost center B (primary cost elements through kp06, 500 currencies) total planning 1000 from previous assessment  with CE type 42, and 500 from cc planning in a primari CE.
by the period end closing, tcode KSU5 (allocation actual) is running. new cycle created, based on planned values (origini not actual, but planned amounts).
we were expecting to allocate 1500 currencies from cost center B to cost center C (using 100% and through assessment cost element)).
result: credit actual cost center B = 500 currencies debit actual cost center C = 500 currencies.
1000 currencies pending on cost center B (planned).
do you know why SAP is not allocating the 1000? even if those 1000 were planned in cost center B by assessement, a new allocation cycle should be able to post them or not?
thank you for your outcome.

Hi dear Ajay, thank you for your answer.
first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
On sender tab I have only the cost center. no cost element defined.
receiver its cost center.
furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
the only difference is: planned costs which their origin is already an assessment are not being assessed again.
I can show you the print screens with cycles setup if it helps
best regards
MF

Similar Messages

  • Need to take cost center assessment cost to product

    Dear All,
    We have product costing activated in our system. We are taking Raw material , packing material cost from Material master. where as activity cost based on different activity type defined on relevant work center / resource based on certain formula.
    Now for some other expenses like power / utility cost, we have created assessment cycle, through which we assess the cost to relevant cost centers based on certain base (SKF).
    Now our business requires this cost to load on product cost which is laid on cost centers through assessment.
    Pls suggest the way to achieve the same through product costing.
    Thanks & Regards,
    Taral Patel

    Dear Ajay,
    Thanks for reply.
    As per my understanding below mentioned points I need to consider for costs which is coming on cost center through assessment (based on SKF) as I want to take them to my product :
    I need to create seperate activity types for those expenses which I want to take onto my product.
    I need to assign them onto my work center / resource.
    I need to create a Splitting Structure in OKES and assign respective secondary cost element to the relevant above newly created activity type.... With this, the amount in secondary cost ele would be divided by the relevant activity type ONLY
    (Choose splitting rule/method as "!2" i.e. Activity Qty in OKES)
    I need to assign my production cost centers (through which I want to transfer cost to my product) to this splitting structure in OKEW.
    I need to map sec. cost ele. of above created act. type to co. comp structure.
    Suppose I have one power plant at my plant campus. I am distributing this power cost to my 4 different plant (existed on campus) on their respective cost centers Ctr1, ctr2, ctr3, ctr4.
    Now as per above understanding when I can see this newly created activity cost to my product cost?
    For that I need to assess power cost to all 4 plants and then running my product cost with these newly created activity types?
    Pls correct me in my understanding.
    Thanks & Regards,
    Taral Patel

  • Table where cost center assessment cycle details are saved

    Hi,
    Can anybody tell me what is the table where Cost center assessment cycle details like sender cost center,receiver cost center, assessment cost element, SKF etc... are saved?
    Regds,
    Bijay

    Hi,
    Look at the T81* tables.
    Regards,
    Eli

  • Cost Center Assessment to Cost Hierarchy based on Actual Consumption error

    Assessment is set up:
    SENDER:   Cost Center: Overhead Expenses (values in expense accounts)
    RECEIVER:  Top Node of Cost Object Hierarchy  (material consumption has been posted to two objects - related account has value and quantity fields)
    Segment is set up:
    Sender Rules: Posted Amounts
    Share:100%
    Actual value origin
    Receiving tracing factor:
    Receiver rule: Variable Portions
    Var. portion type: Actual Consumption
    No Scaling
    Assumption is that "Var. portion type: Actual Consumptions" means the quantity in the consumption account on the receiver from the inventory posting.     Is this true?
    Edited by: Chris Gibson on Apr 13, 2010 11:56 PM

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Error in cost center assessment integration with FI

    We just upgraded our test system with support pack SAPKH50020 and when we test cost center assessment, we are getting the error message "For document type SA, an entry is required in field Reference"
    The same process is working in our production system, which is under support pack SAPKH50010.  We are using the same doc type, and the configuration for this doc type is the same as in our test system. 
    OSS told us that the only solution is to change the doc type configuration or use a user exit to populate the Reference field.    However, I don't understand why this process is working in the old support pack and not in the new one.    
    Has anybody encountered the same issue?  If so, how was it resolved?  
    thank you,
    Lanny

    Hi Phaneendra,
    Thank you for your response.  But the real question is why is this process different between support pack SAPKH50010 and SAPKH50020.   In support pack SAPKH50010, we also uses document type SA with reference field required, but the cost center assessment is able to post to it without any customization.    Now, in support pack SAPKH50020, this no longer works.    So I'm just wondering if any of you have encountered similar issue after upgrading the support pack. 
    thanks
    Lanny

  • Cost center and Cost element.

    Hi all,
    I am in an urgent need to understand the relation between cost center and cost element. Please provide me with their individual information as well as the link they share. An existing relationship table between the two, if any, ...then plz mention.
    Thanks & Regards,
    Naresh

    Cost Element: cost element is an individual which carry cost like salaries, wages, power expenses, etc.. These Cost Elements are Two types
    1. Primary Cost Element
    2. Secondary Cost Elements
    Primary Cost Element will carry cost form FI to CO (Cost Centers, Internal Orders, Cost Objects, etc…)
    Seconday Cost Elements carry cost with in CO to different Cost Centers, Internal Orders, Cost Objects, etc…
    Cost Center: Cost Center is an individual which contain collection of costs. For example “Admin is a cost center, it contain costs like Salaries, Power, Rent, Stationary etc,
    With this following report you can retrieve  cost elements given a cost center “controlling – cost center accounting – information systems – reports for cost center accounting – plan/actual comparisons  ”
    Thank you

  • Report Painter Request - Cost Center and WBS Element

    Hi Everyone,
    Currently, my company settles all project related expenses through to a cost center by way of an internal settlement cost element (category 21).  The issue with this is that when the expense gets to the cost center, they lose all visability as to where the expense originated, such as salaries or travel expense (category 1 cost elements).  We can't switch the settlements to the originating cost element from wbs to cost center just because of the additional data/volume that will cause.  My thought was to create a report painter that can run by cost center but also show the wbs's that settle to that cost center and group the expenses by primary cost element (cat 1).  I'm assuming that there is a way to marry a cost center and wbs element by way of the wbs settlement rule but how would that be done for reporting purposes?  I've seen it done before by way of a nightly job that created sets based on the combination of cost center and wbs but I'm not sure how that was done.  Any advise and examples?
    Example:
    Cost Center:  IT
    WBS: A.0017.01.01 (settles to cost center IT)
    Postings made:
    1.  CC IT and CE 552000 "salaries"..............................$20,000
    2.  WBS A.0017.01.01 and CE 552000 "salaries"........... $5,000
    3.  Settlement of WBS to CC (expenses flow through to CC IT by way of CE 985000)
    I want to run CC IT and see that the account 552000 really shows $25,000 and can be broken down by cost object (CC and WBS by the amounts above)
    Thanks,
    Pete

    Hi Peter,
    I had a similar requirement and used report painter report group 1SHK-002 (in library 1VK).
    I took a copy of the standard and ameneded it slightly, I switched the explode so it occured on the cost center not cost element.
    The report runs so that direct costs on the cost center are shown at primary cost level. And values settled to the cost center are shown on the partner object. In your case i guess WBS Elements (Partner ObjType WBS).
    Now in my case I didnt need cost element breakdown on partner level, just on cost center so effectively I have(sorry for text alignment but I hope you get the idea):
    GL1   .............  100
    GL2   .............  250
    + Cost center1 total ....350
    GL3 .............   50
    GL4 ............. 100
    + Cost center2 total.... 150
    Primary Cost Total ..... 500
    X-YZ-1.200 .............   50
    X-YZ-1.400 ............. 100
    + WBS total ............. 150
    IO 1............. 100
    IO 2  ............. 100
    +IO total  ............. 200
    Partner Total............. 350
    Overall total .............  850.
    Its not exactly like your requirement but it might be a good report for you to work with to get what you need.
    Elaine

  • COPA derivation for thecombination of Cost center and Cost element/GL accou

    Hi Gurus,
    In COPA derivation using KEDR i am trying to make a derivation for the
    combination of Cost center and Cost element. Here i got following problems
    • While posting FI document using t.code FB50 system not automatically
    updating the fields Cost center and cost element in Profitability
    segment. Hence system not posting COPA document. How can i make this
    derivation? Is there any note should i apply regarding these.
    • How can i create cost element as characteristic.
    • If i configure derivation for the combination of Cost center and cost
    element will it be posted with copa document for postings or automatic
    postings from MM,HR and FI
    Pls provide me solution at the earliest.
    Thanks and Best regards,
    Dhanumjaya.Ranga
    Mobile: - 919940093579
    Mail : [email protected]

    Hi Murali
    Thanks for update
    I explain my req clearly
    For me segment is Distribution channel field (EXPORT and DOMESTIC)
    If GL account is 1000-2000     always                      Export
    If GL account is 2001-3000    and Cost center is     X then Export.
    If GL account is 2001-3000    and Cost center is     Y then Domestic.
    Based on above REQ i am making derivation using KEDR T.code.
    These postings should work for all modules postings such as MM, HR also.
    Actually this should work automatically and after saving the transaction we should have copa document also.
    But problem is in source fields of derivation we have GL account (HKONT) and Cost element (KSTAR). I am making derivation using either of these.
    But after posting document system not giving COPA document.
    I found the reason is  at GL postings we are giving input to GL account (HKONT) but we took in KEDR source field as GL account (SAKNR). GL account (HKONT) is not updating GL account (SAKNR) field in PSEG screen in Fb50. Even i try with cost element (KSTAR), GL account (HKONT) is not updating this in PSEG screen in fb50.
    If GL account (HKONT) updates either GL account (SAKNR) or cost element (KSTAR) at the time of posting FB50
    Or
    If we have the field GL account (HKONT) as source field in KEDR i hope my problem
    Get solved.
    If you want further info pls give me your mobile number then i ll call you

  • How to assign cost center to cost element.

    Hello,
    Can any one please guide how to assign cost center to cost element.
    Thanks in Advance..
    Have a nice day...

    Hi ,
    There are 3 ways :
    1. Default the cost center in cost element - Ka02 - account assingment tab enter cost center .
    2. Use OKB9 for diffrent combinations as per your requirement .
    3. Use GGB1 for substituting the cost center based on some conditions .
    Regards ,
    Dewang T.

  • Cost Center Assessment to COPA

    Hi,
    I have done Cost Center assessment to characteristics "Company Code" and "Product". System has even generated COPA documnet for costing based profitability analysis.
    However, in report developed through Report Painter(KE32), the value field for which the assessment got posted is not getting displayed.
    Can any one guide in this regard.
    Thanks in advance
    Sudhakar

    Hi Sudhakar,
    When you do the cost center assessment in COPA, you have given 2 characteristicsi.e product , company code and thru one value field.
    When designing report in ke32 (report) and form ke35(form), we will give certain characteristics, so check what are the parameters has been given in the report, bcz values flown thru copa assessment will be available only in compaby code and product not for any other characteristics. I guess you have characteristics in report other than these two.
    I hope this clarifies.
    Regards
    Rajesh A

  • Cost center and cost element display through report painter/writer

    Hi
    Can any one suggest me how to display both cost center and cost element in the output of a report painter.
    Presently --- I am able to display cost center and its cost elements in the same leading coloumn and its periodical values for 16 consecutive col.s.
    Help Needed --- Suggest how to display cost center and cost element in the output of the report along the periodic values.
    Thanks
    Tangudu

    Can any one share some advice on this above query.
    Thanks
    Tangudu

  • Cost Center Budget-Cost element wise

    Dear SAP Gurus,
    My client needs to create cost center budgets cost element wise. For e.g. Salary paid (code 430000) in Development Cost center (code 9901).
    We now use KPZ2 to create cost center budgets and KP06 for cost element planning. Kindly guide.
    Regards,
    Siva

    Hi Ramesh,
    Thank you for the reply. I did suggest them to use KP06 but they require some sort of validation when posting an expense (cost element) to and cost center.
    For e.g. If the travel budget for Marketing cost center is $1000, they need the system to prevent posting once that amount is exceeded.
    Any help in this regard would be appreciated.
    Regards,
    Siva

  • Cost Center and Cost Element Hierarchy and Actual Cost Center

    In Bex - Right now I am displaying Cost Center and Cost Element hierarchy with 12 months of data. I want to display the actual Cost center number next to cost element hierarchy - Can I display in Bex?
    Tried to with Structure creating formula variable for Cost Center using replacement path - didn't work. Can you please suggest me how i can achieve this?
    The format should be
    CostCenter H1   CostElement H1   CostCenter   Jan  Feb ...
    Thanks in advance and appreciate for any help...

    Let me explain it clearly and hope it is clear now...
    Designed the report as like this - Cost Center Hierarchy by Cost Element Hierarchy for 12 months of data. But Business agian search in R/3 for actual cost center numbers based on above two hierarchy nodes.
    I am trying to achieve this Bex instead of going back to R/3 - so that they can understand how the dollar amount is summed up on which major cost centers.
    If I remove the hierarchy on Cost Center - it will display all the cost centers. They want to see the Cost center numbers based on CC and CE hierarchy node so that you are displaying only those cost centers. That's the reason I am trying to design the  report with CC Hier, CE hier, Cost Center number and 12 months of data.
    In my data model - have only one Cost Center, if i can create another ZCOSTCENTER same as 0COSTCENTER - May be I can achieve this. still looking for options with out changing the design.

  • Cost center Vs cost elements

    can any body give examples for Cost center groups, cost centers and cost elements..
    Assigned poits..

    hi
    Cost Center Group
    Definition
    You can collect cost centers according to various criteria into groups. This enables you to use cost centers to depict the structure of the organization in the SAP System.
    Use
    You can use the groups to build cost center hierarchies, which summarize the decision-making, responsibility, and control areas according to the particular requirements of the organization. The individual cost centers form the lowest hierarchical level.
    There must be at least one group that contains all cost centers and represents the entire business organization. This cost center group is described as the standard hierarchy. You can assign more cost center groups to the standard hierarchy.
    You can also create any number of alternative groups. You can structure these, for example, according to organizational and/or functional viewpoints. Cost center groups enable you to perform evaluations for each decision-making, responsibility, or control area. They also support the processes during planning and internal allocations.
    You can assign each cost center to only one group in the standard hierarchy, but to as many alternative groups as you require.
    cost element  
    Classification of the organization's valuated consumption of production factors within a controlling area.
    Each cost element corresponds to a cost-relevant item in the chart of accounts.
    Cost centre:
    You receive an overview of the actual and plan values, or the actual and target values with the corresponding absolute and percentage variances. The reports also display the fixed and variable portions of the actual, target, and plan costs as well as the actual and planned.
    The Cost centers: Actual/Target/Variance report is structured by cost centers. The posted cost elements are listed for the selected cost center group or cost center.
    The Area: Cost Elements report is structured by cost elements. For each cost element selected, the system displays the corresponding cost centers.
    nagesh

  • Concept of CO- PA cost center assessment

    Hi Experts,
    I would like to ask if you could supply me with more info about the concept of cost center cost assessment in COPA. Is this a standard procedure that must done? I am having my 1st SAP implem. and have been preparing too hard to get much info. as I can take about COPA. I have understanding about value fields an characteristics BUT I am having a hard time to understand cost center allo. and why do is there a need to do it (or maybe not). Aren't they supposed to be an automatic process (distribution of figures to COPA reports)? Thanks and I would understand if the question may sound a little unclear.

    Hi,
    The cost center assessment to copa comes in places only for allocating the common costs.
    Generally, we do allocate the common costs from the common cost center to the respective user cost centers in the overhead accounting.
    If the need is to recognise the common overheads directly in COPA, then instead of reallocating the costs with in cost center accounting, we directly transfer the costs to copa thru costcenter assessment to copa.
    Regards
    Sudhakar Reddy

Maybe you are looking for

  • Can not Login into iMessage!

    I cannot login into iMessage and get this error: "Your Apple ID "*******[email protected]" can't be used to set up iMessage at this time. If this is a new Apple ID, you do not need to create another one. To use this Apple ID with iMessage, contact iM

  • Forms deployment in 10gAS(10.1.2.0.2)

    hi all, i want to deploy forms in new production system 10gAS(10.1.2.0.0) throught vendor portal. can anyone please provide me step by step information and any links or material on this. Thanks

  • Incorrect number

    When I try to add the number it tells me that it is incorrect but it is the exact number that shows up on the caller ID. Does it need dashes or spaces?

  • Does SQLDeveloper license allow for redistibution?

    Hello, is the license for SQLDeveloper the same "free to develop, deploy, and distribute" as Oracle Database XE? Specifically, would it be within the license terms to include a working copy on a remastered Linux installation cd with connections/prefe

  • I tried updating Photo Shop but it says, "Errors, please try again or contact support."

    I try updating and I hit learn more and it says Download errors, Press retry to try again or contact support, I need to download Photoshop.