Cost center for Production Order

Hi all,
     We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
With Regards,
R.Mahendiran.

Hi,
     Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
To understand the difference
201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
Hope this clarifies your doubt.

Similar Messages

  • Coste Center for Production Order

    Hi all,
    Can anyone please provide me the table details, which stores information on cost center for the PP orders and PM orders.
    Thanks in advance.
    Regards
    Prashant

    AFPO
    AFKO
    AUFM
    regards

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Settlement of Cost Center And Production Order Variance

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • Cost center Vs production order dates

    Hi,
    When the cost center will be posted in a production? Actually i have a work center, that has 2 cost centers with different validity dates..? how to find out which cost center is valid for that production order..? based on which date in the production order..? Kindly clarify.
    TIA
    Sabitha

    Hi Sabitha,
    It is based on the scheduled date range of operation in production order
    Best regards,
    Kalyan

  • How to get the cost center of production order

    hi guys
    please tell me how i can get the cost center of the production order. 
    thanks.

    You need AUFK-KOSTL ?
    Pole

  • Standard Vs Actual Cost report for Production Order

    Hi Expert,
    I have an requirement that i need report for Standard Cost (CK40N) and Actual cost (261 Movement) for multiple production order or Multiple Material.
    Please suggest standard report if available or FS for creating Z Report.
    Regards,
    Pranav

    Hi Pranav
    There are Standard reports
    Option 1
    You can use Product Drilldown reports in KKO0
    For this:-
    a. Do settings in OKN0 - assign a Cost Comp Structure and Choose Material group = Product Group
    b. Run KKRV to collect data and then use KKO0 reports
    I have replied this in SCN many times.. You can search here. Just google as "SCN" "Ajay Maheshwari" "OKN0" and you can see some posts answered by me
    Option 2
    You can use Summarization Hierarchy KKBC_HOE
    For this
    a. Set up Summ Hierarchy in KKR0.
    b. Run KKRC
    c. Run KKBC_HOE report
    Br Ajay M

  • Assessment of Cost center to Production orders

    Hi,
    I would like to run assessment of overhead costs of Production Departament to production orders.
    However, I get such warning message when creating the cycle:
    "System error: An invalid transaction was used to check whether or not a business transaction is allowed.  The transaction Assessment of Overhead costs is not allowed for object type 'Production order'"
    "You cannot carry out the requested function for object ZL. 10000001.
    Procedure
    Please contact your system administrator."
    What settings are needed to allow assessment to production orders. I heard that it is possible to make an assessment of CC to production orders.
    Best wishes,
    Karol

    Hi,
    I managed to activate assessment to Production orders in BS12.
    I activated business transactiun RKIU for PP orders object.
    Now it's possible to allocate costs from Production Department CC to production orders.
    However, I have some problem of other nature.
    When I do the standard price calculation - the Overhead costs from Production Departament CC are calculated as % overhead using costing sheet. It is done by cost element with cost element ctg 41.
    The actual Production Departament CC overheads are allocated using assessment. Other cost element with cost element category 42 is being used here.
    How will the system calculate production variances in this case?
    Do u think it is possible to match these two different cost elements?
    Will this CE with 41 ctg be considered during variances calculation and if yes - which variance category will it be.
    I am uncertain about that, cause in normal cases - activitity CE or materials consumption CE are the same in actual and target. In my case overhead CE are different in actual and in target.
    Can u help me with that?
    Best wishes,
    Karol

  • Error in cost calculation for production order

    Dear All,
    I got error of cost calculation while release of Production Order due to price of some material is not mantain .
    What will happen if I release , save the Order with error & do Good Issue ???
    Ishwar

    Dear Ishwar,
    Check the log's created for costing and rectify the same.
    I feel its better to rectify the cost related errors and then release the production order and proceed to Good's Issue.
    Check whether there is a MAP for all the Raw-materials and an origin group in costing 1 view.
    The Finished product must be having a standard cost estimate that's valid for the current period.
    Revert back in case of any more help needed.
    Regards
    Mangalraj.S

  • Work center for Production order

    Hi,
    In my report I need to link the production order to work center. I have got all the information for the production order from AFKO, but I am unable to find a way to link it to the work center?
    Thanks
    Vamsi

    Hi Vamsi,
    Refer value AFKO-AUFPL, Use AFVC-AUFPL to fetch the operation details of an order. Fetch AFVC-ARBID for AFVC-AUFPL, use CRHD-ARBID to get Work center details.
    Regards,
    Prasobh.
    Award your marks, if this has helped you.

  • Material cost charge to Production Order from Cost Center / Work Center.

    In Production Order Environment, is it possible that goods are issued from Storage location to Cost Center / Work Center, and in turn charged to Production Orders.
    Scenario. Transformer Manufacturing.
    Production Order size : 100 Units
    Steel (Kgs) per Transformer : 3 Kgs
    Total Steel required for Production Order: 300 Kgs (100x3)
    In the process of manufacturing of a Transformer Steel or Core winding is the first process step.
    Even though the Steel required for above said Production Order is 300 Kgs, the minimum issuable lot size from stores is 2000 Kgs.
    Is it possible in SAP ECC 6.0 that the Steel of 2000 Kgs is issued to a Cost Center / Work Center, and later charged to production order based on actual Consumption in the said Cost Center / Work Center.
    Regards, Replies and Sugestions shall be appreciated
    Madhu

    Thank you for the reply,
    However, the scenario that i had in mind was a bit different from what you had conceptualized.
    Scenario - These transformers are basically for loading on to Inverters & UPS, The max weight of the transformer range from 15-30 Kgs. and they dont have an external casing of steel as seen on Indian Electricity Board transformers. Multiple production orders are processed at a single time in the Plant as per Customer specifications.
    The general process followed for manufacture is as follows:
    1. Core Winding u2013 This process takes place in the core winding department. Steel reels are loaded on to Winders and individual cores of approx 5 u2013 30 Cm Diameter are produced. (Multiple reels of Steel are stacked one on top of the other onto a pallet.) Usually issue of steel from stores happens pallet wise. The pallets of steel generally weigh in excess of 2 tons.
    In the present situation (Non SAP Environment) the entire pallet of Steel is issued to the Core winding department and later the Output is charged to multiple Production Orders, based on the records of the Core winding dept. Since in general the steel content in the FG ranges from 3- 25 Kgs multiple Production Orders can be catered to from one Pallet of Steel.
    2. Core Laithing. The wound cores are laithed so as to make the sides smooth.
    3. Core Annealing u2013 Heat treatment process.
    4. Core Insulation. u2013 Insulation of the annealed cores with insulating material.
    5. Primary Winding. u2013 Copper is wound as per the BOM Specification. The issue like that of Steel also arises in the Copper winding process. Here also the Cooper comes in Spools which far exceed the requirement for any Production Order. The minimum issueable lot for Copper from Stores is one Spool. The current practice followed is that the Cooper is taken in the name of the Copper winding department and later charged to individual Production Orders.
    6. Primary Soldering.
    7. Mid Insulation.
    8. Secondary Winding
    9. Secondary Soldering
    10. Shielding
    11. Final Insulation u2013 Same issue with insulation too, since the insulating material comes in rolls.
    12. Testing.
    13. Potting & Drilling - Process of pouring a chemical compound in the center of the transformer, which helps the transformer to later be loaded on an Inverter. The same issue with like of Steel, Copper & Insulation arises here too, since the chemical compound comes in big containers capable of meeting production requirement for a week.
    14. Packing
    15. Transfer to FG Inventory.
    One of the suggestions was to issue the entire 2000 Kgs to the Production Order and then return 1700 kgs after completion of the Production Order based on actual usage. However, in my opinion this option might not be practicable because, assuming that I get another / multiple Production orders in between the issue of 2000 Kgs and return of 1700 Kgs, issue to the new Production order will not be possible if the stock in stores was only 2000 Kgs initially. In case assuming that the material is available in stores for the next production order, the situation could worsen in case of receipt of multiple production orders.
    Hope, I have explained the scenario & issue being faced.
    Regards
    Madhu

  • Report Writer Missing Data for Cost Center+Investment Internal Order

    Hi Gurus,
    I have met a problem on Report writer. T-code KSBB -> Report for Cost Center Group by Cost Elements in diff months.
    The report can be drilled down to call KSB1 to give line items on the cost element by cost center/group.
    The problem is the drill-down report missed the line items for investment orders. ( Compared with manually use KSB1)
    The overhead internal order line items are fine.
    For example, document 001-Apr:
    Dr. Cost Element 1009                 $900  -- BA 90  Cost Center 90000 Investment order 9001
         Cr. Other cost elements.                  $900
    Document 002-Apr
    Dr. Cost Element 1009                 $800 -- BA90 Cost Center 90000 Overhead order 7001
         Cr. Other cost elements                      $800
    In KSBB report, the cost center group for 90000 in cost element 1009 in Apr only has $800.
    And the drilled down report which called KSB1 has the line item for docuemnt 002.
    However, when I run KSB1 directly, the total amount for cost element 1009 in cost center 90000 is $1700.
    Here is what I checked:
    1. I have my ABAPer checked the KSBB program and KSB1 program to debug them in DEV ( DEV and PRD has the same problem). The different to get the data is that in KSB1, it has selected a value type 11 ( Googled: field name is WRTTP, Down payments as expenses. In program: WRTTP means Statistically Actual ) and 04 ( Googled: Actual True Posting. In program: 04 in WRTTP means Actual posting).
    But in KSBB, it only select 04 when I clicked the drill down report to call KSB1.
    2. I am thinking that the cause was on different types of internal order:
    Overhead internal orders are statistical orders.  Investment orders are actual orders.
    Could you help to throw some light on the problem?
    Thank you very much.
    Emma

    Hi,
    Cost Centre vise Report you can take from KSB1
    Internal Order Vise Report you can take fro KOB1
    Regards,
    Sridhar Sha

  • Direct GRN (non order items) to cost center for Non Stackable Materials

    Hi All,
    We can do direct GRN (non order items) to cost center for Non Stackable Materials.
    If it is possible.Please advice me
    Thanks In adance

    Hi,
    Your question is not clear.
    Ok.
    If you want to issue goods to cost center you can use 201 movement type.
    If you want do create automatic PO in back ground during goods receipt, you can do it with customization. For automatic PO creation during goods receipt, you can search in SDN, you can get the answer.
    Regards,
    Biju K

Maybe you are looking for