Cost center in miro

Hiii experts... user are trying to post through miro... made config in okb9 BA vise and gave 2 Ba and 2 cost centers to it..now when the user is posting in BA 2 .. its still catching BA and CC of plant 1.. i will provide u the screenshot of OKB9... please guide me ..

Reason and Prerequisites
This is not an error.  This is the intended system behavior. In a document, it is possible to post to several plants (valuation levels), to several materials (profit center) or business areas.  As a result, a unique assignment of automatically generated lines without reference to an item for a valuation level, for a material (profit center), or for a business area can generally not be found. Therefore, the system must always take the automatic account assignment for transaction keys such as these at a higher level.
Example:
For the transaction for differences due to exchange rate rounding, a G/L account is specified that is defined as a cost element. When you enter a document in the invoice verification (MIRO and MR01), the system issues error message KI 235 "Account & requires an assignment to a CO object". The system also issues this error message if an account assignment is stored at the "Detail per business area/valuation area" level or "Detail per profit center" level in transaction OKB9. This detailed account determination works only with a unique reference to a document item. This unique reference is not possible in the case of the automatically created lines (KDR, DIF, UPF, KDT) because they reference the entire document.
Solution
You can define an account assignment for the transactions (KDR, DIF, UPF, and KDT) only at the highest level in transaction OKB9 (view: "Default Account Assignment"). However, you cannot do this at detail level.
Check above data ,which is mentioned note. It may be the case for you

Similar Messages

  • How to make the manual entry of cost center in MIRO

    Hi
    In MIRO, Cost center field is not populating for the PO without material and with the account assignment project P. I want the cost center to be populated in the MIRO screen.
    In OLMRLIST screen cost center tab is not fixed. Once the cost center populates in the MIRO i can fix it.
    Please let me know the detailed procedure of how to make the manual entry of the cost center in MIRO?
    Raja

    Hi,
    If the PO is Account assigned PO then in MIRO you need to select the Layout as Account assigned -Costcentre, the system will change the Layout of the MIRO.
    So on the line item of MIRO you will find the Account assignment arrow mark (just move rightside of the MIRO line item) press this arrow mark,
    then system will take to other screen where you can enter the Manual entery to the Cost centre along with G/L account in MIRO
    hope this solves your problem. To enter the cost manually you need to select the Layout as Account assignment -- Cost centre.
    rgds
    Chidanand

  • Automatic input of cost center in MIRO

    Hy everybody,
    I've done a substitution maintenance for automatic cost center input depending on the store of the purchase order and/or the store of inbound delivery. Everything is allright.
    Now when I go to the tc MIRO and I've a different amount between the purchase order and the bill : I'can automatically input the cost center.
    Thanks for help

    Thanks for your answer,
    the amount I want to input to the cost center when I've done the MIRO, is the recording of the new value of the stock, generated by the new price.
    The final issue is I want to have a stock valuation by Store witch are the profit center. So I use the cost center to do that, maybe I'm wrong ?
    stéphane
    Message was edited by:
            PARISIS Stéphane

  • Cost Center in MIRO and MIGO

    Hi All,
    1) A PO is created with one line item on cost center 10010.
    2) Discount condition of 10% is used in CONDITIONS
    3) On doing MIGO, material is charged on 10010 while discount line item is charged on 10020 as defined in OKB9
    4) On doing MIRO, both material and discount line is charged on 10010
    Is there's something missing in MIRO as discount line should be charged to 10020 rather on 10010?
    Looking forward to resolve this issue.
    Warm Regards,
    Nayab

    Hi Raghavendra,
    Thanks for your response.
    As per the configuration,
    I have a PO of Single Item.
    In Item Details I have used Cost Element 900102 & Cost Center 10020 in Account Assignment Tab and
    Condition of 10% discount is used in Conditions Tab.
    When I do MIGO, I get the following entries
    Expense Account   900102 agains cost center 10020
    Discount Account   900106 against cose center 10055
    GR/IR Account 400203
    Cost center 10055 is derived as cost element 900106 is assigned this cost center in KA03 as well as OKB9
    When I do MIRO, following entries are the result
    Vendor Account 55252
    Gr/IR Account 400203
    Discount Account 900106 against cost center 10020
    This cost center should be same as in MIGO due to configuration in Master Data (Txn KS03)
    or cost center in MIGO should be same as in MIRO (i.e. derived from the PO)
    If I put no cost center in KS03 (master data) or OKB9 against 900106 cost element, it prompts to assign CO to this account while doing MIGO.
    Looking foward for assistance in resolving this issue.
    Warm Regards,
    Nayab

  • Exit to change cost center in MIRO?

    Hello , i wish to modify my cost center when the document is being saved.what exit can i use?

    Yes use,
    - [EXPORT obj1 ... objn TO MEMORY ID key|http://help.sap.com/saphelp_45b/helpdata/en/34/8e73a36df74873e10000009b38f9b8/frameset.htm]
    - [IMPORT obj1 ... objn FROM MEMORY ID key|http://help.sap.com/saphelp_45b/helpdata/en/34/8e73aa6df74873e10000009b38f9b8/frameset.htm]
    Also perform a plausability check in the FI substitution to insure that this data will only be used once. (check EBELN or such field)
    Regards,
    Raymond

  • Exchange rate difference KDM in MIRO - cost center used

    We have recently testing to setup KDM Exchange rate difference posting in LIV and encounter the problem of cost center cannot be determine for PO with account assignment A (For asset) and P (for Project).
    The question is how does the system determine the cost center for the exchange rate different account? It doesn't take the default cost center from the configuration in OKB9 but extract the cost center from PO Account Assignment - for Asset Account assignment, there is no cost center in PO and thus it is giving a error of 'Field Cost Ctr is a required field....'
    Any help appreciated.

    Dear Murali: Yes, GL account is maintained in OBYC for KDM transaction, I am following the OSS note 980402 for the setup (ECC6 system). The GL account say is 60000005. In OB09, we have maintained the entry for this account 60000005 to have a default cost center (e.g. 1000). This cost center does not get defaulted when MIRO posting is done with exchange rate difference. Instead, the cost center is obtained from the PO (e.g. the account assignment in PO have cost center 5000). But for certain account assignment (e.g. 'P' for WBS and 'A' for Asset), there is no cost center maintained in PO account assignment and thus in MIRO i get an error message as mentioned above.
    Dear SAPFICO: check the asset master also, althrough there is a cost center in Asset Master, it does not get extracted into MIRO postings.

  • Cost Center in automatically created line items in MIRO

    Hello SAP Gurus,
    While doing MIRO cost center is getting picked automatically in Tax line item even though there is no automatica account assignment in OKB9.
    Is it coming from validation or substitution? Please advise h

    Hi Ravi,
    Thanks! Yes it was assigned in Cost Element Master data.
    Now I have removed it. But now how can I assign internal order while posting to that GL in MIRO. I know we can assign default internal order in cost element but I don't want default account assignment.
    The GR/IR line item is picking internal order no from PO but the tax line item is not picking internal order. Is there any way we can change the line item of MIRO while simulation.
    Regards,
    Tapan

  • MIRO Cost Element error for Cost center

    Hi,
    When i am doing MIRO - there are some price variances. System is giving the error to maintain the Cost center for that price differance cost element.
    But i have already maintain the Cost center for that Cost element in OKB9 Transaction. Why the system is asking for Cost center assignment again?
    Kindly help me
    Thanks
    Sunil

    Hi Sunil,
    Maintain the OKB9 settings with valuation area mandatory and dont give business area in the sub-sequent screen. Maintain only Valuation area and Cost center. It will not give any error and it will pull the cost center from OKB9.
    Thanks
    Kishore

  • In MIRO the cost center is filled at Balance Sheet

    Hi,
    Iu2019m using ECC 6.0 and my problem is during MIRO posting the cost center is filled at Balance Sheet.
    How can I avoid this?
    Best regards,
    SS

    Please close this thread.Post it in [ERP Financials |SAP ERP Financials; to get responses.

  • How to enable cost center field in MIRO-SIMULATE screen

    Dear experts,
        In MIRO transaction code when we enter inputs and if we click on 'SIMULATE' button in application toolbar, one window will appear.
    In that i need to enable COST CENTER field.
    I tried in screen variant, in that the options w.content, output only, Invisible and required only was there.
    Is there any other option to enable that field.
    Help me.
    Its high priority issue for me. Please help me if it is possible or not?
    Edited by: Prabu S on Mar 3, 2010 11:37 AM
    Edited by: Prabu S on Mar 4, 2010 6:40 AM

    Hai i tried exits. But we dont have option for enabling screen field.
    Please help me any enhancement is possible for this.
    Thanks,

  • Payment method and cost center validation check in MIRO while save or simul

    Hi,
    I want to put a validation check between payment method and cost center while posting MIRO against PO (MIGO done) . If my payment method and cost center matches then system should allow that entry otherwise should popup a message .
    We tried this with user_exit - EXIT_SAPLMRMP_010 enhancement LMR1M001 .
    But thing is it is not getting triggered at all either at the time of simulation or at the time of saving . We are also looking into BADI - update_invoice .
    Any body having any idea on this please share.
    Thanks

    Hi,
    Please don't open multiple threads for the same question..Please close this one..
    THanks,
    Naren

  • Cost Center in populating in GR/IR Clearing Account at MIRO Posting

    Hi,
    I am working in 4.7 EE version. We created one Service Order(purchase order) and gave account assignment as Cost Center and Business area. Then we created service entry sheet wrt to service order and accepted the service enry sheet. System automatically created MIGO document in back end. At the time of posting Invoice Verification wrt service entryshee/service order (purchaseorder), system is populating cost center in GR/IR clearing account.
    Give me some idea how the cost center is populating in Balance Sheet GL A/c (GR/IR Clearing A/c).
    Regards
    Sudhakar

    hi
    i think d havnt tried the tcode i had given
    it is to attach the cost element account to the costcenter
    it  is understandable for a  sap consultant that we can`t  assign gl account to the cost center
    i think u have not tried the solution so plz dont make any comment on any ones experiance
    ur required help and i tried to help u
    this is not the way to talk with anyone
    use ur own logic before asking questions and also replying for answers
    sorry for helping u
    kunal

  • COST CENTER CHANGES FOR OPEN PO REQUIRE BEST APPROACH HOW TO DO IT

    Dear All,
    we are changing the cost center for open PO's kindly tell us the best approach how to do it for all open PO's line items for open PO's are 4000.
    we will totally block the old PO's and change the PO's with NO GR and IR immediately, but what and how to do for if there are GR, IR, or one of them their. and also what if IR and GR differences are thier, kindly provide all the best possible approaches.
    below are the scenarios.
    Open PO without GR/IR
    Open PO only with GR
    Open PO only with IR
    Open PO with IR/GR without difference
    Open PO with IR/GR with differences
    Service entry sheet
    kindly provide me all the best approaches to achieve this task. keep in mind beside reversal of GR or IR any other approach.
    qsm sap
    Edited by: qsm sap on Feb 15, 2010 12:08 PM

    Hi,
    Open PO without GR/IR
    Open PO only with GR
    Make Acct assigment as changeable at time of IR in SPRO for Acct Assigmet 'K' ...so that u can change the cost Center while doing MIRO. if u do not want to go with mass change.
    Service entry sheet
    You can change Cost center while Doing SES. No issue
    for others... reverse the IR as one option.
    Regards,
    Pardeep Malik

  • COST CENTER CHNAGES FOR OPEN PO"S BEST APPROACH

    Dear All,
    we are changing the cost center for open PO's kindly tell us the best approach how to do it for all open PO's line items for open PO's are 4000.
    we will totally block the old PO's and change the PO's with NO GR and IR immediately, but what and how to do for if there are GR, IR, or one of them their. and also what if IR and GR differences are thier, kindly provide all the best possible approaches.
    below are the scenarios.
    Open PO without GR/IR                    
    Open PO only with GR                    
    Open PO only with IR                    
    Open PO with IR/GR without difference          
    Open PO with IR/GR with differences          
    Service entry sheet
    kindly provide me all the best approaches to achieve this task.
    qsm sap

    Hi,
    Open PO without GR/IR
    Open PO only with GR
    Make Acct assigment as changeable at time of IR in SPRO for Acct Assigmet 'K' ...so that u can change the cost Center while doing MIRO. if u do not want to go with mass change.
    Service entry sheet
    You can change Cost center while Doing SES. No issue
    for others... reverse the IR as one option.
    Regards,
    Pardeep Malik

  • TAX code requires default cost center

    Hi,
    There is an error coming while posting the MIRO Invoice with tax code ( need to be charge to PL Account) " put the cost center " for GL Account for tax code. This is  a cost element & hence requires cost center but the field for entring tax posting. Issue we are facing is that we are forced to default the cost center as screen is not input enabled(greyed) for cost center in tax calculation screen & it is also not picking up the cost center from purchase order screen.
    Need to know any solution for this issue.
    Regards,
    Vipin

    Hello,
    Kindly refer to the thread to resolve your issue here.
    Table for user attribute data
    Thanks & Best Regards,
    Rahul

Maybe you are looking for

  • Optical drive is no longer recognized

    Disc burner or software not found

  • Impact of Cost component structure on PA Transfer structure in SAP

    Hi All, We were using a single Operating concern and Controlling area for existing company codes. Now, we got a new company to be created all together a new company with the same chart of accounts. 1. We have created Operating concern, COA, Company c

  • Practical universe schema design for ad hoc reporting in web intelligence

    Hello Folks, I am in the initial design phase of creating a universe out of normalized tables in oracle database. This current set of table are outside our data warehouse methodology and work flows. The new Universe will be used for ad hoc query by l

  • Media encoder shows timeline as "footage offline" help?

    so i just reformatted my HD, and loaded on windows 8.1 last night,. i got CC 2014 installed again. so i import some avchd footage into PrPro, set up a new timeline, and i edit teh gfootage, looks fine. choose to export, i am able to see the preview i

  • CS2 Plug-Ins Works in CS3 ?.

    Dear All, Here I have created the Small Plug-Ins in CS2, Is it Possible to work in CS3?... Could you please give me the Great Solutions... Yes! I have created the "Anchored Id" generation Plug-Ins... Its most useful for us.... So Is it Possible to us