Cost center Vs production order dates

Hi,
When the cost center will be posted in a production? Actually i have a work center, that has 2 cost centers with different validity dates..? how to find out which cost center is valid for that production order..? based on which date in the production order..? Kindly clarify.
TIA
Sabitha

Hi Sabitha,
It is based on the scheduled date range of operation in production order
Best regards,
Kalyan

Similar Messages

  • Settlement of Cost Center And Production Order Variance

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

  • How to get the cost center of production order

    hi guys
    please tell me how i can get the cost center of the production order. 
    thanks.

    You need AUFK-KOSTL ?
    Pole

  • Assessment of Cost center to Production orders

    Hi,
    I would like to run assessment of overhead costs of Production Departament to production orders.
    However, I get such warning message when creating the cycle:
    "System error: An invalid transaction was used to check whether or not a business transaction is allowed.  The transaction Assessment of Overhead costs is not allowed for object type 'Production order'"
    "You cannot carry out the requested function for object ZL. 10000001.
    Procedure
    Please contact your system administrator."
    What settings are needed to allow assessment to production orders. I heard that it is possible to make an assessment of CC to production orders.
    Best wishes,
    Karol

    Hi,
    I managed to activate assessment to Production orders in BS12.
    I activated business transactiun RKIU for PP orders object.
    Now it's possible to allocate costs from Production Department CC to production orders.
    However, I have some problem of other nature.
    When I do the standard price calculation - the Overhead costs from Production Departament CC are calculated as % overhead using costing sheet. It is done by cost element with cost element ctg 41.
    The actual Production Departament CC overheads are allocated using assessment. Other cost element with cost element category 42 is being used here.
    How will the system calculate production variances in this case?
    Do u think it is possible to match these two different cost elements?
    Will this CE with 41 ctg be considered during variances calculation and if yes - which variance category will it be.
    I am uncertain about that, cause in normal cases - activitity CE or materials consumption CE are the same in actual and target. In my case overhead CE are different in actual and in target.
    Can u help me with that?
    Best wishes,
    Karol

  • Coste Center for Production Order

    Hi all,
    Can anyone please provide me the table details, which stores information on cost center for the PP orders and PM orders.
    Thanks in advance.
    Regards
    Prashant

    AFPO
    AFKO
    AUFM
    regards

  • Report Writer Missing Data for Cost Center+Investment Internal Order

    Hi Gurus,
    I have met a problem on Report writer. T-code KSBB -> Report for Cost Center Group by Cost Elements in diff months.
    The report can be drilled down to call KSB1 to give line items on the cost element by cost center/group.
    The problem is the drill-down report missed the line items for investment orders. ( Compared with manually use KSB1)
    The overhead internal order line items are fine.
    For example, document 001-Apr:
    Dr. Cost Element 1009                 $900  -- BA 90  Cost Center 90000 Investment order 9001
         Cr. Other cost elements.                  $900
    Document 002-Apr
    Dr. Cost Element 1009                 $800 -- BA90 Cost Center 90000 Overhead order 7001
         Cr. Other cost elements                      $800
    In KSBB report, the cost center group for 90000 in cost element 1009 in Apr only has $800.
    And the drilled down report which called KSB1 has the line item for docuemnt 002.
    However, when I run KSB1 directly, the total amount for cost element 1009 in cost center 90000 is $1700.
    Here is what I checked:
    1. I have my ABAPer checked the KSBB program and KSB1 program to debug them in DEV ( DEV and PRD has the same problem). The different to get the data is that in KSB1, it has selected a value type 11 ( Googled: field name is WRTTP, Down payments as expenses. In program: WRTTP means Statistically Actual ) and 04 ( Googled: Actual True Posting. In program: 04 in WRTTP means Actual posting).
    But in KSBB, it only select 04 when I clicked the drill down report to call KSB1.
    2. I am thinking that the cause was on different types of internal order:
    Overhead internal orders are statistical orders.  Investment orders are actual orders.
    Could you help to throw some light on the problem?
    Thank you very much.
    Emma

    Hi,
    Cost Centre vise Report you can take from KSB1
    Internal Order Vise Report you can take fro KOB1
    Regards,
    Sridhar Sha

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Costing Error in Production Order

    Hi
    I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
    No itemization available for the corresponding material on the plant.
    Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
    Thanks in Advance.

    Hi
    If you are creating first time production order for the material  using standard price you have to do standard cost estimate  using ck11n
    In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to  and execute..Here only system asks for Itemisation.. Just press enter.
    After that Update standard price using ck24
    mark and release your standard price  for the materail..
    Reward points if useful..
    Regards,
    MSH

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • Change Profit center in production order

    Hi
    In production order , profit center is taken from material master, we need a solution to fetch the profit center from cost center instead of material master, assigned in work center, in production order
    selection  of production line from production version assigned to production order
    Is there any std functionality or enhancements possible ?
    now I am working with this SAP note
    Note 150959 - Profit center is incorrect in production order
    Regards
    Devakumar
    Edited by: Devakumar on Feb 22, 2010 11:27 AM

    Then Go to OBA5 enter the KO  Application area
    Add the 367 message and  your user iD enter warning in online and Batch,
    After that You can able to Change the   profit center in Order with warning message in Order

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Short Dump while executing costing run or production orders

    Hi Guys,
    While executing the costing run or production orders saving, we are getting short dump.  it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
    We have maintained the overhead rates correctly. There is no issue.
    This could be some thing related to OSS notes as well.
    Just wanted to know if it has got something to do with OSS notes or something else.
    Please throw some light in this regard
    Thanks in advance

    Hi,
    In what program there is a dump? I mean, what is the log saying?
    Regards,
    Eli

  • Selection of Costing Sheet in Production Order

    Hi friends,
    I have one query, details of which are as  follows.
    Costing sheet in Requirement Class - Blank
    This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
    Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
    Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
    I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
    When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
    So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
    I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
    Is this system behavior correct as per SAP Standard?
    Kindly advise on the same
    Regards
    Madhusekhar Gupta G

    Hi Madhu
    1. Production order gets coating sheet from the valuation variant assigned to order type
    2. The valuation variant that you assign to Plant is for standard cost estimate only
    3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
    You can assign different costing variant to the same order type per plant
    Br. Ajay M

Maybe you are looking for

  • Can you remove the camera white balance setting in Aperture

    I have a Canon 7D and use Aperture for processing and storing my images. With the Canon I shoot both video and still and frequently adjust the white balance in the camera.  I make a frequent mistake in leaving the wrong white balance setting on - eg

  • Copying a standard text into another text in so10

    Hello Gurus,        I have an issue where i need to track offer letter,i have a standard text which is been automatically used in pb40 while generating offer letter and that is ww-offer-contract in which i need to change the code ( in textid palt )bu

  • Need Help with Transporting Playlists Back to I-Tunes

    If anyone can help with this issue, I would really appreciate it. Here's my situation: After many long hours organizing my playlists on I-Tunes, my pc malfunctioned and I needed a complete software overhaul. Therefore, I have had to reinstall all sof

  • Insert Execute InfoPackage - no data selected

    We had upgraded the BW3.5 to BI7.0 two months ago. Now in QA system, I couldn't insert any InfoPackage from the Process Type 'Execute InfoPackage'. The warning message 'No data selected' occured.

  • How do i save my iMovies to my devices?

    I've made several homemade videos with IMovie and IDVD and I want to view them on my IPad and or IPhone. How do I do that? I have DropBox on my IPad but I don't know how to get it there from my computer.