Cost Centre not popping up in CAT2 transaction

Dear Experts,
I'm new to SAP HR and seems I have missed some entry in maintaining HR master Data (PA30). I have assigned Personnel Number to Enterprise structure and therein I have made an entry for cost centre field as well.
When I go to CAT2 transaction for time recording for this personnel, the cost sentre field does not display the cost centre and is greyed out.
Also I get the error ' Enter sender activity type for cost centre' .
Please help me identify the missing entries.
Regards,
Jyoti

Hi,
Hope the 'cost center not appearing in CAT2' error is resolved by now?
If not, please maintain cost center in IT0315 (Time Sheet Defaults) . You'll see the K in CAT2 time entry screen.
Regards,
Ganabady

Similar Messages

  • Cost centre field needed in down payment transaction F-48

    Dear FICO experts,
    I am using the special GL indicator A. Currently my F-48 transaction contains a mandatory field "business area".  Tried all morning to replace this with an optional field "cost centre". Checked the field status variants G001 and G026 and cost centre is mentioned as an optional field but in the transaction, the field cost centre does not show up?
    Any tips?
    Deb

    Dear Alex,
    Ok I am thinking of an alternative
    Perhaps I could use perhaps FB60 to post down payments by setting "transaction" on blank (instead of invoice or credit memo) and selecting "special GL indicator" to A?
    The only thing now will be to include the special GL indicator A in the matchcode of SGL Ind field in FB60?
    Best regards, Deb

  • Profit Centre and Cost centre not updated

    Hi,
    I have posted expenses through FB60 and assigned cost centre to the expenses account and not for vendor item. Entry passed was posted.
    But when i checked the document, i saw that the cost centre and profit centre is appearing in one line item (i.e. expense line item) only.
    Afterwards i made payment through F-53. In this entry also there was no cost centre and profit centre in vendor line item. But the same was appearing in "outgoing bank" line item

    Hello,
    If you are on classical GL, your vendor line items or customer line item will not be updated automatically.
    If you are on New GL functionality and document splitting, you will have profit center updated on customer and vendor line items.
    Regards,
    Ravi

  • Cost centre not displying in FS10N if cost centre is created with catg 11

    Hi All,
    If cost element is created with catg 11 (revenue) then in FS10N for document cost centre is displaying as Blank. But if Cost element is 1 then Cost centre is displaing in FS10N report. Is there is any solution for it.My customer wants to display cost centre even if cost element is 11. Can any one help/guide me.
    Thanks in advacne.
    Nagendra

    Hi,
    FS10N is totals report; I guess, you mean FBL3N (which is drill-down of FS10N). If the document is posted on cost centre, then it will be displayed. Notice, that cost element 11 (income) is usually posted with another cost object, as it could not be posted only to cost centre, since incomes are posted statistically to cost centres. So, veirfy that the documents in question are posted to cost centre at all.
    Regards,
    Eli

  • Goods issueto any cost centre for 201 mov.type  using Transaction MB1A

    Hi all ,
      our user wants to activate Batch management indicator in material master , but there is stock in current and previous periods , so I suggested as GI the stock to any cost centre  for 201 mov.type in previous  and current periods , then mark the "Batch management indicator " in materail master and later cancel the GI  for 202 mov.type in those periods.
    But , now the stock in previous period is 3500 qty and Current period  is 3000 Qty . If the user try to issue the GI in previous period , system displays error message as "deficit of SL Unrestricted-use 500 qty"
    Please advise how to acheive this.
    Regards,
    Amara.

    start with a 202 and post 500 to your current stock.
    then do 201 to issue3500 in previous period
    then you set the batch management flag
    and do a 202 for for 3500 in previous period
    followed by a 201 to remove 500 in current period

  • How to Find Cost Centre

    I find out Profit centre from Material Master By entering T.code mm03. But how I have to find out cost centre. I can not find out cost centre directly, but by entering the transaction code OBK9 it could be find out manually / or checking individual cost centre to which a particular profit centre is assigned.
    So I want to know how I could find out directly a cost centre when a profit centre is known.

    Are you sure that your MM is using Cost center for imputation.
    If your are using cost center, check the lien items in KSB1, by selecting profit center / cost element and date in your variant. Normally you will see your transaction and you will know which cost center is used.
    best regards
    Stephane

  • Delete cost centre in SAP

    Dear all,
    I have created a cost centre incorrectly, can I ask how to delete this cost centre  in SAP? there areNO transactions posted to this cost centre .
    Many Thanks
    Sunny
    Moderator: Please, search before posting

    Try with KS04 ..
    BR,
    David Sindhu

  • Cost Centre Plan data not updating FAGLFLEXT

    Dear Experts,
    In our production environment, our cost centre plan is not updating FAGLFLEXT table. Profit centre plan using GP12N is fine.
    We are using the New GL and have FIN-CCA and FIN-PCA scenario activated.
    Integrated planning is ticked in the planning versions for both Controlling and New GL Plan versions.
    Controlling plan version and New GL plan version have the same name.
    In table Controlling table COSP, I can see the plan data on business transaction type RKP1.
    I expect to see it in FAGLFLEXT with RKP1 but I see no plan values at all.
    In fact, in the previous 3 environments, we have not had this problem and cost centre plan and actual has updated FAGLFLEXT. Only in Production...
    Any suggestions? Help if you can! Thanks alot,
    Deb

    Dear Ravi,
    I don't think this is the problem.
    It seems that:
    - the CC plan was created -> it updated CO tables e.g. COSP -> no update to FAGLFLEXT
    - the CC plan was deleted -> it updated CO tables with negative value -> updated FALFLEXT with negative value
    -the CC plan was update again -> it updated CO table -> updated FAGLFLEXT and balance with negative value is zero
    - the CC plan was deleted again -> it updated CO tabe with negative value -> FAGLFLEXT  is in minus value!
    It seems like somewhere between first and second steps, the scenario FIN-CCA was not behaving like it was active!
    Have you come across this before?
    Thanks!
    Debora

  • Responsibility cost centre is probably not supplied or invalid, vide Z* mes

    Business Scenario is to reverse the material document, thru a standard SAP tcode (Cancel Material document MBST/ MB31).
    However system is giving error as listed below
    u201CResponsibility error
    Message no ZA031
    Diaganosis
    Responsibility cost centre MM Validation. Responsibility cost centre is probably not supplied or invalid,
    Where
    Amount
    Document reference
    Line item.
    Procedure
    Please check and ensure valid responsibility cost centre is supplied.
    Parameters
    Responsibility error where &1, &2, &3 and &4, where
    &1 is amount (ACCIT_GLX-PSWBT)
    &2 is Document reference (ACCIT_GLX-AWREF)
    &3 is document line item.   (ACCIT_GLX-POSNAR)
    &4 is currently not used  u201C
    The material document 5002106293 is associated with production order 4410MRECFM_A.  The responsible cost center of the production order is 4721509006.
    Since being a Z error, whether to Debug can help. But debugging could be lenghthy, as standard program would be voluminous.
    Or whether FICO team can solve this issue.
    Or any other alternate.

    First point is to check in the standard FI validation in transaction OB28 or in CO validation in OKC7.Double click on the validation and inside you will see the steps of validation. Check for the MESSAGE number ZA031 in each of these steps. If the message has been caused due to any of these validation steps contact FICO team to either crrect the data or rectify the posting.
    Thanks and regards
    Kedar

  • Cost Centre drop down not working in Shopping Cart

    Hi Experts,
    Cost Centre drop down is not working in Shopping Cart.
    Version: SRM 7.0 SP05
    Message - no input help due to errors when checking the display authoriz.
    I have checked there are some SAP Notes available for this issue, but it is for SRM 5.0 version
    725247 - Search help and BAdI BBP_F4_READ_ON_ENTRY in accnt assgn scr
    839534 - Problems with dropdown list in Acc. ***. overview
    925890 - Cost centre drop down not working
    I have raised OSS Message, Please gothrough the reply from SAP below
    Note
    656633
    815849 top 5
    Customizing Recommendations
    - Note 656633 desribes pre-requisites for ERP RFC-user using F4-help.
    - Assign SRM standard role /SAPSRM/EMPLOYEE during F4-help testing.
    - Check RFC-dialog for F4-help destination using SM59.
    - ERP F4-help destination must be maintained in IMG table bbp_backend_dest.
    - Using PPOMA_BBP dropdown disable BE_F4_HELP authority activity as of note 815849. Multiple values must be maintained in  attribute CNT cost center.
    - Hint: Mix of ERP F4-help and PPOMA_BBP dropdown is not possible.
    Return
    a.SRM system ID, client, remote access, logon data buyer who face the problem incl. sap_all
    b.ERP RFC-dialog access via SRM, RFC-user incl. display or sap_all
    I have followed both the notes, but still problem presists
    Please advice.
    BR,
    Siva

    Hi,
    This issue has been resloved.
    Solution:
    Step:1
    Assign SRM standard or custom role like /SAPSRM/EMPLOYEE to user; Please make sure multiple values been maintained in attribute CNT cost center in PPOMA_BBP for the user
    Step: 2
    Disable BE_F4_HELP authority activity for role /SAPSRM/EMPLOYEE in BBP Component > SRM: General Access Authorizations in EBP
    Step: 3
    Apply SAP Note 668746 - COIN - Switching off OKB9 in EBP scenario in SAP R/3 as per note 815849 Solution 1
    System will check during the processing of account assignment objects in an EBP scenario, the backend system reads the default account assignment (Transaction OKB9) as usual if EBP does not provide any account assignment. This note will Switch off OKB9 in EBP scenario and it will list the CNT values from PPOMA in the shopping cart account assignment F4 help.
    BR,
    Siva

  • Rel. strategy is not triggered while creation of PR with cost centr

    Hi Gurus,
    While creation of PR release strategy is not getting triggered with cost centre BCWSV870. But release strategy of PR triggered for cost centre BCWSV852 (In PR changed only cost centre as BCWSV852 instead of BCWSV870). Both cost centres are similar and the both cost centres are exist in characteristics value in CL20N for the same release strategy.
    My question is why for one cost centre triggers release strategy triggers and for other cost centre release strategy is not triggered. Can you please tell how come this and rewarded for answer this.
    With regards,
    C. Sundar Rajan

    Hi,
    In regard to problematic PR with cost center BCWSV870, was your PR maintained with only one line item? or multiple line items?.  In additions, when defining cost center as part of the release strategy structure, did you enter all cost centers with leading zeros?  Tak a further look into OSS Note 365604 for your further investigation.
    Cheers,
    HT

  • MIRO Error-Can not post to mat.account & using overhead cost centre &.

    Dear Colleagues,
    On MIRO,users have come across this error where they can not post to a particular G/L account using 2 different cost centres(219 & 220).
    We have some validations on OB28 but although one particular step menitons this message as I stated above,the prerequisite of that step seem to be referring to G/L IN VAL_Plant No_16 AND Cost Center IN VAL_Plant No_17.
    Whereabouts I need to maintain this G/L account/Cost Centre Combination?II had a look at OME9/OKB9 but couldn't get any resolution looking over there...
    All Help appreciated.
    PAPJ1.

    I had to tweak the types  of error messages on OB28 temporarily,to allow for these postings to go through and it worked!.
    PAPJ1

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • Dimension 1 Cost centre field is not able to edit in Incoming payment for Down payment Request

    Hi Exports,
    I am facing an issue on selecting Cost centres in Incoming payment screen.
    Issue: While I am booking the payment entry for Down payment request, I am not able to select first Dimension cost centre in Incoming payment rows for down payment request document, the Second dimension is able to select and update. the field is in non-editable mode (only on specific document row)
    Setup:
    1. Two Dimension are enabled
    2. In Separate Columns - Both Cost Centres are in separate column
    The above issue is only for Down payment request, for other documents (Invoice) I am able to select and update cost centre
    Please find below snap shot for reference
    Kindly check and let me know the solution
    Regards,
    Kiran

    Hi Gordon,
    Thanks for your reply.
    Yes agree, The Down Payment request is not a financial document but the Cost centres are able to select in Down payment request rows, no issue at all in this case.
    In Incoming payment screen it is necessary to select Cost centres because it has financial implication using down payment request with related to currency difference or Bank charges (both are Expense accounts) and DR assignment is mandatory in this case.
    And you have to notice one thing in above issue, I am able to select second dimension cost centre and it is allowing to edit and update the cost centre on respective row. Only issue is specific cell (dimension 1 cost centre) is not able to edit.
    Even I am not able to process payment entry without selection of Cost Centre on first dimension, the system is blocking and displaying the error message "DR Assignment is mandatory on Dimension 1 for specific account"
    Looks like bug, please clarify
    SBO version: 9.0 PL 11
    Regards,
    Kiran

  • RE: Cost centre is not updating in FAGLFLEXT table

    Dear experts,
    During posting we give PSG and cost centre but cost centre is not updating in GL total table FAGLFLEXT as its statistical, in order to be able to update CC in the GL total table what we should activate?
    please advice.
    Regards,
    Chandu.

    Hi Chandu.
    Sadly, this is the standard behavior of the system. In FAGLFLEXT only arrive real cost object, not statistical. This is explained in oss
    964686 - Transfer of statistical postings in CO to FI
    If you really nead the Cost Center, you can enhace table FAGL and and create Z field for statistical cost center. This is a common solution.
    Arturo.

Maybe you are looking for

  • MBP WiFi issue after updating to 10.8.5

    I have a Macbook Pro late 2011 and used OS X 10.8.4. Last week installed Windows 7 with latest BootCamp. everythings was fine! Then I updated my Mac to newer version (10.8.5). Now WiFi just works on Windows and Mac does not find any WiFi networks. My

  • Translate the entire web page as a single pdf page in Acrobat X

      Acrobat X has changed the way it interprets web pages. With acrobat 7 and 8, it would translate the entire web page as a single pdf page. With Acrobat X the calculation is gone. Is there a fix or work around this?

  • How do I adjust background image, it is too big

    Hi I am very new to DW.  I am completing a portfolio project that is due very soon.  I just realized that the background image that I created in Photoshop is extremely large so when a user scrolls to the right there is empty screen.  I would like to

  • Device Profile Default Problems

    I am trying to create a default device profile for extension mobility for a 7961 phone. It is not in there. I see 7960s and 40s but I dont see any 41s or 61s. Any body run into this?

  • Javascript popup hides behind the Flex

    Hi, I am using a Flex in our asp.net application. When a popup open the it hides behind the flex. i used wmode transparent when load the flex but it is not properly running. But when i deploy my application in my local machine or local LAN then it is