Cost estimate missing for a material in sales order

Hi All
Users have opened sales orders with materials which does not have a  valid costestimates. These missing cost estimate sales orders did not flow to COPA. Is there any report,  I can run to view all those sales orders which did not flow to COPA?.
Q2. Now after creating a cost estimate for the materails , how can I transfer those sales orders to copa??
Thanks in advance for looking into this

ke2d and ke2c and ke2b are the tcodes

Similar Messages

  • Lock characteristic value for configurable material in Sales Order

    Is there a setting in SAP which can prevent user changing characteristic value for configurable material in Sales Order after production order created for this Sales Order? Currently, it can only works when first delivery create for this Sales Order.
    Thanks a lot.

    Hi,,
    in the characteristic goto additional data tab,
    you have a field called not ready for input.
    you select this when the value in this characteristic come by calculation based on the previous selection.
    that field will be greyed out.
    OR
    u can even select the no display check box,
    by selecting this u cant see the characteristic in the list,, it will give u a popup before leaving the screen.
    for this the char has to be a required field.
    OR
    if any of this is not working then may be u can try out with authorization management.
    thanks

  • No standard cost estimate found for the material

    Hi,
    When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.
    Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21
    What are the settings that i need to do  to avoid the above error message while doing billing?
    Following error msg is appearing:-
    No standard cost estimate could be found for material "300000"
    Message no. K/834
    Diagnosis
    In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".
    The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".
    The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.
    Display Cost Estimate for Material
    Display Material Cost Estimate without Quantity Structure
    System Response
    It is not possible to process the document further.
    Procedure
    Check your system settings.
    Thanks
    Kishore

    Remove the Costing keys assignment in the step "assign costing keys to any
    characteristics" in COPA Configuration settings.

  • Planned cost in S_ALR_87013105 for rejected item in sales order

    Hello Experts
    I have a sales order item having reason for rejection (as error).  However, the planned cost of this sales order item is shown in S_ALR_87013105 report. 
    The sales order was created in the month of Feb2011.  If I run the report for limited period from 03 to 07 the planned cost is NIL but If I run the same report from Feb 11 till date, it shows the planned cost of material +overheads.
    can some body throw light on why the report behaves in this way?
    Thanks and best regards,

    Use T Code KO12 and see if you've got any annual/overall values planned against the IO.
    Regards
    Sreenivas

  • Unable to enter multiple Schedule lines for BOM material in Sales Order

    Hi All,
    We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
    The schedule lines are greyed out, user was able to add schedule lines earlier.
    I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
    Please provide a solution for this.
    PFB link in which similar situation posted in this community but the final resolution method is not discussed.
    http://scn.sap.com/message/13201504#13201504
    Regards,
    Samiksh

    Hi Samiksh,
    Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
    or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
    With regards
    S.Siva

  • Two prices for one material in sales order according condition type

    Hi,
    I configure the condition type according to following condition record:
    Plant/ Sales Organization/ Distribution channel/ Material / Customer
    (because system should calculate two prices for one material in two plants)
    In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing procedure and to have a price for material, user should update the price in the price condition in sales order.
    It is so difficult for user to update one by one, because there are several sales orders which need to update.
    Is it any way to solve this problem?
    Thanks,

    > In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing
    Hi,
    Why to let the user press Enter button before entering plant value Obviously, system will give error, because it doesnt get all the required value based on which you have maintained condition records.
    Ask the user to enter all the value at item level otherwise you will have go for the option that you are doing currently.
    It is said prevention is better than cure
    Hope you get some inputs
    regards,
    Sagar

  • Purchase Order missing for some of the Sales Order for few customers

    Hi All,
    There are few sales orders for which corresponding PO is missing.
    But most of other Sales orders for the same set of customers, PO is coming.
    Could you please enlighten me how this PO is assigned to the Sales order or it is updated with the Inbound Idoc ..
    In any case what may be the reason for PO missing for these sales order...How I can explore this...?
    Thanks,
    Sanjeet

    Hi sanjeet,
       If your IDOC is ORDERS05, Check if you are getting the PO Number in : E1EDK01-BELNR
    Regards,
    Ravi

  • Different Delivery dates for single material in sale order

    Dear All
                  I had a problem while creating a sale order, our customer orders a material for 100 SETS, but he needs 30 SETS On 30th July 2010 and remaining on 31st Aug 2010,
    how to mention the delivery dates in sale order, like for 30 SETS delivery date : 30.07.2010 and other 70 SETS Delivery Date : 31.08.2010.
    Thanks & Regards
    Maheshwar Rao. G
    Edited by: mahesh21973 on Jul 2, 2010 9:08 AM

    Hi,
    Maintain in sales order (VA01/VA02)Item details --> schedule lines enter the Qty with Delivery dates.
    SAM

  • Incorrect assignment of cost estimate number to the material key

    Hi,
       While doing GR for a particular PO we are getting error msg that "Incorrect assignment of cost estimate number to the material key"
    First we thought that this error might be missing of standard prices for materials. Even though creation of standard prices has not solved the problem.Could you please explain me clearly
    1) what are the reasons for this error.
    2)what is the soltuion for this?
    Thanks in adavance
    regds
    ramachandra

    Hi,
    I assume that Material Ledger is active, isn't it?
    Message C+451 is usually caused if there are some entries in ML without any entry in the MM tables (MBEW, QBEW, EBEW).
    These inconsistencies can be identified with the help of program MLHELP_CHECK_MULTIPLE_CKMLHD. Correction can always and only be done by SAP Support. So if this report shows inconsistencies, you should create a message for component CO-PC-ACT.
    Regards,
    Antje

  • Previous cost estimate missing

    Hi All,
    I'm still new in product costing. I have a situation like this :
    Material AAA plant 1111
    Run cost estimate and released :
    - 28.06.2011 = RM147.65
    - 12.08.2011 = RM177.71
    But when I checked in material master (MM03) - I don't see the previous cost which is the June. I only see current cost (August).
    I checked CK13N - for the costing run on June - it's still exist, so It's NOT DELETED, But it does not appear in my material master.
    Please anyone can help me to explain ?
    Regards,
    Melissa

    Hi,
    You can check if the below link helps.
    No future standard cost estimate exists for material * in plant *
    And the given OSS note # 1386066 can help you.
    KInd Regards
    Umapathi G
    Edited by: Umapathi Naidu G on Aug 22, 2011 5:27 PM

  • Add new F4 (searchhelp) for material in sales order

    Hi there!
    I read the following related poste:
    customisation of F4 for material in sales order
    In that post Atul wanted to change an existing search help. My problem is differnet I think.
    What I have:
    In VA01 I have many different SearchHelps for the material: 9 standards and 2 from my serviceprovider. The standards have shortcuts M, A, H, K, L, N, O, P and S. The two custom ones have 2 and Y.
    in MM03 I have even more different SearchHelps for the material: maybe 23 standards and 3 customized ones. The standards have the shortcuts M, A, B, C, E, F, H, I, J, K, L, N, O, P, R, S, T, V and W (then one without ?!?), then G, U. The custom ones are 1, 2, 3, Y.
    I now want to use the searchhelp (for example) "I" (in german its "Artikel zur Liefarentenartikelnummer", so I think its about "Material from suppliermaterialnuber" in english) that I can use in MM03 as well in VA01.
    Where do I have to customize / program things to do so?
    Thanks in advance!

    Works!
    I had to include the Searchhelp MAT1I into the section "included searchhelps" of searchhelp SD_MAT1 within transaction SE11 and run the default parameter assignment (Button).
    I know it was MAT1I because I looked it up in Searchhelp MAT1_A... just to round this ticket for maybe the next readers.

  • Cost center missing for pers. no

    Hi,
    While prosting exps in TC: TRIP, we are getting the error "Cost center missing for pers. no". After analyzation the issue we came to know that there is no relationship with org. assignment. We went to TC: PO13>give position>select relationship-->click on create infotype. Here we have given relationship A 011and click on save and again save. Now, we went to TC: PA20/30 cost center is appearing correctly.
    We have couple of pers nos. Instead of doing manuallthis we are doing executing program RHINTE30 in TC: SE38. But it is not updating cost center in TC: PA20/30. How should i achieve this issue? Pls advice....

    you are correct RHINTE30 report will update Cost Center in IT 0001 from OM. Before that you have to upload CC to position through T.code  P013 using either LSMW / BDC.
    For updating CC in IT 0001 process is below.
    First Create Cost center to position using P013 t.code and relation ship A 011.
    Excutre report RHINTE30 using T.code SE38.
    After that there will be one batch input session created in SM35.
    Finally Select your batch input session and Excute through SM35
    Then CC will be updated in IT 0001.
    If there are no much employees you can manull create CC directly in P013 and CC will directly upte in IT 0001.

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • Pricing For Text Item in Sales Order

    Hi ,
    How to give price for text item in sales order.
    With regards.
    Afzal

    Hi Afzal,
    consider to create a single service material as a generic one, type DIEN, with basic data and sales org views, with  item category group LEIS (it will determine item category TAX in sales order). Material description could be "Don't forget to change me!" so in sales order user remembers to changes the description according to the especific sales order requirements.
    Regards,
    JM

  • Transfer of material from sales order stock to subcontractor

    Iam having subcontracting operation in routing. But i am not able to transfer of material from sales order stock to subcontractor when i do 541 movement

    Dear Mayuresh,
    You cannot move Sales Order assigned material directly to Sub contracting Vendor stock.
    For doing so firstly unassign the Sales order stock by transaction MB1B & movement type 411E.
    After this you can provide the stock to the vendor by transaction MB1B & movement type 541O.
    Other way is to create account assigned Purchase Orders. Thereafter create virtual sub contractor storage location in your plant. Transfer your Sales Order assigned material to these Virtual locations so that you can see the stock provided to the vendor. Now during Goods Receipt of the finished goods you can consume the material by movement type 543E.
    Regards,
    Subha.

Maybe you are looking for

  • Moving to jrun4

    -logger (debug/info/...) doesn't work: entries are written with very long delays. -same problem also on a new created server, via browser. -no errors in log on start server. -jrun.xml contains: <service class="jrunx.logger.LoggerService" name="Logger

  • Problems viewing email from outlook clients

    hey i am getting something like this on my apple mail when viewing email from outlook with attachments ------=_NextPart_00101C8CF90.2BC31259 Content-Type: text/plain; charset="iso-8859-1" content-transfer-encoding: quoted-printable <<mehlerkabelkatal

  • Best practice about dial-peer creating when using analog lines

    Hi, I am trying to find out what is the best practice when creating dial-peer for analog lines on CME, should I use trunk group or create separate dial-peer for each FXO ports? If I use trunk group, is there any advantage ( lesser dial-peer)  or disa

  • Simple form option tag in PtG

    Hi, got a problem with the simple form option Here's my code: LOOP FETCH my_dyncursor INTO my_1; EXIT WHEN my_dyncursor%NOTFOUND; -- Anzeige der vorhandenen Werte der Dimension IF my_1 IS NOT NULL THEN dbms_output.put_line('<SimpleFormOption value="'

  • Indentifying Version of WRE54G

    For some reason LinkSys (Cisco) does not change model numbers (such as adding an A at the end) when there is a significant change to the device.  The WRE54G now comes in two versions -- a new one with an RJ45 port and the original version without the