Cost Estimate using Commercial Price 3 of BOM item

Dear Experts,
I am trying to create a cost estimate for certain materials using ABC costing variant. The objective is that the cost estimate should pick up Commercial price 3 from the material masters of the BOM item and then calculate cost estimate for the main product (The costing variant has been customized this way). However, for certain main products, the system is picking up the standard price of the BOM item and in some main products it it correctly picking up the Commercial price.
The BOM items used in the different products are different.
I am unable to understand this behaviour. If anyone has come across any such problem before, please help.
Regards,
Aditya

hi,
Check the Valuation variant and the strategy sequence whether you have selected the Commercial price 3 as the first priority and the Standard price as the next priority. If u don’t want the standard price to be picked u remove this in the strategy sequence.
Further where the system is picking the standard price, possibly the commercial price 3 has not been defined in the material master. Possibly , the system is unable to find the commercial Price 3 and it is fetching the next Price as defined in the valuation variant which is the standard Price.
assign points if useful.
regards,

Similar Messages

  • How to use "discontinuation data" in BOM item ?

    Hi everyone!
    I would like to use "discontinuation data" in BOM item , not in MRP4 view, how to set? thanks!
    Dandan

    >
    dandan li wrote:
    >
    >
    > I want to know the  "discontinuation data" in BOM item, not  Priority of AltItemGroup !
    Dear Dandan Li,
    Plz Re-check Mr. SmanS Reply in that thread
    it is Regarding As per ur query
    More over Plz try to encourage your repliers always
    [committed quantity in production order;
    Like wise there are many other threads of ur's
    Plz Don't misunderstand
    Regards
    Madhu

  • COPA cost estimate using costing sheet

    Dear Experts,
    I have done the relevant copa configuration related to Material cost estimate using costing sheet. I have maintained all the condition type required in the costing sheet.
    Can anyone plese help me out with the Transction code which I should run to do the material cost estomate using costinbg sheet. And also how I can link the estimated material cost in my Profitability analysis report.
    Thank you
    Regards
    Paul
    Edited by: Paul01 on Dec 20, 2010 1:31 AM

    Hi Paul
    What is your purpose?
    1. If you just want to fetch the material cost estimate (std cost) in COPA, then what you are doing is not correct...For this,
    a. KE4U - Valuation Strategy 001 - (DETAILS Tab) assign 001 to Qty Field ABSMG and tick "Mat Cstng" indicator
    b. KE4U - (Assignment Tab) Assign 001 to PV=01 and Record Type = F
    c. Create a Costing key in KE40
    d. Assign Costing key to mat types in KE4J or KEPC
    e. Assign Cost Comp Split to Value Field in KE4R
    2. Costing sheet in COPA is used for doing some calculations during billing and updating the same to COPA... For eg: you want to add 2% of your Std cost as Freight to COPA (Statistical value)... This can be done using Costing sheet...
    In order to use Costing sheet in COPA,
    a. Create a Costing sheet - (You already did this)
    b. KE4U - Val Strategy 001 - (DETAILS Tab)  Against Valuation Strategy 001 - Assign this costing sheet against "Application = KE"  and Qty Field = ABSMG.. Do not check "Mat Cstng" against this indicator..
    So, if you want to use Costing sheet in COPA, your KE4U may have 2 entries under the "DETAILS" tab..
    (1) As per 1.a and 1.b above
    (2) As per 2.b above
    Regards
    Ajay M

  • Material cost estimate using recursive BOM

    Hello everybody.
    I want create material cost estimate (CK11N) using a recipe with recursive BOM. When I execute the transaction CK11N the following message is display Costing of cycle 00001 does not converge
    Do you know what is missing?
    Thanks in advance.

    Dear,
    Message no CK740?
    Please do check the link below......
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/f8/a3e333bf3d11d189900000e8214595/content.htm
    and OSS note : 858384
    Regards,
    R.Brahmankar

  • Activity Costs Revaluation Using Actual Price

    Hi,
    Since we can revaluate the activity costs at actual price in the product costing module itself using t.code MFN1, why SAP has provided another option to revaluate acticvity consumption at actual price in the material ledger multi level price determination?
    What is the difference between the both? If i had used MFN1, do i still have to use the revaluation of activity costs provided in the material ledger?

    Hi,
    However don't you think if the production order activity cost has been revaluated at actuals in the production order then during settlement it will carry the activity actual costs which will be shown in material ledger receipts category with the same actuals value for the activity costs.
    So why should i be revaluating the activity costs again with actual activity price in material ledger once again? It sounds like a duplicate work to me under this scenario....

  • SAP: Cannot save product cost in commercial price in material master

    Hi,
    I have created a PCE which is designed to save the cost estimate in commercial price in accounting tab in material master. The issue that I am facing is that the cost; that is released perfectly is not saving in the commercial price in material master; instead the price saved in the commercial price is the previous price.
    If I try to change the "costing type" for the PCE to any where other than "commercial price" or tax price; the price is saved successfully.
    My question is that why the PCE's price is not saved in the commercial or tax price in the material master.
    I would really appreciate your help.
    Regards,
    OZ

    Salaam Osman Bhai
    In the costing type, choose "prices other than standard price".
    And while doing CK24, you can choose the commercial price field to receive the cost estimate result
    Br. Ajay M

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks

  • BOM- Routing- cost estimate

    Hello
    i want to find out the relationship between BOM - Routing and cost estimate.
    i know what a BOM is, not sure how its linked to Routing and its compulsary
    to have a BOM and routing to update the costing run with quantity structure?
    can someone throw some light on this process and explain the flow.
    I have read sap help links but didnt find them very usefull.
    for testing purposes i want to update all the cost components manually. I need to have a materila which has  all the cost components in the costing 2 tab in MM03
    is this possible?
    Thanks
    Zaid

    Hi
    Create an LSMW for CK11N and enter the Prod version of your choice in CK11N.. No need to create a BDC...
    Ideally, you should create a Proc Alt in CK91N with each Prod Version and Mix ratio in CK94 for such cases.... If you want to release cost with only one version and want the cost of other versions only for name sake, you can maintain the Mix Ration in CK94 as 100 0 0 0 i.e. 100 for One Prod version and 0 for the rest
    br, Ajay M

  • MTO - RAW MATERIAL COST ESTIMATE

    In an MTO scenario I am using configurable material I run order BOM cost estimate after sales order creation and as a result value gets updated against EK02 condition type in sales order.
    For order Bom cost estimate system picks values from material master of raw materials in BOM.
    Raw material has moving price in material master, I want to know
    1)what price system picks from material master for cost estimate MOVING AVERAGE PRICE, STANDARD PRICE in accounting view
    2)Do we run cost estimate for raw materials in MTO, and if so then at what time.

    hello sir,
    plz help me
    ne production order shows for cost element of cost of finished goods amt shows vey high the std price in material master is 71 and qty is 140 but it is not showing with this multiplication it is in lacs.
    in the production order the target cost is zero and total actal cost in lacs and total variance percentage is 0 only but as per knowledge no variance know but if u calculate 140*.71 it should come less amt as per material maser but in production order i t shows high amount
    twe found that they changed the price after GR is done now we want to post JV correct?what is the procedure to post JV in the current month .
    the entry at the time of G done with high value is
    Finshed goods a/c dr(balance sheet item) 89 post key
    COGS cr (p&L item) 91(post key)
    now what is the rectification entry
    Arjun

  • Std. cost estimate

    Dear Experts,
    We have ROH, HALB & ZMAT as materials.  The question is with respect std. cost estimate.
    The cost estimate are run for HALB & ZMAT  items created  on day to day basis. However cost estimate is executed for all the  HALB & ZMAT on alternate months.
    I would lke to know the best practice or industry standard on this issue on the frequency of estimates. I appreciate any other points rellated to this point.
    Thanks in advance.
    T.S.Shankar

    hi read the following basics of CO-PC        
    1)A material cost estimate used to calculate the standard price in the 
    material master record.                                                                               
    2)The cost estimate must be executed with a costing variant that updates
    the material master, and the cost estimate must be released.                                                                               
    3)Forms the basis for profit planning or product costing where the focus 
    is on determining the variances.                                                                               
    4)Typicall, a standard cost estimate is created for each product at the  
    beginning of the fiscal year or new season or BEGINING OF THE PERIOD /  MONTH.                                                                               
    5)Standard cost estimates establish standard prices for semifinished     
    products and finished products. The costs calculated in standard cost  
    estimates are used to valuate materials with standard price control.   
    A costing type that calculates the cost of goods manufactured for a   
    product during the course of a planning period.                                                                               
    It differs from the standard cost estimate in that it uses the quantity
    structure that has changed during the planning period as the basis for
    calculating costs.   (  WHEN EVR YOUR PLANNING WILL BE CHANGED    )
    CURRENT COST ESTIMATE                                                                          
    1)A cost estimate that can be created at any time to valuate the current   
    quantity structure with the current prices.                                                                               
    This cost estimate serves the following purposes:                                                                               
    A)  You can compare its results with the results of the standard cost    
         estimate to support decision-making in production.                                                                               
    B)You can transfer the results of this cost estimate to the material   
         master and use them to valuate the goods receipt when working with   
         materials that use the moving average price.                         
    Regards
    Mala K Reddy

  • AFS grid value/valuation type not picked in sales order cost estimate

    Hi Experts,
    We have different valuation types in the material master. This is part of the AFS, where each grid value is a valuation type. While making a sales order cost estimate and in one sales order item, we have 3 grid values (valuation types), system is costing only for one grid value and that too for the entire quantity. This way the costing is wrong as different grid values have different BOMs and routings.
    Is there any specific setting to have the grid value to be picked up in the sales order cost estimate? Or am i missing some setting? in general product costing settings or AFS product costing settings?
    Best Regards
    Vimal

    Hi,
    Do you mean "sales order costing", please  if so then please ref. the link:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6da4446711d189420000e829fbbd/content.htm
    Regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 25, 2011 8:19 AM

  • We cannot do std cost estimate every month in ML

    HI
    Can we do std cost estimate whenever required with changed price,
    can i change the price in material master -how
    regards
    sowmya

    Hi,
    We can do std cost estimate once in a month. If we want to do multiple times in a month we should reorganise the material cost estimate using CKR1.
    We can change the material master price for a material with out standard cost estimate using MR21.
    If standard cost estimate exist, use CKR1, the use MR21.
    Regards,
    Rijo Paul

  • Restrict revaluation of existing stock after cost estimate

    Hi experts,
    Our users are having Finished goods in Standard price. I understand that there will be automatic posting in FI for updating existing inventory value once we release cost estimate. However, the users do not want this update.
    Any chance that we can execute cost estimate, still release price to use for the new period but no inventory value update for existing inventory?
    Thanks in advanced!!
    Best Regards,
    Jacqueline

    Hi
    I think it may not possible, However, release of cost estimates for not for inv val can be done.
    regards,
    satya

  • Product Costing - Standard Cost Component Split on Multi Level BOM's

    Hi,
    We are the process of introducing SAP for all back office and manufacturing activities.
    I am currently trying to verify that the product cost calculation for Multi-Level BOMs in our Legacy system matches the cost roll up or cost estimate in SAP at not only a Total Cost Level but the cost component split must be accurate also. So far, all the costs roll up correctly at a total cost level but I have noticed one issue:
    When I run a cost estimate for a single level BOM the cost estimate will split the components accurately into Material, Labor, Fixed Overhead and Variable overhead, However, when this component is then used in the next level of manufacturing all the Labor, Fixed Overhead and Variable Overhead Cost is grouped under Material.
    Q1.) Is there a SAP setting or config change that will keep the previous Labor, Fixed OH and Variable OH cost in these categories as the material is rolled up to finished product level?
    Q2.) Is there a standard report / view where I can see the Finished Goods Standard Cost split by each of there rolled up Components? This would need to split the Total Material, Total Labor, Total Fixed OH and Total VO required to make the Finished Product. 
    Q3.) Is there a standard report / view where I can see the added value (Absorption) by component split (Labor, Fixed OH, Variable OH) for every Manufactured Part?
    Any help you can provide would be greatly appreciated.
    Thanks & Regards,
    Brian

    Actuall I just tried again and it did ask for me S number and I put it in and I did not have "authorization" to access
    Error Message - Access denied (R/3)
    What happened?
    You do not have permission to access this Object
    What can you do?
    Please contact a consulting adminstrative
    Error code: WEBSMP106-20080214172231-0015
    Error details: 2491DD9-702/1A053/3162-71A9CFA5-3CB9265-2992F9
    Service Name: SAPIDB
    Service Server: WEBSMP106
    Process-ID: 4640
    Thread-ID: 6020
    Sorry for any inconvenience.
    Your SAP Service Marketplace Team

  • Split valuation Cost estimate

    What is the impact when we execute cost estimate using Split valuation materials ?

    Std cost estiatme would impact the Split valuation which would have the material with "S" Standard price to update the price when you release std cost estimate.

Maybe you are looking for

  • How to call a LV.exe from LV via ActiveX?

    Hi all, I need some kind of atomic task, e.g. some (short) instructions that cannot be aborted. Calling a DLL, wait some ms, calling it again... And even an Abort via VI server shall not abort this atomic task but finish it. I thought about building

  • Delivery and Proforma Invoice

    Hi,   Could someone please tell me on how to create a proforma invoice aftre creating a delivery? Or, in other words, I have created a delivery without reference to a sales order and now want to create a  proforma invoice to go with the delivery. How

  • Twitter app update wont go away ARRGGHHH!!!

    mac appstore shows an update for twitter app even tho i dont have twitter installed i cant get rid of the **** thing!! its force installing itself, so i update then delete it and the update appears again NIGHTMARE!!!!! 1. my twitter update shows MY a

  • Linking to vCalendar file

    I have an events calendar that gives the user the option of saving a particular event in their Outlook calendar. The link is a simple getURL(); call to the an .ics calendar file. In IE everything is fine. The user is given an option to either save th

  • Run same 9i forms servlet in different browser windows

    Hi all, I'm using Oracle9iAS Forms Service to deploy the forms. The problem that I have, is that I'm not able to run the same forms 9i servlet in two different browser windows. I'm able to run the 9i test form with the following URL in browser window