Cost of Sales BOM

Hi SD Gurus,
Need to know how to calculate the cost of the sales BOM that I have created. When I create a sales order for the sales BOM, it explode all the components in the sales BOM. All of them have condition type VPRS which state the cost of the component but the actual FGD sales BOM does not have VPRS condition type in them. The item category for the sales BOM is customised as ZTAI, Banded without pricing.
I tried looking at the header and there is a VPRS conditon but it is for the whole order. The order may or may not include other sales order item that is a Sales BOM.
Am i missing something here. Pls help and points will be awarded. Thanks

Hi all SD Gurus,
Thank you very much for the fast response.
I think my SD config person did not check the "determine cost" in VOV7 for that item category. Will ask him to do so but am interested in the below suggestion also.
at parent level, in which case all the sub-items pricing components are collated (totaled) into the parent item.
Dear Kookie,
Can you advise how to perform the above also from a cost perspective, i.e. adding all the VPRS found in the sub items and adding them to the main item

Similar Messages

  • CU50 difference in Engineering BOM cost and Sales BOM cost

    Dear All,
    I have material  BOM    M0001 --configurable...finished prodcuct (spe procuremt 52)
                                                 M2100-- confifurable --- Phontam (semi finished)
                                                           M8600---- configurable (semifinished) specP 52                                                       R7000---
                                                           R7000--non configurable material
                                                           R7000--non configurable
                                                           R7000-- non configurable.
    Now in T-code Cu50  under configuration tab simulation
    1.  when i am selecting Engineering Tab and then costing  tab   all materials are picked for Engineering BOM costing.
    2. when i am selecting only costing tab (Sales).. then the material R7000--non configurable  qty 54
                                                                                    R7000--non configurable  qty 27
                                                                                    R7000-- non configurable. qty 18
    are not costed.
    What could be the reason for not picking the cost for the material R7000
                                                                                    R7000
                                                                                    R7000
    Please help me..
    Thanks in advance.
    regards
    janardhan

    Hello Janardhan,
    This is standard SAP behaviour. As per details given by you, it seems that material's consfiguration profile have settings of "Order BOM" and "multi-level" in CU43 transaction. So for such settings, system behaves differently for Engineering BOM and sales order cost estimates as given below.
    1. Click on u201CEngineeringu201D Button and then click on u201CCalculationu201D  Button : System simulates the cost estimates through transaction CU51. And in CU51 BOM explosion for cost estimate is multilevel. So system will show all the components in the BOM of header material. So you will find all the components listed in Cost estimate simulation.
    2. Directly click on u201CCalculationu201D  button : System simulates the cost estimates as it use to simulate in VA01 transaction. Becasue of this, there is NO BOM explosion till last level. System will only simulate the Cost estimate by exploding the BOM till 1st level. So system will show only 1st level BOM components. So you will find only 1st level BOM components listed.
    So dont try to check anything in it, as its standard SAP behaviour.
    Regards,
    Nachiket.

  • Sales BOM : Header item stock and cost

    Hello gurus,
    I'm very new for sales BOM and have one questions.
    We have material A and B (purchased from vendor).
    They will be assembled by 3PL company as C.
    Then we will sell C to the our customer.
    I want to set price/cost at the header item level.
    because we will sell material B free of charge.
    I've set C like below  
    1. Item category group. : ERLA
       Item category : TAQ
       Setting of A and B
        Item category group. : NORM
       Item category : TAE
    2. Then make BOM in tcode CS01 with C
        Material : C
        Plant: XXXX
        BOM Usage :5
        subitem : A, B
        Item category : N(Non-stock item)
    After then I tried to make a sales order
    with material C.
    I can get sub-items(A,B) successfully
    however system said there is no atp stock for C.
    How can I get stock of C from stock of A and B?
    And How can I set the cost of C with value of A+B?
    And How can I set the condition of C to calculate cost of C in header level?
    or can I set like
    price is determined in header level and cost is calculated in item level?
    Or please recommend nicer solution.
    Thank you very much.
    J.K.

    Hi Azam,
    It seems to me that you want to use Delivery Group for Sales BOM where If Mat A = Mat B + Mat C and Mat B Availability date is 20/07/2014 (DD/MM/YYYY) and Mat C availability is 25/07/2014 then Main line item should be confirmed with 25/07/2014.
    If any one sub Item is not available, then Any of the item from the Grouping should not be dispatched.
    If this is the requirement then, In Item Category (VOV7) for main Item update Create Delivery Group field with X and your requirement will be fulfilled.
    Do let us know the result after testing.
    Regards,
    MJ.

  • Sales Order BOM-Cost of Sales issue

    Dear Gurus
    Standard Sales Order BOM supports either Pricing Inventory control, Delivery at Header level (Item category group ERLA) or All these at Component level ( Item category group LUMF).
    I have a scenario where in Header is Intangible and Relevent for Pricing only. However Down the level parts are relevent for Delivery and Inventory control.
    I am exploding the Sales Order BOM with Item category group ERLA. However When I do Billing only for Header I do not get Cost of Sales as there is no Cost in Header. I cannot bring Down the level components in Billing as these are not Billing relevent.
    Just To Clarify it more these are Cost is not posted in COPA as Protability analysis documents are only generated with Billing.
    Regards,
    Neeraj Srivastava
    Looking for your valuable inputs How the Cost of Sales can be achieved.
    Regards,
    Neeraj Srivastava
    Edited by: NEERAJ SRIVASTAVA on Jun 5, 2008 5:15 PM

    Hi,
    just try to use BELOW Function moduleS
    CABM_READ_BOM
    CABM_READ_BOM_HEAD            
    CABM_READ_BOM_ITEM            
    These are function Modules ( BOM link to Sales order)
                        OR
    See the function Group CKDI to view more function modules that have relation between BOM and Sales order
    Thanks
    Ramesh

  • Alternate BOM in Sales BOm Costing

    Hi,
       When we create sales order with alternate sales BOM we face a problem.I am using Alternate BOM 5 in sales order .But Costing is happening for Alternate BOM 1.By default Costing  is taking Alternate BOM1 irrespective of alternate  BOM  i am using in sales order.
      At the time of sales BOM costing system should take alternate BOM5 .how to do this?
    Regards,
    Guru
    Edited by: kumaraguru v on Jan 22, 2010 7:24 AM

    You can use Mixed Costing for this. Maintain Procurement alternative by CK91 & Mixing Ratio CK94 for the version you want to cost
    Regards
    Hardy

  • Sales BOM and related to cost

    Dear All,
    Our client has requirement of sales package as below:
    1. They want sell sales BOM as sales package
    2. Material A is main item, and material B, C, and D as component
    3. They sell material A and want the revenue also cost post to material A
    My colleague said already set up the config sales BOM,  and the result are:
    Revenue post to material A (father/main item)
    Cost post to material b, c, and d.
    However our client need all cost moved to main item (material A)
    How's the behaviour of sales bom exactly? Especially the costing?
    And what must we do to cover the requirement.
    Regards,
    Dewi

    Hi,
    Go to VTFL --- > Select the document type --> Go to item level and tick the cumulate the cost.
    Cumulate cost
    This field is used in the main item to control whether the cost value (usually condition type VPRS) is to be copied from the relevant sub-items. The following cases are taken into account:
    Free of charge sub-items (free goods)
    Batch split items
    Bill of material components
    This function is needed especially if the sub-items involved are not relevant for billing. In this case the costs of these sub-items do not appear in CO-PA or the statistics
    Hope this will resolve your issue.
    REgards,
    Krishna O.

  • Costing for sales order BOM vs Production BOM

    Hi gurus,
    can some one please explain in clear how is costing different if we use sales order bom versus if we use production bom.
    Thx

    I Feel Your are asking about Sale order costing and Std cost estimate using production BOM
    IN sale order costing- You can use any BOM ( sale BOM or production BOM), IF you carried out costing in sale order level in Va01/Va02, system will read the BOM, routing for that material  & system will take the costing lot as sale order qty and carried out cost estimate, This cost estimate value will update In condition as EK02. & system will take this Ek02 price for production GR value, PGI value and the profit is calculated based on Ek02 not based on VPRS( std cost estimate)
    Production costing:
    System will take the costing lot size in material master costing view, System will read the BOM and routing for the material in Ck11n, And you need to mark and release in Ck24, this value will update as Std cost  price in material master, this value is atken for Goods movement for that material

  • 3rd Part Dropship Scenario with Sales BOM

    Hi
    We have a 3rd Party Dropshipment scenario with Sales BOM with susequent Debit
    Characteristics of Sales BOM
    Sales BOM is created
    Header Material is Valuated but non-inventorised (Accounting and costing view should exist)
    Component Material is Valuated and inventorised
    In Sales order, Pricing is done at the header material not at the components level
    During Billing we get the COGS for the header material (cost coming from VPRS)
    No VPRS exist at component level instead we have copy of VPRS just to capture the value in COPA for our reporting
    Process
    1. Sales Order created with Sales BOM exploded in sales order.
    2. At the Item level Purchase requisition is created.
    3. PR for the components is converted to PO
    4. Vendor Delivers the components to Customer.
    5. Statistical GR done in our system.
    6. Invoicing is done in MIRO
    7. We directly do the Billing. Billing is created at header level. Revenue and COGS is reported at Header level only.
    We are stuck when we are doing the Subsequent Debit (can be for any unplanned cost). For Susequent Debit we are not able to report differential COPA at header level.
    Normally whenever you do subsequent debit in case of 3rd party dropship for normal material, COPA document automatically attached to Billing. This is happening because of the behaviour of VPRS condition type. In our case VPRS only exists at header level and not at component level but replenishment is for components. Subsequent debit is also happening at component level. We need it to be reported at header level.
    We need some solution to this.
    Please advise
    Regards
    Neeraj
    Edited by: NEERAJ BHARDWAJ on Dec 2, 2011 5:12 AM

    Hi Raj,
    Please clarified your requirement here, you mention that you wanted to valuated COGS at actual cost of PO? That sound more like actual costing here and what is the reason for this requirement?
    Is this MTO with variant configuration?
    If this is MTO with VC, Yes - we do cost Sales Order and here is the brief steps:-
    Price Control S
    a) Sales Order Creation - Normally when you save this will be costed and marked automatically. Note that condition type EK02 will represent the cost here
    b) Run MRP based on Sales Order requirement which resulting planned orders, PR, etc
    c) Convert PR-PO, Planned Order -> Production Order
    d) Confirmations, GR on PO which valuated according to the SCE Costing in step a)
    e) PGI will be based on the GR value on step d) which is also your SCE Costing
    f) Any variance between PO and SCE need to be settle.
    Thanks,
    Ong Yang Lim

  • Use of Sales BOM to force ATP against Bulk Material?

    Background:
    Our business was recently acquired, and we have migrated to the parent company's R/3 system.  In our previous MRP system (R/2), we planned, produced, and shipped a single bulk Material ID in Trucks, Rail Cars, Flexi-Bags, and Iso-Tainers.  In the new system, specific Material IDs are now required for each of these modes.  However, we do not store the inventory in these modes, nor do we wish to plan at this detailed level.
    Considered So Far:
    Initial suggestion was to use A.T.O. to look through a BOM and automatically create production orders for each customer order. However, this seems to add additional complexity that we do not really need, and makes changing order dates more challenging (have to move both the order and the accompanying Prod. Order).
    Desired Outcome:
    Order is entered and priced based upon the mode-specific Material ID, but inventory is relieved from the Bulk material.  In our previous R/2 system, there was a field on the material master called "Std.Prod." which stood for Standard Product Link.  We used it for synonymous products where we produced and inventoried under one name, but sold under several different names.  The customer materials were set up as type SALE and referenced the inventoried material, set as type FINI, in this Std. Prod. field.  Thus, at the header level, the user saw the SALE material, but for planning and at the batch level, the system showed the FINI.
    Options?
    I am told that, due to the amount of custom coding and user exits surrounding outputs and interfaces to EDI and other external systems, the use of Material Determination would require too much testing and potentially too much development work.  But, is it the best / correct solution to the problem?  Because right now, I don't have the ability to perform ATP against the inventoried Material, so nothing confirms.  Would the use of a 1 to 1 Sales BOM offer anything different?
    Many Thanks in Advance,
    J.P.

    Hello JP
    Material Determination (MD) works with Consignment orders, only you need to assign a MD procedure to the requisite sales document type in config ( TO code OV14). Product substitution, which is a specialized form of MD, makes use of special item cats like TAX and TAPS or TAPA and TAN for main and substitute items respectively, but you can always make copies of them and use them with consignment orders also in conjunction with item category usages like PSHP. PSEL, PSA1 and PSA2. There could be resultant issues, but unless you test you won't know them all.
    Your second question about 'Sale would go against the finished good (Truck / Rail material) while the production costs go against the Bulk', brought a new realization in me. You are ordering, pricing and delivering Truck or Rail materials, but those requirements have to be converted to Production orders for bulk material, so from a Sales and Distribution (SD) point of view you  don't need anything extra, therefore work with you Production Planning (PP) consultant to convert the requirements at  PP end?? May be without resorting to MD or BOMs in Sales, you can work with your PP consultant and with standard config or custom development, you may realize your desired outcome.
    Also as long as cost is maintained in the sales Material (Truck for example)  with due regard to the additional costs in converting Bulk to truck, you should be fine. Follow the example below:
    Standard cost of 1 ton , say X, is stored in Bulk Material master.
    Now if there is no additional cost and you just load the bulk material into a truck and if a Truck is 10 ton, then Truck material would have 10X in its material master for cost.
    But if there is some other material  and/or  labor involved in converting bulk to Truck and their cost is y, then you will have (10x+y) in your truck material. Also it is worthwhile to capture the additional cost in the Production/Assembly order via components and operations.
    Your problem is not insurmountable, but you need to assemble a team of SD. PP, MM and CO experts to design an integrated solution for you.

  • Sales bom - parent item

    when i create a sales bom, all the components display as independent items on the picklist. why? and it also does not display the parent item. the picker needs to see this information! how can i make that show up on the picklist? any ideas?

    Hi Gordon,
    I appreciate your mature reply to my critical posting.
    Do you know what the Sales BOM is supposed to be used for? I am not sure how in any possible context can the below make sense:
    1. Currently B1 will deliver components only of a Sales BOM at zero cost
    2. Given sales orders can "expire" (in the sense they can have a cut-off date - typically 30 days by default I think), surely if one doesn't receive the remaining components in time, this would lead to a very awkward situation! What if the remaining component(s) is/are non-purchased item(s)?
    If the above was registered as a program error, fair enough. But they won't register it. any ideas why?
    Although with each version (see below), everything works "as designed" - they keep changing it:
    In 2004A, Sales BOMs were working "as designed" - but P&P manager couldn't be used (parent item was lost when making delivery note)
    In 2005A, Sales BOMs were working "as designed" - same as above - but Assembly BOMs (essentially the same thing) were improved would print off a separate component picking list.
    In 2007A, Sales BOMs are working "as designed" - note, this hasn't officially changed yet - but we now get the parent item in the delivery via P&P
    Our SAP partner was just as surprised at the functionality as we were when we moved ahead with the install a few years ago.
    Please understand, my only issue is the lack of willingness from SAP to recognise the problem at all - and the standard answer of "as designed" even when it is clear there is a problem. If you can help myself and perhaps Prem improve our understanding of the design (especially points 1 and 2 above) I would genuinely be grateful.
    Thanks,
    Raj
    Edited by: Rajiv Agarwalla on Dec 12, 2008 2:24 AM
    Edited by: Rajiv Agarwalla on Dec 12, 2008 2:25 AM

  • WBS planned cost in Sales order cost estimate

    HI Experts,
    Can you please help me in below:
    Will it be possible to include WBS planned cost in Sales order cost estimate.
    ETO Scenario
    Creating Project and booking planned cost
    Creating Sales order and assigned the WBS at line item level
    WHen i do the sales order cost estimate it calculating cost from Sales order BOM includeing Chars value for KMAT.
    I want to know if there is any way to include the WBS planned cost also in the sale order cost estimate.
    Can anyonce please provide inputs.
    Thanks,
    Sudha

    Hi Sudha
    Are you saying the WBS Planned cost is in addition to the Sales Order cost estimate? Well, as far as I know, there is no such possibility
    you can use Unit Costing feature in Req Class instead of Quantity Structure Based Costing... Then you can enter whatever items you want
    br, Ajay M

  • Sales BOM per customer

    This might be a strange question but still. We have a customer who ships out pallets and crates to their customers. They want to be able to track these items of course and bill the customers according to the number of items they received. N.B. these items are not returned so returnable packaging is out of the question.
    We are looking at the use of a sales BOM so we can calculate the number of pallets and crates per sales order and delivery based on the number of finished products they ship out and of course create an invoice where these items are listed as part of the delivery with the actual costs. This works quite satisfactory BUT it will only work when either all customers use the sales BOM or all customers do not use the sales BOM.
    What's the problem, as this is a new process, they will not be able to convince all customers to directly pay for pallets and crates that are being shipped out. We are now facing the problem that for part of the customers they want to use a sales BOM and invoice them for the pallets and crates they receive BUT for part of the customers they do not want to invoice them for the pallets and crates they receive. This means that we are looking for a way where we can indicate, per customer, whether to use a sales BOM (ship out and invoice pallets and crates) or not to use a sales BOM (do not logically ship out and invoice pallets and crates).
    Is this possible yes or no? Maybe with a user exit that checks for a specific field in the customer master? We have already defined two sales BOM's per material, one where pallets and crates are used and one without pallets and crates so we could mis-use the alternative sales BOM principle, but we still need a trigger to call either sales BOM.
    Any help would be appreciated.

    Hi Roberto and Biju,
    We looked at both options but neither are workable. Not all warehouses use HUM because not all warehouses are their own warehouses, some are from logistics service providers who have not SAP access, otherwise the problem would be a bit easier, plus the customer does not use packing and will not use packing in the future.
    The dynamic product proposal was a bit more promising but also there, we encounter a problem because we cannot make a calculation on the number of crates and pallets shipped out to a customer, which is one of the requirements.
    The problem still lies in the fact that
    - Customer A does not want a bill for crates and pallets and therefore does not want to see the items on the delivery and the invoice.
    - Customer B does want a bill for crates and pallets and therefore needs a calculation for the number of pallets and crates he received.
    We cannot set a field somewhere that says customer A without these items, customer B with these items and then trigger something else.
    Thanks for the help but we still haven't solved the problem.

  • Material with  item cat.group ERLA impact on costing and sales pricing

    Hello,
    I would like to know if a material which is defined as item category group ERLA and which has two sub-items posted in the BOM with usage 5 with its respective std cost could  be calculated for costing or not?
    Can I have some information about the impact on  costing and pricing in sales?
    Thanks in advance
    AB

    No the material type should be a FG : it is relevant for sales reporting. For example I call it material "A". In the material master data within the sales screen the item category group ERLA is assigned to "A" . The material A is a grouping material with a sales BOM which contains some sub-items for example B and C which are picked and shipped together. The grouping material is not handled as stock material: only the sub-items are stocked and moved.
    The customer could  only require the material A with its price and receive phisically the two sub-items with a unique package unit or with two separate ones.
    In this scenario the FG with ERLA item could be estimated for standard cost or not?
    Thanks in advance
    Andrea

  • MTO-Product cost by Sales Order

    Hi Guys,
    My client is manufacturing Energy Meters, they want Sales order based Production Planning and costing etc.,
    in MTO scenario, Product cost by Sales Order
    1. Sales Order will be created
    2. BOM is created
    3. some of raw material in the BOM list are available in the stores
    My question is that
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order.
    Correct me if am wrong,
    if the system is not checking the available qty, then there is no Planned Order, everything will be new PR for the whole sales order Qty.
    Expecting your valuable reply
    Thanks for your help in advance.
    Regards
    Elan

    Dear ,
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order
    Answer is Yes .In Sales Order Based Production Order -MTO  , you will be having pre-determined BOM and Routing , before creation of FG Sales Order .
    Based on Planning Strategy 20 : If you are using 20 planning startegy , then you will frist roll the cost in Sales Order Level  by going to VA02-High Lisght Line item -Extras-Cost -based on BOM and Routing  , Sales order will be costed and flagged with green .Then Sales Order will be credit relased in VKM3 for MRP run in MD02.
    Now , in MD02 , you need to select NETCH , 2,1,1,3,2  while executing MRP on FG item .Here , MRP system will explode the BOM till the lowest level and does net requirement calcuation for BOM Component (as depedent to FG) .If the stock alwardy available , then it will  show up as Stcok in Order Report (MD4C/MD04-Planned Order -Order Report ) under Reseravtion number or else it will generate PR for componenet where as planned Order for FG.
    Creation of PR or Plnned Order depends on Procurment Type -E/F as well as selection of indicator Create PR in MD02.Basically , for MTO Sales Order item , it will FG  with procurement type E and compoenet will be F if there there is no farther sub-assblmy .So it should generate Planned Order for FG and PR for shortage qty of component .
    Hope this is clear
    Regards
    JH

  • Producrt Cost by Sales Order with Valuated Stock

    Hi Gurus,
    My client is having  Producrt Cost by Sales Order with Valuated Sales Order Stock. Can anybody reply me for my following issues.
    1. while calculating Sales order cost estimate thru VA02 , the same Cost estimate is appearing against with EK02 condition type in Sales order Condotions. what is the use of Sales order Cost estimate? is there any impact on production?
    2. What is Difference between Sales Order Cost Estimate and Order BOM Cost estimate?
    3.when can we calculate Sales Order Cost estimate ? whether before Production or before billing ? can anybody tell me please..
    4.while settling the production order also system picking the cost in VPRS not in EK02, i am not sure about this step.can any body correct if i am wrong
    5.I know we can caluculate WIP in Sales order also. when can we calculate ? before settling the Production order or after production ?
    thanks
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

Maybe you are looking for

  • Creating PDF in OAF page using DocumentHelper class

    I an trying to display a PDF from within an OAF page. I am generating the XML using a database function and getting the XML in the controller class as a clob object which I then converted into an ascii stream. I tested the stream, and I am getting th

  • My profile is missing so Firefox won't open at all. How do I reset it then?

    I had been using Firefox for a while off and on, but was using a different browser as my main one. Now that that browser is outdated and there's no update available, I wanted to switch to Firefox permanently. Since all of my bookmarks are only update

  • Sharing multiple external hard drives running multiple OS's on AEBSn

    Hi, I was hoping someone on this forum can help with this. I've been primarily a PC user but have converted to Mac thru a MBP. I purchased the AEBSn with the hope of having a networked storage solution for this mixed OS setup. The plan was to have mu

  • To upload the ZIP file and get the filenames available in ZIP file in ABAP

    Hi Experts, For my requirement, file from legacy comes as ZIP file with number of files in that. Please provide one code sample to upload the ZIP file from local workstation and get the filenames available in ZIP file to check few filename validation

  • Issues Capturing with Final Cut Express

    Hi I am currently having issues capturing with Final Cut Express. I am using a Firewire 800 gold speed cable 9pin/4pin with my Sony LSF-S58 camera. I use mini DV tapes and usually capture on other computers with no problems. However this time I am us