Cost transfer from one project to another

Dear  All
Kindly guide...
Cost Pertaining to Capital project to be captured as Expense project based on Managements decision. eg. Management decides to change an existing capital project  as expense project and settle the total cost as Expense.
Thanks in advance
Sujit

Dear Sreenivas
Hi! How r u?
Again I have need a clarification while settlement.
How can I settle Internal Activity cost to AUC?
See I created one network and also Internal Activity.
In Internal Activity assigned hours and confirmed it.
Than I settle Network to WBSE... its work perfect.
But when I settle WBSE to AUC its give error...
"Define a settlement cost element for receiver type FXA".
See WBSE to AUC working fine for Service activity, and Stock and non stock material assigned.
Even Checked allocation structue everything is fine.
For Internal Activity I used Secondary Cost element.
Hope U get it my requirement.
Kindly reply asap.
Thanks in advance.
sujit

Similar Messages

  • How do I transfer a clip from one project to another?

    How do I transfer a clip from one project to another?
    [Title edited to remove personal information... Mod]
    [personal information removed... Mod - https://forums.adobe.com/docs/DOC-3731]
    [This is an open forum, not Adobe support, please do not post personal information]

    Gene
    Thanks for the reply.
    For now assuming that you are using Premiere Elements 11, 12/12.1, or 13/13.1 on Windows 7, 8, or 8.1 64 bit....
    I am not sure that Left and Right channel audio editing is the answer to your DVD echo issue, but the opportunities for audio channel editing in Premiere Elements would include (before burn to)
    1. Audio Mixer - Balance.
    2. fx Effects/Audio Effects
    Please refer to https://helpx.adobe.com/premiere-elements/using/effects-reference.html#audio_effects
    for explanations of the Audio Effects.....
    Balance
    Channel Volume
    Left Fill, Right Fill
    Invert
    Swap Channels
    And, there is the free audio editor, Audacity Audacity: Free Audio Editor and Recorder for channel editing.
    Do you hear the echo before the burn to disc?
    Is any of the Timeline video content from your cell phone? If so, did you have any issues with a variable frame rate when you were preparing the video in Edit area for burn to in Publish+Share?
    What audio effects, if any, did you apply to the Timeline audio content prior to burn to?
    Please consider.
    ATR

  • Can't MOVE images from one project to another: must not understand

    Greetings,
    I have two questions as a result of aperture not working the way that I have read on forums etc. and am wondering what i am doing wrong
    1) How do I MOVE images from project to project without duplicating masters or versions
    2) how do I delete versions
    All of my files are referenced.
    *1) moving from project to project*
    I have a blue folder called "NEFs." In it, I have a default project where I just dump all of my images called "00 dump." After I dump them, I organize into other projects. So, I do the following:
    • I create a new project called "2008 Thanksgiving" inside the NEFs blue folder making it a sibling to "00 dump"
    • I go back to "00 dump" select all the images that were shot over thanksgiving, and drag to the "2008 thanksgiving" folder. The images transfer fine, but when I go back to "00 dump" I see that the images have NOT actually moved, they are now sitting in both projects. How can this be? I thought that if I move images from project to project then I am actually moving the master, not replicating a version? That leads me to my next dilemma
    *2) how do I delete versions?*
    Now that I have replicated photos in my "2008 Thanksgiving" project, I want to delete them since I see them still sitting in "00 dump." I do the following:
    • select the "2008 Thanksgiving" project
    • select a number of images
    • press command + delete (this is the only way to delete a file as far as I can tell
    • popup comes up explaining that if I delete this file it will delete the master too and the reference file. So, that's exactly what it does.
    Deleting the referenced file is fine for many junk images, but in this case, I just want to delete the copied version that seems to be in two projects now. Any help would be greatly appreciated. I would really love a full understanding of how this structure works.
    -i

    When you drag images and the drop target is an actual little yellow project box (not a folder, and album or anything else) the images move from one project to another, if your drop target is not the actual project but something else within another project all you do is cause the version to show up there, nothing is duplicated.
    To delete a version or versions selected just use command-delete. This gets rid of the actual version not just removes it from the current album view. If it happens to be the last version of that master it will get rid of the master as well.
    Have a look at this:
    [Aperture 2 Organization|http://photo.rwboyer.com/2008/07/apple-aperture-21-organization>
    RB

  • Moving Titles from one project to another

    I want to combine several iMovie projects into one, in order to create a single DVD via iDVD. The projects are fairly simple - no music, just video, dissolves, and some text.
    When I select all, and then copy and paste from one project to another, the titles do not transfer. The background for the titles - i.e. black spaces - do transfer, but not the text. It seems there's no simple way to move titles from one project to another. Is there a solution or workaround, or do I simply need to create new titles in my new, combined project? Thanks.

    The simplest way would be to use multiple movies in iDVD. iDVD handles multiple movies easily and will help you set up a menu if you want. Just share your movies to the Media Browser. Then open iDVD and drag them into your iDVD project from the Media Browser in iDVD.

  • Can you copy custom To Do List settings from one project to another?

    Using RH9. We created a number of To Do List entries for one of our Robohelp projects that we now want to use in all of our RH projects (File > Project Settings > Manage To Do List for Robohelp Project). Is it possible to copy these entries from one project to another? Or do we need to re-create the list of To Do tasks for each one of our 20+ projects?

    Hi there
    The "To Do" list items appear to be stored directly in the ProjectName.XPJ file. So theoretically it would be possible to copy them by opening one XPJ using Windows Notepad, copying them, then opening the target XPJ and pasting. However, this will likely cause a disparity between the XPJ and the .CPD. So before actually opening the project where you are copying them into, you would want to close the project and delete the CPD. Then modify the XPJ and re-open the project. A fresh CPD should then be baked up and things should be in sync.
    You might also want to submit a Wish Form to ask for an easier way to transfer custom lists. (link is always in my sig)
    Cheers... Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7, 8 or 9 within the day!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

  • How can I move an original Version from one Project to another Project?

    How can I move an original Version from one Project to another Project?

    From the Aperture User Manual:
    To move an image into a different project
    Drag the image [from the Browser] into another project in the Library inspector.

  • Vendor Open items transfer from one Recon to Another recon

    We have wrongly maintained one recon account in Vendor. 
    Is there any way to trnasfer Vendor Open items transfer from one Recon to Another reconciliation account..

    Hi,
    The best way is to transfer the items from old to new reconciliation account.
    Please use the following entries to transfer.
    1. Dr Vendor a/c(Old recon a/c)
        Cr Vendor clearing a/c
    After nullifying the balance in old recon account, here chage recon in the master.
    2. Dr Vendor clearing a/c
        Cr Vendor a/c(New recon a/c)
    F101 only post the adjustment entry at period end and reverse the same entry in next period. So, transferring the items is the best method. If you have volume of data, then create a LSMW for this.
    Rgds
    Murali. N

  • Can I copy clips from one project to another?  The clips are still frames captured within a video event.

    Can I copy clips from one project to another?  The clips are frames saved as stills from a video event.  I try the copy & paste but it does not seem to work.

    The video was converted into MP4 and then I could get it into iMovie events.  I had right clicked and saved farmes as stills.  ABout 50 of them,  When I tried to copy and paste those stills into another project I couldn't. They came up blank.
    I ended up going to a Genius appointment at my APPLE store this afternoon and was told that those "stills" aren't really anything. Not a .jpg or video, so the program doesn't recognize them.  So instead I'm using the Project with the 50 stills and copying other .jpgs and video into it.  (This is for a 1961 Class Reunion, so it's old stuff).  Seems to work so far.
    So bottom line seems to be I can use these stills created from a video in the project in which they were created, but no where else.  Do you know a way around this?

  • How can I move a photo from one project to another

    How can I move a photo from one project to another without creating a duplicate so I have the same photo in two projects.
    I seems to me in the past when I moved the photo from project 1 to project 2, I would get a number showing the # of photos being moved and you could drag and drop in the 2nd folder and the photos would disappear from project 1 and show up in project 2. is there a setting I am missing.  Now when I drag and drop the photo no red # shows up and the photo stays in project 1 and also shows up in project 2 apparently creating a duplicate.
    Any suggestion?

    Now when I drag and drop the photo no red # shows up and the photo stays in project 1 and also shows up in project 2 apparently creating a duplicate.
    The projects are the basic containers.  Each image and all its versions are in exactly one project.
    You can use an image in many albums, without duplicating it, also in many products like books, screensaver, slideshows.  But the projects are the basic structure of the library and you cannot have the same image in two different project, without duplicating it by storing the same original image files twice. Use albums to organize your library thematically.
    Sorry, I misread your question.   Dragging an image file between projects should move the image and all its versions to the other project.  Aperture should only duplicate the image, if you hold down the alt/options key while dragging and move the image otherwise.
    Which Aperture version are you using? And which MacOS X version?  Is your profile signature "MacBook Pro with Retina display, Mac OS 9.2.x, Aperture 3.5.1" still valid?
    In Aperture 3.6 on MacOS X 10.10.1 dragging between projects is still working as expected:

  • If I move a picture from one project to another in aperture why doesn't the jpeg change folders if all my pictures are referenced?

    I started importing all my pictures into Aperture and have been debating whether to use a managed or referenced library.  I'm leaning toward referenced, but before import everything that way, I do a couple of "test drives".
    In Aperture, I moved a photo from one project to another expecting that the jpeg in finder would move from the original folder to the new one, but it didn't.  Anyone know why?  Is there a way to make this happen?  Is it bad that I want this to happen?  Should I just use a managed library.  I like having control of the actual files (thus wanting to go with a referenced library).
    Any thoughts?
    Mark

    In Aperture, I moved a photo from one project to another expecting that the jpeg in finder would move from the original folder to the new one, but it didn't. 
    Mark, Aperture does not store the originals organized by project, but by the date of the Import Session. So moving an image to a different project will not change, were the original file is stored.
    This has a big advantage for backing up the originals. If they never move or change, you do not have to backup the originals other than directly after importing, if your library is referenced. And even incremental backups of a managed library are quicker.
    Is there a way to make this happen?
    You can always use the command "File > Relocate" to move the original files anywhere you want.
    Is it bad that I want this to happen?  Should I just use a managed library.  I like having control of the actual files (thus wanting to go with a referenced library).
    If it is bad, will depend on why you want to have control of your originals. If you just want to know where they are, it is o.k., or if you don't have enough space on the drive with the library and need to split the library across several drives. But it would be bad to move, edit, or access the referenced originals in any way. Let Aperture do the handling,  or you will be risking broken references.
    Aperture has several buil-in ways to show you the original: The "M" key will switch the Browser to the original, "File > Export > Original" will give you an exact copy of the original, or you can relocate the file to another folder.  I simply open the aperture Library in iPhoto, when I want to view my managed originals. iPhoto has a command "File > Reveal in Finder > Original" that will show you also the managed originals in the "Masters" folder inside the Aperture/iPhoto Library package.
    You may want to have a look at Terence Devlin's User Tip:                  How do I access my Photos in Aperture?
    Regards
    Léonie

  • Copy tracks from one project to another

    (Hopefully, I'm just missing something obvious. Programs like Final Cut Pro and PhotoShop make it very easy to have multiple projects open and copy and paste between them.)
    I frequently copy tracks I like from one project to another. Although it's possible to do, it seems a given that Logic doesn't not like to have more than one project open at a time. This complicates it a bit, but I just copy the track I want, close the current project and open the new one.
    I wish in the edit menu or in the track drop-down menu there was a straight forward "Copy Track" option. Since there isn't, I just select the whole track (which is essentially all the regions) and copy and then paste into new project. The problem is that it brings the content over fine, but not the track info (name, etc.)
    Is there some better way to accomplish this? I don't want to export MIDI tracks as audio, so the Export option doesn't work.
    Thanks,
    Dave

    Harmonica_Lessons wrote:
    I looked at the video again and unless they did some editing in FCP (which would have to be the case), the following frame after selecting the regions shows both gone simultaneously.
    It is quite possible of some FCP editing but as I said first you can do that very fast using two neighbor keys so it can look as one magic shot. The screen capture tools use low FPS settings for media capturing about 15 fps for example.
    I tend to occasionally put a blank track between other tracks as a separator (been doing this since the Master Tracks Pro days).
    I think you can try a little trick for doing that. You can create a "Dummy" empty region inside a folder track for example, and use the folder track(s) as separator(s). I have not tried that yet, cause I'm away of my Logic but it must work this way.
    !http://img59.imageshack.us/img59/4967/aglogo45.gif!

  • Cutting and pasting tables from one project to another

    When cutting and pasting existing tables from one project to
    another, the line weights for the cell borders seem to vary at
    random - some are the original line weight and some are heavier
    when pasted.
    I've tried sorting things out with the table properties
    dialogue, but to no effect.
    Is there a quick fix, or am I better importing in whole
    topics and then editing the imported topic?

    Hi Colum/Peter,
    It's not a custom table, I just need to copy an existing
    table from one project to another.
    My blasted developers (may the fleas of a thousand camels,
    etc), just decided to change the toolbars in one of our
    applications. As this toolbar appears in slightly different guises
    in about 6 tabs, I was trying to update the table that shows what
    icon does what and cut and paste that table into all the sub
    projects I have. Each table then only needs a minor edit for a few
    icons specific to that sub-project.
    Peter's on the right track. When I cut and pasted the table
    it also pasted in a number of lines of HTML associated with the
    styles in the other project. If I delete those lines, the table
    then appears as it should.
    Thanks for prompt response

  • How do I transfer from one ArrayList to another -

    Hi
    Basically what I want to do is transfer from one arayList to another using an iterator to iterate of the list and transfer certain entries to another - one is called lots, the other is called unsold.
    I don't want help with trying to get the right fields to transfer at the moment I'm just trying to get it to transfer EVERY entry, which I cant seem to to with this while loop
    public ArrayList getUnsold()
           Iterator it = lots.iterator();
            while(it.hasNext()) {
                    Lot lot = (Lot) it.next();
                    unsold.add(lot.getDescription());
                    return unsold;With the above all I seem to get is the first item in the 'lots' list to transfer even though theree are 3 items that need to be transferred...
    I have declared all arraylists and everything on this level works I just cant transfer items over properly...
    Any help is most appreciated.
    -greg

    Add these print statements (and others you think might help) to help you see what's going on: public ArrayList getUnsold()
           Iterator it = lots.iterator();
            while(it.hasNext()) {
                    Lot lot = (Lot) it.next();
                    System.out.println(lot);
                    System.out.println(lot.getDescription)());
                    unsold.add(lot.getDescription());
                    System.out.println(unsold);

  • Import package from one project into another

    Hello everyone,
    I have some projects.
    An enterprise and war project created in netbeans.
    I would like to use some files from one project to another. when I import
    the package I get the error-
    'package x does not exist'
    I have added the package to the project but I still get the error.
    I have also added the project to import to my glasspath but still.
    E.g.
    set classpath
    .;c:\enterpriseA;
    My next idea is to create a war project into my enterprise project and copy the files
    from the war project into it in order to use it. But I'm sure there is a better way.
    THanking you in advance.
    eve
    Edited by: evepokua on Nov 22, 2009 1:44 PM

    One mistake I keep making is that I don't add the package to the
    Dependencies of the plugin I'm writing. You have to go to plugin.xml,
    and add the package you depend on to the Dependencies section. Maybe you
    didn't do this?
    Michael
    nasti wrote:
    > Hello everybody!
    > I am new user of osgi and eclipse. I tried to do some of Oscar examples
    > but I had some problems. Namely, the problem in import of package from
    > one project into another in Eclipse.
    > I add first project to the Build Path of the second one.
    > I add to the first project manifest line: Export-Package example2.service.
    > I add to the second project manifest line: Import-Package example2.service.
    > But when I tried to execute these bundles the
    > java.lang.NoClassDefFoundError was occurred. May be you will help me
    > with this problem.
    > Thanks....
    >
    >

  • --Any way to copy/paste clips from one project to another w/o LOSING TRANSITIONS...??

    I have CS5...
    I'm trying to speed up render/export time. I have multiple edited video's in about 15 different projects.
    I had a couple video's within one project and rendered the work area - consisting of 4 video's...then exported. It was much faster than just going to straight exporting so I wanted to do the same with all the other video's.
    Pull everything into one project - render first - and export from there but premiere doesn't copy transitions from one project to another. Is there any way to get it to copy/paste transitions??
    Thanks

    exported regularly and took 2hrs 50min's for each video....then rendered and exported - took prob around 2hrs total - including rendering/exporting.
    That seems unlikely.  If anything, the separate render/export should take slightly longer (though not that much) as you may also have to transcode the preview files (depending on your preview codec) during the render, as well as decode them for the export.  Besides adding an additional layer of compression, it also adds time.  Here's what I mean.
    Export only:
    1. Decode original media
    2. Render new frame based on sequence, effects, titles, etc.
    3. Transcode that new frame to the export codec of choice.
    Render (1-3) /Export (4-5)
    1. Decode original media.
    2. Render new frame based on sequence, effects, titles, etc.
    3. Transcode that new frame to the Preview codec (if anything less than Uncompressed, this adds time and potentially degrades quality)
    4.  Decode the rendered frame (if not Uncompressed, which adds time)
    5. Transcode that (decoded) render frame to the export codec of choice.
    So you see, the render first process has two extra steps which add time, one of which could also introduce additional artifacts (depending on your preview codec).

Maybe you are looking for

  • Adobe Premier Elements DVACORE.DLL Crash

    Premier Elements 12 keep crashing on startup or shortly after startup with the same error message.  Here's the problem details: Problem signature:   Problem Event Name:    APPCRASH   Application Name:    Adobe Premiere Elements.exe   Application Vers

  • Reset samba passwords - Mission impossible?

    hi! Yesterday night I tried to set a password for a new user (of a Windows XP) so that I may connect my MacBook to a PC. Reason: I never managed to connect the both of them. I was always receiving a kind of "wromng user/password message (do not remem

  • Blogging application for SAP Portal?

    I would like to ask what kind of Blogging application is the SDN using on it's pages? We would like to add a blogging application for the Portal and have read that at the moment, there is no SAP built-in application for blogging. What would be the be

  • Planning login fails

    To all the planning gurus out there: We recently recovered our planning dbs from a backup, and we can login into wkspace, shared services but not into planning. I dropped all the system planning db tables (oracle) but still the issue remains. Any goo

  • Trial Version CS5

    I am trying to download the trail version of CS 5. The Adobe Download Assistanct page comes up.  I log in.  Then nothing happens.  I have turned my firewall off, and started over; but noghting happens. Any suggestions? Thanks Elaine