Costing Error in Production Order
Hi
I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
No itemization available for the corresponding material on the plant.
Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
Thanks in Advance.
Hi
If you are creating first time production order for the material using standard price you have to do standard cost estimate using ck11n
In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to and execute..Here only system asks for Itemisation.. Just press enter.
After that Update standard price using ck24
mark and release your standard price for the materail..
Reward points if useful..
Regards,
MSH
Similar Messages
-
Reason for Actual Cost Error in Production Order
Hi,
I have Convert the planned order to Production order but error message coming "Actual Cost Error".
what procedure that error avoid.
plz, Advise me.
By,
Jeevan.SHi
1.problem could be with the activity type costing.
check KP26 data maintained or not (for activity and costcentre assigned to work cneter)
2.IF order having CSER status then do the cost caliculation in the order, so that the status will go.(do thsi after correcting the KP26 data)
if still facing check the error
-ashok -
Cost center to production order
hi friends
i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
sapiansHi,
You have to check two things before executing this assessment cycle.
1. Check the allocation structure whether you have assigned the assessment cost element and
settlement of cost element to ORD (ticked in by cost element box).
2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
Have a check of the cycle before saving.
Regards,
Sadashivan -
Short Dump while executing costing run or production orders
Hi Guys,
While executing the costing run or production orders saving, we are getting short dump. it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
We have maintained the overhead rates correctly. There is no issue.
This could be some thing related to OSS notes as well.
Just wanted to know if it has got something to do with OSS notes or something else.
Please throw some light in this regard
Thanks in advanceHi,
In what program there is a dump? I mean, what is the log saying?
Regards,
Eli -
Selection of Costing Sheet in Production Order
Hi friends,
I have one query, details of which are as follows.
Costing sheet in Requirement Class - Blank
This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
Is this system behavior correct as per SAP Standard?
Kindly advise on the same
Regards
Madhusekhar Gupta GHi Madhu
1. Production order gets coating sheet from the valuation variant assigned to order type
2. The valuation variant that you assign to Plant is for standard cost estimate only
3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
You can assign different costing variant to the same order type per plant
Br. Ajay M -
Cost center for Production Order
Hi all,
We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for production order cost center wise. Please give us a solution.
With Regards,
R.Mahendiran.Hi,
Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
To understand the difference
201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
261 - Goods issue to Production order. Means you create a reservation through Production order and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
Hope this clarifies your doubt. -
Target cost for a Production order
Hi
How to get Target Cost for a production order?
Thanks
NagaWell Naga, Right now Im on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
I also notice cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
Here I am talking about 4.5b system.
You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
Here are the steps I followed .
1- I read the material which you can see in material component on production order in Co03.
After that I take the qty and also multiply by the cost at which machine is posted .
I have that programs, as I need to find out . Ill post you later .
But you have to read the tables afko,afpo,afru,caufv,cost ..etc
Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . Thisll also help you.
Hope thisll give you idea!!
<b>P.S award the points.!!! DOn`t forget :)!!!!</b>
Good luck
Thanks
Saquib Khan
"Knowledge comes but wisdom lingers!!"
"Some are wise and some are otherwise" -
Error creating Production Orders in UNCONSTR version
I am copying prodcution orders from version 000 to unconstr version through Report I am getting following error.
Error creating Production Orders in UNCONSTR version and Message no. ZSXXPAPO140.
when I am executed in background it is giving following error.
PPM FG100203.01_19_FR04_P for product FG100203.01 is not valid at the required explosion date 14.01.2010 /SAPAPO/RRP 325 E
Please suggest me any one it is a great help to me.Hi Venkat,
It seems there is an inconsistent PPM FG100203.01 exists
in your planning version from which you are copying.
Check the possibilities of repairing that PPM and retry
copying. Orelse In the /SAPAPO/VERCOP transaction,
under the product selection criteria, exclude that item and
try copying the version.
Regards
R. Senthil Mareeswaran. -
Costing issue in production order
Dear all
My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis is showing 25 quantity planned cost but in actual cost showing only one quantity .why?
Means EX . material cost is 1 rs in material master .
planned cost is 25
actual cost is showing 1 rs for first issue material cost
why system is not showing rs 25 actual cost in cost analysis in production order?Surendra,
A silly question but worth asking, have you tired displaying the order after the 2nd goods Issue, so times database updation take time. Please check now.
Regards,
Prasobh -
Error during Production Order Confirmation
I get a real wierd error during production Order confirmation. The error message is
"Additional items are not allowed
Message no. ZOAL010"
Can anyone throw some light on this?
Regards
Rajit is not std SAP message.
you can check the user exit for confirmation.
check in transaction code CMOD/SMOD for CONF* -
Product cost v/s Production Order cost
Hi all Guru's,
Can any one help me in understanding difference between product cost and production order cost in SAP.
Will give full marks for helpful answer.
Thanks,
Abhishek
Edited by: ABHISHEK AGRAWAL on Jan 29, 2008 9:46 AMDear Abhishek,
Standard Cost Estimate or Material cost Estimate is nothing
but the standard cost for the Inhouse Manufactured materials
(FERT) = Raw Materials Cost + Activity(Operation Cost)
Cost+Overhead Cost if maintained for the Company code.
This cost will gets stamped in the material master in Costing2
view,under Current Planned Price field.
This cost will be the Planned Cost of the Production order and
after confirmation of the order the actual cost and the variances
for the production order can be viewed.
So the Production order cost is for the order quantity say for
Eg: for a quantity of 100.
The cost(variance) will be settled against that production order
after confirmation and TECO status.
I hope this will be helping you.
Regards
Mangalraj.S -
Periodic cost settlement for production order
Hello All,
Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
Thanks & Regards,
Alok TiwariWIP entry gets passed to accounts if the order is not in DLV or TECO status.
or else variance gets calculated.
Two GLs which gets hit are
Change in stock a/c Dr.
To Inventory Price Difference a/c Cr. or vice versa......
Regards,
Divraj -
Settlement of Cost Center And Production Order Variance
Dear All
I have just started to learn SAP Controlling. I am able to get hold of some materials on Controlling. May I request the experenced forum memebers to please explain the following
1. How data flows from FI to CO and PA
2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
and a source where I can get some material on this topic. Your immediate replies and valuable peice of advice will help me a lot
Thanks
ArvindhDear All
I have just started to learn SAP Controlling. I am able to get hold of some materials on Controlling. May I request the experenced forum memebers to please explain the following
1. How data flows from FI to CO and PA
2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
and a source where I can get some material on this topic. Your immediate replies and valuable peice of advice will help me a lot
Thanks
Arvindh -
Authorization for Cost Analysis in Production Order
Hi,
Can I maintain the authorization for displaying cost analysis in production order.
I try to create transaction variant....into ZCO02 and ZCO03
but in COOIS it is still branching to CO02 when changing and CO03 when displaying.
I want to disable the cost analysis view in production order so PP people can not access it.
is there any idea?
Please help.
Best regards,
Freddy HaHi,
as i know K_ORDER is authorization for internal order.
We have activate the check in SU24,
but when we tried to trace the authorization when CO02 -> GOTO -> COST _> ANALYSIS
this auth K_ORDER is never check.
Did I miss something here?
Best regards,
Freddy Ha -
Transfer to PA the target costs of a production order
Hi everyone,
How can I transfer to PA the target costs of a production order?
Thanks
Cátia PereiraHi
1. Check your settings in KE4U - Strategy 001 must be assigned to PV=01 and Rec Type F
Tick the "Mat Cstng" indicator and assign COPA Qty Field ABSMG
2. Assign costing key to Mat Type in KE4J or KEPC
3. assign Cost Comp Str to VF in KE4R
4. Assign Value Fields to your variance categories in PA Transfer Structure....
Tick "Variances to Costing Bsed COPA" in your settlement profile
Br, Ajay M
Maybe you are looking for
-
I just recently bought an apple tv 2 off of ebay since it was cheaper than itunes price and when plugging in the hdmi and power cables nothing will pop up. I once got an arrow pointing at the itunes logo but other than that nothing. I even put it int
-
I am attempting to set the NAT type to OPEN for xbox live, for the xbox 360, on my WRT160N v2 wireless router, however, my xbox is hardwired to the router (since I dont have a wireless adapter for the 360). I cannot figure out how to change the NAT t
-
When I try to claim my points, it won't move forward until I agree to Verizon Selects, to which I will never, ever agree. How do you get your points without giving up any semblance of privacy?
-
Does 'versions' work with microsoft word, ppt and excel or just pages, keynote and numbers? I tried to do what the videos say but the little icon for versions is not there on word. Does this mean it only works for pages etc... or do i have to activat
-
Hi, I need help about export and import records(i.e) How can we export overall users and how can we import overall users from another database. For example we are switched to oracle 8i to 10g, from that we want to export all users records from oracle