Hi Guru's
We are on ECC 5.0. I am having issues when costing assemblies that consume materials created with Item category 'N - Non-stocked items' in BOM.
As an example, Material A is an assembly that consumes a raw material B that is purchased from a vendor. I don't stock raw material B but as and when required to make material A, I will purchase it from the vendor. So I created the BOM for material A with material B in it as a item category 'N'. I am costing material A and it does not pull all the cost components (i.e raw material costs on material B, freight charge from purchasing material B). All it does is shows up a value with out cost component splits.
But on the flip side, if I create the BOM for material A with material B as a stocked item (Item category L), costing of material A is showing all cost components perfectly.
Is there any configuration that I need to do to retrieve cost components when costing assemblies that contain non-stocked items.
Any input is really helpful.
Thanks,
MG

I think this will be a clear example:
Material B - Purchased and non stocked. Has a PIR and a vendor. Material cost is $10 and Freight is $1 - Total cost is $11.
Material A (ZSFG) - Consumes Material B. Material B setup as item category N in BOM for material A.
Costing of material A - costs with a price of $11. This $11 is shown in cost component for semifinished which it should not. Instead, it should split $11 to cost components Raw material - $10 and Freight - $1.

Similar Messages

  • Item Category N (non-stock item) in BOM creation - Preq Generation

    Hi All
    I have a material component that is planned in APO and not in ECC6. We would like to keep the one BOM for the finished good. Problem is that when we perform the backflush in ECC6, the system wants to backflush the material and causes errors due to missing stock.
    So I assigned the material as a non stock item in the BOM but the system will auto generate  a purchase requisitions for Non stock bom components (item category N) when the process order is created. It is possible to turn off the auto creation of the purchase req for non stock bom components? 
    I have tried the following:
    - Explosion type in item data, created new key with 'Switch off planning' indicator set in system configuration
    - created new 'Z' item category with inventory management de-selected
    Both approaches causes system error: Puchase data of material in not maintained
    I also tried leaving as a stock item with the bulk material indicator selected in the item data. This does not work as the cif will then exclude the component when data is transferred to APO
    Funny enough, the system does not generate a purchase req for non stock bom items when using Repetitive Manufacturing. Any help will be greatly appreciated
    kind regards
    Grant brockelbank

    Hello Vivek
    Thank you for your response
    The item is a non stock item. I do not want this item to be backflushed at all. This can be achieved using the 'N' non stock item category but the problem is that the system will attempt to generate a purchase requisition when the process order is created.
    I do not want the system to generate a purchase req in ECC6 as this item is a planning material that is planned in APO (used for medium to long term planning in a simulation version). We are hoping to use the one Bom for ECC6 and APO planning. The generation of the purchase reqs is a bit of a waste as we will never convert them and there is potential to cause issues for purchasing.
    Any other thoughts?
    Thanks again for your help
    kind regards
    Grant

  • Non Stock Item in Component MO to plan costs

    Dear all,
    Currently we have a problem regarding the display of plan costs in Maintenance Orders (MO).
    We will be using the non stock item in the component part of the MO.
    These non stock items will be maintained with standard setting.
    The problem is that these non stock items costs are not shown in the display of costs in MO.
    We have checked the plan costing variant for the MO, and nothing seems to be wrong.
    One thing to note though, the actual costs when the PO is GR-ed are shown in the correct value category.
    Please kindly suggest me on where to check on this matter.
    Thank you very much in advance
    Best Regards,
    Erwin Hartono

    Solved by our own team

  • MIGO Print label WEE1 for non stock items from GR for PO

    Hi,
    I added logic to print new label into printing program MZ07DETI which is printing labels for stock items. My label is for non stock items. The problem is that for non stock items printing process is not triggered. I created PO with Account Assign. Category F, P or K no material number and no storage location. For this type of PO no print possible during GR posting. Is any set up available in IMG to make it work. I appreciate any response.

    Hi,
    Please check up if there is any default value at the plant level;in case of such default,the system will post to the GL Account defaulted,not with standing the "standard item category".Better checkup if any cost center /order has been assigned.
    The GL item is defaulted thro'the item category.If both the goods and services have been defaulted to the same GL  Account,then not with standing the type [ie] whether goods or services,the system will post tot he same GL Acct.
    Hope this helps.
    Regards.
    Ramesh

  • Goods Issue Documentation for Text (Non-stock) Items

    Hi all,
    I have a business requirement to provide some form of shipping documentation for text (non-stock) items.
    The business do not want to create material masters (NLAGs) for these items as they are different/one off purchases.
    The purchase the goods and receipt with account assignment to a cost center or internal order, then sit on the inventory and send it out to customers along with real stock items.
    Any ideas on how I can provide some kind of supporting documentation, whether that is a delivery note, or just a simple GI Slip?
    Thanks,
    Mark.

    So they want to purchase items that they don't create materials for/don't get stocked yet want to include those items that don't really 'exist' in SAP on some for of documentation.
    If these items go with real Deliveries then why not add them as text items to the Delivery ?

  • What  is use of  Item Category N(non-stock item) in BOM creation

    Dear Experts,
                       What  is use of  Item Category N(non-stock item) in BOM creation ?
    regards
    rajakarthik

    Hi,
    This item category is used for components which are not kept in stock if they are used in a bill of material (BOM). Non-stock items can be entered in the BOM with or without a master record. To enter a non-stock item without a master record, you must simply enter a descriptive text.
    When you use this item category, the system automatically creates a purchase requisition for these components,
    Special functions
    The following functions are supported for non-stock items
    • You maintain purchasing data for non-stock items in the bill of material.
    • In the planning run, the system generates purchase requisitions
    instead of dependent requirements for components that are procured directly. When you configure your R/3 System for MRP, you can define whether direct procurement is triggered by the planning run or by production order management.
    • Product costing processes take valuation data from the BOM item.
    The system determines the release strategy on the basis of the price data you enter. The material group is required to produce a purchase requisition.
    Pavan

  • How to convert PRs for non-stock items through ME57

    Any idea how a PR for a non-stock item (just text) charged to a cost center can be converted into a PO through ME57?

    Hi Jürgen,
    Its requiring an information record when I enter a fixed vendor. Problem is I cannot create an info record because it is a text item (no material number necessary).
    Cheers.

  • STOCK AND NON STOCK ITEMS

    hi,
    Here i want to know the difference between stock and non stock items.and give detail process flow for procuring both Non stock as well as stock items .

    Dear Harshad,
    Stock Items are the item for which we maintain stock in the system normally at various level which means the stock quantity gets updated in the system based on the movement done for that item
    For ex if we make GR for 100 Qty of X item then its stock qty  gets added into the system may be at plant /storage location level.Suppose out of this 100 nos if we issue 50 nos for production line then the stock at store reduces by 50 nos & added to production cost center by 50 nos.
    Non stock material : NLAG: It stands for Non stock material
    In customizing for basic setting in material type neither Qty update or Value update. No accounting data is maintained in Material master hence stock values are not updated. This material is procured only with account assignment.
    In this case as soon as material is received Qty & value is posted to consumption account & statistic gets updated.
    No updation of Qty or value takes place in Material master record.
    For examle if we procure milk for canteen , its goes directly in canteen & stock of such items are not maintained
    I hope this will clarify your concepts,
    Vivek

  • Sales order line for Non Stock items progressed to Closed status, need to be Cancelled.

    Hi,
    First time posting to this community, I hope someone can help.
    Currently we have a setup where non stock items are being added to sales order lines (charges, etc.).
    These lines are being progressed through to Closed status automatically.
    Users are reporting that they have entered the line in error and would like to change the status of the line to Cancelled.
    We are unable to return the material (RMA) as it is non stockable/transactable etc.
    Current workaround is to adjust the stock and make finance aware so that the line does not get invoiced.
    However, the system still shows that the line is closed (i.e. provided to customer) which is not correct.
    Is there any way of getting the line to a status of cancelled?
    Your help is very much appreciated.
    Regards
    Tim

    Hi Arif,
    Many thanks for the warm welcome.
    I'm thinking the only course of action I have for future, is to make the items stockable/transactable/returnable such that an RMA can be performed if added in error.
    We can put a large qty into stock at zero value.
    Thanks for your help in any case.
    Tim

  • Unit of measure for Stock and Non-stock Item in CJ20N

    When I attach Material to an activity (item Category N   Non-stock item) in Project Builder (CJ20N), It is peaking its Base unit of Measure as unit. Now when I try to change it, it is showing an error
    Item category N: Only base unit of measure M allowed
    Message no. CO344
    But for the same material if I change the item Category to L   Stock item, then it allows me to change the unit.
    Please guide me regarding this Behavior. Is there any customization, by doing which it will allow me do the same for Non-stock Item or It is not Possible.

    firstly I am assuming that the activity is internal processing type - doesn't matter really
    now to attach a material select actvity and from the template area click and drag material which will open the material detail screen in the work area
    because it is a non stock item I am assuming text description - in the requirements qty you enter the qty and next to it the units - changeable
    if you choose a material number maintained as material master then obviously the unit will be from the material master.
    If you are using an externally processing activity then in config check OPUU for the network type and see if order unit has been populated - that might be the problem

  • Returning non stock items from a return sales order

    Hello Everyone:
    I have a return sales order that I am receivi9ng an error meesage on for only two of the line items...
    The Error Message is "update Control of movement type is incorrect (entry 651 X__L)...the other items on the sales order that are being returned are not having this issue only these two non stock items.
    i looked in OMJJ and see my movement type  and everything....I am making the assumption that this is due to the material type being non stock...they do not have a MRP view either....the VOV5 also shows the item category for the non stock item with DN...what am I missing...please help...thanks in advancve...

    Thanks for you replies...However I would not want a stock transport order receipt for this which is what the "X" would be...this is a customer return from a sales order...again this works for stock material that is being returned by the customer...it is not working for a non stock material only.  That is my issue..it is only erroring out on the non stock item category only....I am MM and have stepped into a position that was previiously handled by another...I have not ran into this error before so help would be appreciated.....Thanks in advance...

  • Is it possible to add value item and non stock item in one billing?

    Is it possible to add value item and non stock item in one billing?

    Hi,
    Yes,it is possible .Take example of service scenario,where material used in servicing and service charges(labour) can be billed in single invoice.
    Billing document type,Customer and other header data should be same.
    Reward points if useful
    Regards,
    Amrish Purohit

  • Procurement of more quantity than required in case of non stock items

    Dear Experts,
    Requirement is given below.
    I have one maintenance order with non stock item category N for quantity 5 pieces which is actual need.But user wants to procure 50 pieces against order and consume 5 pieces and rest will keep as stock.
    But in case of procurement against non stock item the moment we received the Goods (GR), all procurement quantity  will goes to consumption account and postings will happen accordingly.Correct me if i am wrong.
    Now my requirement is to keep the remaining stock 45 pieces (5 pieces consumed against actual need) as stock and to be consumed whenever there is a need.Can it possible to keep as stock in storage location which was procured against order as non stock item.
    How can i resolve this issue.
    Please somebody can help me.<<Text removed>>
    Thanks in advance.
    Reddiy.A.V
    Edited by: Matt on Oct 12, 2011 6:46 AM

    For the orders which you consumed, do the reversal of that material document. Also create one GR for the qty which has been returned to vendor & keeping the stock to storage location.
    In future, define those as stock items, so that this work around won't be required.

  • Non Stock Items not posting in AP Goods Receipt

    Is it possible for SAP to post transactions for Non Stock Items in AP Goods Receipt?
    I was hoping that it would perform the following, as it does for Stock Items:
    Dr Expense                        xxx
    Cr Allocation Account                  xxx
    Then when the AP Invoice is raised
    Dr Allocation Account          xxx
    Cr Creditos Account                    xxx

    I am currently using 2007A Sp 39

  • Purchase Non Stock Item

    Hi,
    I want to purchase one stock/non stock item for my order immediately.I did local purchase on urgent basis without any pr/po.
    So how can i book this against the order?
    Regards
    ebin
    <a href="http://www.isohunt.name/">isohunt</a>, <a href="http://www.utorrent.name/">utorrent</a>

    Have you created any PO / PR in system?
    If not, then:
    For stock items:
    Keep one dummy vendor (as Petty cash vendors can't be created in system), create PO for that vendor, then GR. Then do GI for the order.
    For Non stock items:
    Create PO for the same dummy vendor with reference to order (Account assignment is F), do the GR for the order directly.
    If GR has been done already, GR to stock or GR for order? Based on the accounting document, manual postings to be done to the order, I guess. Check with FICOCpeople.

Maybe you are looking for

  • Foutmelding 2093

    I keep getting the mistake 2093 when opening Quicktime player for windows. Anyone familiar with this problem

  • Site not showing responsively on mobile (viewport tag help?)

    I'm new to responsive design so bear with me... My site works responsively when I change the size of the browser window on a desktop, but on mobile it appears as a zoomed-out version. I tried several versions of the viewport meta tag to try and solve

  • What video formats do we have to include? webm?

    As I see in the documentation, The best way to include video is including MP4 and OGV formats, for the browser automatic selection of the right one, but is it useful/necesary to add a WEBM format too? Any other one? Tx.

  • All footage is gone

    When I opened the project I was working on and had saved several times, all the cutting I had done and all the footage was gone. What can  do to get it back?

  • Fetch From UWL to WD view :UWL Exception Logged in users context or session

    Hi, We have a requirement in which , we need to fetch all UWL Items and need to display these in a webdynpro view. We tried based on this link [Custom UWL|http://searchsap.techtarget.com/tip/0,289483,sid21_gci1240907,00.html]. Coding What I have Trie