Costing Run for all Hub Plants

I just want to understand from you regarding your Monthly Costing Run for all Plants.Actually we have Plant 5000 (Ruwais) which is our Manufacturing Plant having BOM.
We have two other Plants 7000 ( Shanghai ) and 7100 ( Singapore ) these are our Hub Plants not Manufacturing Plants and having no BOMs. 
When we run our Monthly Costing Run for Plant 5000 using TCode (CK40N), it’s completes smoothly without any error.
We have to create a material cost estimate in monthly basis using TCode (KKPAN) before we execute cost estimate for both Plants 7000 & 7100.
We see these runs at the months end as very time consuming and we are not manage on time set for such update in SAP as part of the month end procedure.

Hello Yasir,
In our system I see that PC01 and PC02 are the same for cross plant costing:
1 - Future Cost Estimate - valid for fiscal year
2 - Current Cost Estimate - no age restriction
3 - Previous Cost estimate - no age restriction
If your system is set this way, then for cross plant costing, it does not make a difference which one you use.
If all plants are in one company code then the currency should be the same in all, so P rate should not be an issue.
Take one part number: What period and FY is your current cost estimate? What are the validity dates?
go to CK11n, input the part number; <b>hub plant</b> number and create cost estimate.
On the Tab "QTY STRUCT."  you should see only Special procurement data, the plant number should be the mfg plant.
Look at the Costing Structure.  Top level should be the part in hub plant.
The first level below should be the part in the mfg plant.
theTosts should be the same and I would expect it to be the same as the current cost estimate.  (Pay attention to the currency)
If the first level from the mfg plant is not the same as the current cost estimate, you will need to figure out where that cost estimate is coming from.
If you would like to send screen shots of your cost estimate screens, give me your e-mail and I will contact you with pictures of what I expect to see.
Althea

Similar Messages

  • Costing run for materials with special procurement key

    Hello,
    Since moving to ECC6, the costing run for materials with special procurement keys is not pulling the marked price from the materials the special procurement keys point to. Only the released prices are pulled.
    Example:
    Material A, plant A has a future price (costing 2 tab) of 100 and a current price of 99
    Material A, plant B has special procurement key Z1 (costing 1 tab) which pulls the costing from Material A, plant A
    In our old system (46c) the costing run for Material A, plant B would pull 100.
    In ECC6, the costing run for Material A, plant B pulls 99
    Anyone that can push me in the right direction?

    Hi,
    Based on the info provided thus far, the result that you notice in ECC 6.0 is right as it is picking the current standard price based on your setup.
    Now why it is picking the future price in 4.6c, well for that you will have to do a detail check as in which variant is being used etc. I would suggest you to work with your CO personnel on this. Do a costing run for this particular material via CK11n using the variant which you mentioned & see the results.
    Or if you can upload the screenshots (picasaweb or some other portal) of the valuation variant you're using in 4.6c, along with Acctng view 1 & 2, costing view 1 & 2 details of the material it would help to have a better understanding.
    Regards,
    Vivek

  • Costing run for the material in Physical distribution Plant

    Hi experts,
    There's a material both creates in productoin plant 1000 & physical distribution plant 1999. (same material number)
    However, BOM & routing only create in prodution plant 1000.
    How do we copy BOM & routing (in prodution plant) for the material creates in Physical distribution Plant and excute costing run for it? (we need to excute costing run every month, so standard cost for the material in productoin plant 1000 & physical distribution plant 1999 needs to be the same every month.)
    Thanks in advance.

    HI AO
    1. There is no standard feature to copy the BOM/Routing from Plant 1 to 2...
    While creating in PLant 2, you can give the reference of Plant 1.. Or you can use some BAPIs to do the same
    2. If you want same std cost in Plant 2 as in Plant 1, then easier way would be to create a Special Procurement Key and assign the same in Material master - Costing View of Plant 2 (1999)
    Follow the steps below
    1. Go to OMD9
    2. Click on New entries: Enter your Plant = Plant 2 (receiver plant) "SP Pr Type" = Z1 and Proc Type = F;
    3. Under Special Procurement Secrion
    Enter U as special procurement and Plant 1 in the Plant Field (Transferring plant)
    4. Save this entry, and in Mat Master of Plant 2, specify Z1 as Special proc key in Costing view (NOT MRP VIEW)
    5. Run CK11N in Plant 2... and release from CK24
    Regards
    Ajay M

  • Creating Costing Run for Multiple Plants

    Hi,
    Is it possible to create a costing run for multiple company codes in a controlling area, instead of creating separate costing runs for each company code?
    Thank-You

    Christian,
    I understood it and my answer is for different company codes.I did it for one of my client.
    Let me review the scenario on system.
    Traci,
    I will get back to you on this by Tuesday(2nd March).
    Thanks.Ashok
    Edited by: Ashok Raut on Feb 26, 2010 1:34 PM
    Edited by: Ashok Raut on Feb 26, 2010 2:31 PM

  • Extractor 0CO_PC_PCP_03: diferent costing runs for the same material

    Hi, experts.
    We are extracting data with 0CO_PC_PCP_03 extractor, but some materials do not return any record.
    If we use CO standard transactions, we can get the values for all materials, but with the extractor just few materials are returned.
    We are filtering the extractor with the costing run name and costing run date, but some materials are not extracted.
    This is occurring for a specific month only. We have extracted data for other months / costing runs and the same materials appears in CO transaction and in extractor result. The different thing with this problematic month is that there are other costing runs of the same type (costing variant), for a higher date.
    It seems like the extractor just can extract the last costing run for a material / month. Any idea?
    Thanks,
    Henrique Teodoro

    Hello,
    I have an update in my findings. Few days ago, R/3 user ran a new costing run for a set of materials, using the same costing variant / costing version used one year ago. And now, when I extract the costing run created one year ago, materials present in recently run set don´t appear anymore. I ran this same costing run weeks ago and the material are ok. After the new costing run with the same costing variant / costing version, they are gone from extraction.
    Seems like this extraction just can return the last costing variant / costing version for each material. Or maybe the table key that stores this data are costing variant / costing version, instead of costing run / costing run date.
    Anybody have any knowledge or experience on this?
    Thanks,
    Henrique

  • Schedule a Webi XIR2 report to run for all values of the prompt ...

    Hi there,
    Any ideea about if it's possible to schedule a Web Intelligence XIR2 report to automatically run for all  150 different prompt values in the LOV (and have 150 different instances)?
    BOXIR2, Java deployment.
    Many thanks.

    You'd be scheduling the document 150 different times, each for one value of the LOV.
    You'd use the ReportEngine (REBean) SDK to read the LOV values, then use the Enterprise SDK to schedule.
    Here's a bit of code that illustrates how to schedule a Webi doc a single time with specified prompts.  You'd do something similar, but iterate the prompt setting and scheduling:
        IInfoStore iStore  = (IInfoStore) eSession.getService("InfoStore");
        ReportEngine reportEngine =  ((ReportEngines) eSession.getService("ReportEngines"))
                                        .getService(ReportEngines.ReportEngineType.WI_REPORT_ENGINE);
        IInfoObjects objs = iStore.query("Select TOP 1 * From CI_INFOOBJECTS Where "
                                          + " SI_KIND='Webi' And SI_INSTANCE=0 "
                                          + " And SI_NAME = '" + reportName + "'");
        //============================================================================
        // Open Webi document, then get and set Prompts collection
        //============================================================================
        IWebi            webi    = (IWebi) objs.get(0);
        DocumentInstance di      = reportEngine.openDocument(webi.getID());
        Prompts          prompts = di.getPrompts();
        for(int i = 0, m = prompts.getCount() ; i < m ; i++) {
            Prompt prompt = prompts.getItem(i);
            String name   = prompt.getName();
            if("Enter value(s) for State:".equals(name)) {
                Lov lov = prompt.getLOV();
                lov.refresh();
                Values values = lov.getAllValues();
                prompt.enterValues(new ValueFromLov[] { values.getValueFromLov(0),
                                                        values.getValueFromLov(1)});
            } else if ("Enter Shop Id:".equals(name)) {
                prompt.enterValues(new String[] { "261" });
        //===========================================================================
        // Copy prompts over to InfoObject
        //===========================================================================
        PromptsUtil.populateWebiPrompts(prompts, webi);
        //===========================================================================
        // Schedule Webi report to run once now
        //===========================================================================
        webi.getWebiFormatOptions().setFormat(IWebiFormatOptions.CeWebiFormat.Webi);
        ISchedulingInfo schedInfo = webi.getSchedulingInfo();
        schedInfo.setRightNow(true);
        schedInfo.setType(CeScheduleType.ONCE);
        iStore.schedule(objs);
    Sincerely,
    Ted Ueda

  • How to avoid report running for all the values in roll up of guided naviga

    Hi
    Thanks in Advance
    I have 3 reports on three different pages of a dashboard. (Implemented guided navigation on one column of each report).When I click on value of guided navigation column it guides me to report 2 for that particular value (is prompted), same way for 3 report also till here it works fine.
    However when I return from report 3 to report 2 and 2 to 1, the reports are running for all the values instead for the value which was passed by guided navigation of previous report earlier (Value on which I clicked to pass to the next report).
    Edited by: 808623 on Nov 9, 2010 2:10 AM

    Yes
    Example : If i click on values 'X' in report 1
    Report 2 shows results for 'X' only. And if i click on Value say 'Y' in 2 then report 3 shows for only 'Y'. But when i rollup from 3 to 2, Report 2 is showing for all values rather than showing 'x'.
    I'm using Link or Image Dashboard Object > Destination>Request or Dashboard (path of previous report)
    Edited by: 808623 on Nov 9, 2010 2:37 AM

  • Costing run for a material with alternative BOM

    Hi Friends,
    My requirement is to have product costing for a material with 3 different BOMs, in CK11N i can change the alternative BOM number to have costing run for 3 differesnt boms, but in ck24 how to proceed, My client requirement is such that the standard price should be the average price of the costing run from 3 different boms, and they are not interested in manual price change in MR21
    Regards,
    Arun Kumar R V

    Hi Arun,
    You can have a Standard cost estimate based on only one of the alternative BOM and Routing. This alternative is selected based on the business ie., whichever alternative is generally used in production frequently. This will be the std cost and whenever you do the production using the other alternatives, the difference in cost will be captured as Variance.
    There is no option of having average or cost estimate for each alternative at the same time.
    There is absolutely no use in maintaining price in MR21 for an in house produced material, since during Prod Order process the planned costs will be arrived at based on the quantity structure of BOM & Route only.
    Thanks & Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 7, 2009 8:57 AM

  • Costing run for co-product

    Hi friend,
    I have 5 different finished materials each having 2  same co-products. i could do the costing run for the finished materials, but how to the costing run and standard cost estimate ( i.e ck11n and ck40n) for the 2 co-products. the co-products does not have BOM and routing.
    Regards,
    Arun kumar R V

    Hi
        Sub  Co-Product will be costed based on 'Apportionment and Source structure' which is  maintained in Main Co-product material master.
    For example material 'A' has two co-products 'B' and 'C'.
    BOM and Routing will be maintained for material 'A' only.
    (BOM will contains 'Rawmaterials as well as co-products')
    In Material Master of 'A' we have to maintain  how to apportion this Qty structure of A to B and C also.For which we required source structure  which is need to create in IMG.
    Regards,
    Velmurugan S

  • Cost Run for Raw Material taking Standard Price instead of Moving Price

    Hi all,
    We ran a material costimate with normal components FG>SFG>RM.  The RM price Control is set to
    V (Moving Average Price) and for SFG & FG it is S(Std. Price).  After we run CK11N, the price for
    RM in Material Master changes as per Moving Price.  We found that the RM Component is
    costed based on Standard Price and not on the previous cost run Moving Average Price.  After
    certain period, if we again do cost run, the sytem is again picking up the standard price for costing
    not the revised Moving Price.  We have checked the Valuation Variant in the Costing Variant, where the strategy given is 1. Moving Average Price 2. Standard Price.  We also tried to change the
    sequence as 1. Price as per Purchase Info Record 2. Moving Average Price and 3. Standard Price and
    also 1. Standard Price and 2. Moving Average Price.  Our requirement is when we run the cost estimate the raw material has to pick the price of previous moving price stored in the Material Master.  Kindly tell us where to set the indicator.
    Thanks,
    Sadashivan

    Hi Srikanth,
    Problem solved.  I checked the sequence in Valuation Variant and modified in Valuation Variant for Plant which I have not set previously and now the system is working correctly.
    Thanks,
    Sadashivan

  • Sale Order MRP Run for All Order Line Items

    Greetings...
                     I have One Sales Order , in which i have ten different Line Items .
    Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
    How to take MRP Run of One Sale Order for all Line Items.???
    In MD50 , we can have sales Order with Item..

    In MD50 you can give only one item at a time.
    Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run  related to specific sales order Item.
    so either you need to do it multipal times by changing material or you need to go for MD02.
    Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
    Regards

  • Only one MRP run for diffrent companies plants

    Hi PP expert,
    my bizness scenario  is . there 2 companies  code one company code has 2 plant and another comp has 3 plant..only one product is assembling in all plant. suppose  finish material  X is producing in all company plants
    but  finish material X have component K and L, L is manufacturing in only one plant and supply to all company plant
    my client want to produce material component "L" for all plants  for his monthly  requirement with MRP run.
    component L is semi finish material and its is component of X
    but i am not under standing how will get requirement from  same company plants and other company plants. for Monthly MRP run
    Kindly suggest me how will take requirement from others companies plants for MRP run...
    kindly suggest me step by step
    Regards
    Aqueel

    Dear Friend,
    Only one MRP Run i.e. the Total MRP Run is possible at different plants but all must be under same company code.
    in your case ,plants are under different comp.codes , so it s quite difficult.
    Here I have to check the posiibility of using the special procurement key  to tranfer the material  between plants assigned to different comapny codes.  The particular Keys are ..
    40--Stock transfer (proc.from alter.plant);   70 -- Withdrawal from alternative plant   or 80----Production in alternative plant*
    If it is possible , then you can use this option of Special Procurement key.
    Otherwise you can use Plant to plant transfer movements like 647 to transfer beween plants against the Purchase order.
    Regards,
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:26 PM
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:30 PM

  • Costing Run for Configurable Material

    Hi,
    When I try to run costing run CK40N for KMAT material, I am geting information "No materials selected" for the 'selection' flow-step.
    Below is the Error description.
    No materials selected
    Message no. CK277
    Diagnosis
    Due to the costing variant used, no materials could be selected for the cost estimate.
    System Response
    No materials were selected.
    Procedure
    1. First, check that the materials you want to cost exist.
    2. Then go into Customizing and check the costing variant, the reference variant, and the transfer control. If the plant changes, a suitable transfer strategy must be entered in the transfer control belonging to the reference variant.
    Thanks in Advance,
    Shiva

    hi Shiva,
      It is not possible to do the cost calculation for configurable materials in CK40N or CK11N.
      To do the product costing it is mainly required the BOM and Routing, but in case of configurable materials the BOM and Routing are not fixed(here Super BOM/Super Routing are used with valid object dependencies which may result in "n" number of material variants)
    To do the costing for configurable material you can use t code - CU50 (configuration simulation)
    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant production and do the costing and check.
    Please check
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm
    Pavan
    Edited by: Pavanakumar on Jun 29, 2009 4:34 PM

  • MRP run for sub contracting plant

    Hi all,
    Please let me know if this scenario is possible:-
    I have two plant A and B. A is manufacturing plant and B is sub contracting plant. For one FG I plant there is demand of 100. After MRP run planned order is created for 100 for FG. For raw material purchase requisition for 50 is created and delivering plant will be B.
    In md04 for plant A I can see pur req for 50 and for plant B in md04 I can see 50 as stock requirement.
    Now use wants that if MRP is run for plant B, it should generate planed order against stock requirement.
    Strategy 11 we are using.
    Please let me if it is possible
    Regards,
    D.Dutta

    Hi ,
    Cross plant planning is possible ( like Plant A & B) , no need to run MRP in two plants separately  . but you need to the follow the following config .
    1) Define special procurment key ( Spro> MRP> Master data --> Define spl procurement key)
          You can copy standard key 40 , ( you have to defined supply plant and recving plant)
    2) Identify the Materials which are to be cross plant planning and go to material master MRP 2 view and assign Speial procuremnt key
    3) run MRP for FG in Plant A and down level MRP for  RM/PM/SFG  will be generated in plant B.
    I hope this will help your requirement .
    Thanks
    sekhar

  • Report at Material level(for all the plants)?

    Hi Experts,
    We have simple query which gives following output.
    &Plant&Material No&Creation Date&Issue date&QTY issued&
    P1      M1         01/10/2004    01/01/2005        10
    P2      M1         01/12/2004    15/12/2004        20
    P3      M1         01/01/2005    15/01/2005        30
    Actually I want to report at material level  ( for all plants in one shot ) , additionaly I want to show the minimum creation date for that material and minimum issue date  and sum of all 3 qty issued.
    The output should look like
    &Material No&Creation Date&Issue date&QTY issued
    M1           01/10/2004    15/12/2004       60
    Can any body suggest how do i get the date fields with the above condition
    Thanks in advance.
    Regs,
    Mahantesh

    Hi Mahantesh ,
    Try this:
    Take two more KFs in the cube.
    1) Creation Date as KF
    Type: Date
    Exception aggregation : First value
    Aggregation reference : 0material.
    2) Issue Date as KF
    Type: Date
    Exception aggregation : Last value
    Aggregation reference : 0material.
    In the query take 0material in rows and above 2 KF in the columns (May be , here , you need restriction also. 'Creation Date as Characterstic' > 01.01.1000 ,Issue Date as characterstic' < 31.12.9999 )
    With rgds,
    Anil Kumar Sharma .P

Maybe you are looking for

  • Page appearance questions

    Hi, I would appreciate some tips in how to format pages in my application. Please refer to the "TestRequestSystem" application using the following credentials: workspace: worklabdemo username: helpme password: please http://apex.oracle.com/pls/otn/ M

  • Creating a sitemap late in the game

    I've created an entire site using a single template and about 7 pages. I've been told that the site map is how search engines find your site info. What is the best way to create one for an existing site? Is there a better way to make sure search engi

  • Photo printing- A4 page- page size is incorrect?

    Hi, I have a HP 7500 Printer I have a photo in 3:2 ratio, A4 page.  I try to print but it spits out the page and says 'Paper mismash. Paper size or type is incorrect. Press ok to cancel job. Anyone able to help? Thanks Pa.

  • AS3 stop(); not working w/ Multi URLRequest

    When I place one link in AS3 with a stop everything works great!      stop();      import flash.events.MouseEvent;      //---link1      var getLink1:URLRequest = new URLRequest("http://www.google.com");      link1btn.addEventListener(MouseEvent.CLICK

  • Animation I was working on before won't open in Creative Cloud

    Hi -- I was working on an animation in my Flash Trial and now I've joined Creative Cloud. I dragged and dropped the file into Creative Cloud, but it won't open so I can continue working on it. Any ideas? Thanks.