Costing variant , how to config rounding for component quants ?

Hello everyone ,
i am new to CO-PC
my user want to change rounding for component quants.
Current setting is u2018Round up with Nondimensional units of Measureu2019.
This affects too high loss in standard product cost due to rounding up.
For instance, 24 pieces of product are packed in one shipping carton.
Based on standard cost calculation per 100 pieces,
shipping carton usage is computed as roundup of (100/24) which is 5 pieces.
Once in the actual production,  production lot size is 10,000 pcs.
Target shipping carton usage would be automatically calculated as (5*24,000/100) = 1,200 pcs
whereas in the reality, 1,000 shipping carton should be used (24,000/24).
As a result, material usage variance is shown too high due to rounding up.
you can see detail in below website (there is only picture in website)
[http://picturepush.com/public/4467052]
thank you in advance.

Hi
I dont think this behaviour can be changed....
There is a workaround though, in acordance with SAP recommendations
Increase your costing lot size to 10,000 or 1000 or as much as reasonably possible... Also, increase your Price Unit and keep it same as Costing Lot Size....
For Existing Material Masters: Go to T code MM17 and change MARC-LOSGR (Costing Lot Size) and MBEW-PEINH (Price Unit)....You can change in mass mode
For New Material Masters:  Using BADI MATERIAL_REFERENCE, you can default the costing lot size and price unit as 10000 or 1000 as desired
Regards
Ajay M

Similar Messages

  • Costing Variant not visible in CK24 for my plant.

    Hello Experts,
    Using transaction OKKN, I have created a new costing variant ZPC1 to take the place of PPC1 for updating standard cost in the material master.  I basically copied most of the parameters ( including the Costing Type) from PPC1 but changed to a different Valuation Variant.  Running CK11n successfully generates a cost estimate without error (status KA) that meets our requirements. 
    The trouble is in transaction CK24.  I click the Marking allowance icon and I see both our actual plant, and the dummy preconfigured plant 0010.  For our actual plant, I also see the fields populated for Costing version 1 and Released check mark.  If I drill down on our plant, I get a pop-up for "Permitted std cost est variants", showing only PPC1.  However, if I drill down on the dummy plant 0010, I first get a search pop-up for "Permitted std cost est variants"  with an open field for "Costing Variant".  Drilling down further shows both PPC1 and ZPC1.
    I think maybe a "Costing Version" has been defined for our actual plant, and that is pre-selecting PPC1 and preventing me from using ZPC1, but when I search in config (transaction OKYD), I see nothing defined.
    Any help would be greatly appreciated.

    My problem has been solved.  There was actually nothing wrong with the configuration.
    The problem was that the Marking Allowance had already been activated for costing variant PPC1 in period 11/2009.  This was visible from the marking allowance screen by the population of the fields Costing Version 01 and the check mark in the field Releaded.
    Now that we have moved on to period 12/2009, the Costing Version is blank and I see both Costing Variants available.  When I select a variant to allow marking, the Costing Version gets populated.  After running CK11N again to create a cost estimate for period 12, I was then able to Mark and Release my new estimate and verify that the new Standard Price updated in the Material Master.
    Thanks for your help, and I hope this record may be of value to others.

  • How to config JSSE for UDDI4J???

    Hi, i am using uddi4j to access uddi registries. As you know, when you use the publish api, it use the https connection.so we need to do some configurations for JSSE. I have downloaded JSSE,but i just don't know how to config it in the java.security file.please help,thanks:)

    If you are using java 1.4 > JSSE is now included in the release and you shouldn't have to do anything.
    If you are using an older JVM, you can also add the jsse.jar file into your classpath and register the appropriate provider implementation class:
    System.setProperty("java.protocol.handler.pkgs",
    "com.sun.net.ssl.internal.www.protocol");
    java.security.Security.addProvider(new com.sun.net.ssl.internal.ssl.Provider());
    Or try googling the subject and look at links similar to the following:
    http://www-128.ibm.com/developerworks/webservices/library/ws-uddi4j2.html
    Cheers
    Todd

  • How to config CDM for user Authorization

    Hi Sir,
    Can you tell me how to config CDM 4630 for user authorization with different privilege by using radius server
    Regards

    Here is a link on configuring user authentication on acns.
    http://www.cisco.com/en/US/products/sw/conntsw/ps491/products_configuration_guide_chapter09186a008008123f.html
    Not sure if there is one available for authorization too.

  • How to config OrgRule for check of equality

    Hello,
    We use GRC Compliance Calibrator V5.2. Our RuleSet also contains Risks based on organization levels.
    We have a SOD-Risk (R006) made up of two functions (YK06 and YK08):
    Risk Function     TCODE     Auth.Object     Field     Value from     Value to     Condition     Status
    R006     YK06     F-42     S_TCODE     TCD     F-42                         AND          0
    R006     YK06     F-42     F_BKPF_BUK     ACTVT     1          2          AND          0
    R006     YK06     F-42     F_BKPF_BUK     BUKRS     $BUKRS                    AND          0
    R006     YK08     F110     S_TCODE     TCD     F110                         AND          0
    R006     YK08     F110     F_REGU_BUK     FBTCH     2          31          AND          0
    R006     YK08     F110     F_REGU_BUK     BUKRS     $BUKRS                    AND          0
    Risk R006 is only critical, if the two BUKRS in the definition are the same value.
    A User with BUKRS = 1000 in F-42 / F_BKPF_BUK  and with BUKRS = 1000, 2000 in F110 / F_REGU_BUK is critical.
    A User with BUKRS = 1000 in F-42 / F_BKPF_BUK  and with BUKRS = 2000 in F110 / F_REGU_BUK is not critical.
    We feel that the following OrgRule-Definition does not cover the requirement:
    OrgRule ID     Risk     Org Level     Value From     Value To     Search Type
    OR-BUKRS     R006*     BUKRS          1000          1000          AND
    OR-BUKRS     R006*     BUKRS          1000          1000          AND
    Our question:
    How must the OrgRule for Risk R006 be defined in order to flag only Users with identical BUKRS as critical?
    Thank you very much,
    Jürgen Holtz

    Hello Mr Alpesh,
    thank you for refering me to the Quick Reference Guide "Organizational Rules and Organizational Level Reportingu201D. I am aware of this document and have followed it.
    However, it does not exactly address my problem as the document explains how to set up OrgRules that cover two different OrgLevels (eg. BUKRS and WERKS).
    In my case, I have a single OrgLevel.
    However, I have found out that a single-line OrgRule solves my issue.
    It is the following OrgRule:
    OrgRule ID     Risk     Org Level     Value From     Value To     Search Type
    OR-BUKRS     R006*     BUKRS          1000          1000          AND
    Again, thank you for your input.
    I close this posting as this question is now solved for me.
    Best regards,
    Jürgen Holtz

  • How to config NACE for printing debit memo request ?

    hi,
    I've tried to config with the transaction NACE for SAtype GV ( debit memo request )
    In SPRO in config :
    GV     Deb.MemoReq. f.Ctrct     V10000     Order Output     ZBA0     
    but then I used the transaction VA02 to print document header, The status is always in yello ( not processed ) , I do not know why , could you please help me ?
    Thanks

    hi,
    I used Analyse determination and it show me that :
    The "output not found" Access 10, message 450.
    and the description:
    Diagnosis
    No valid output conditions found for the application object.
    System Response
    For this reason no output proposal was created.
    Procedure
    Execute function
    I do not know the reason why .  This is for printing a billing request ( GV)

  • How to view lifecycle for component usage

    Greetings-
    I have declared use of one component to another in the diagram view.  I initially set the lifecycle to "CreateOnDemand" using the "New Component Usage" wizard but now I'd like to change this to "Manual".  However, I don't see the lifecycle when I view the properties of the referenced Component in the diagram view.  How do I find/change this?

    Hi,
    In WebDynproExplorer expand the "UsedComponents" node under your component .
    Double click on the usedComponent and you can change the lifecycle property.
    Regards, Anilkumar

  • How to config SSL for stand alone ITS

    Hi,
    I need help configuring SSL for ITS. Please let me know if smebody has the documentation. W ealso use EP6 Sp02 portal.
    Thanks,
    Srini

    Hello Jeremy,
    There is a document describing the parameters: ITS_Service_Parameters.pdf
    You can find the online descriptions at:
    http://help.sap.com/saphelp_nw04/helpdata/en/1f/ef243a84da356be10000000a11402f/frameset.htm
    The not so common ones are only listed, you have to search for notes on those parameters.
    ~host/port(un)secure are used to switch protocols, say I access the ITS over https on service "A":
    https://host/scripts/wgate/A!
    In the template I want to switch to non secure service B.
    http://host:8080/scripts/wgate/B!
    The Agate does not have enough info to generate the full URL from the info it gets outof the first request; how should it know that the non-secure is running at port 8080.
    Therefore you need to define these values (n.b. on the same machine one can also have different hostnames for http and https access)
    Some controls in ITS also generate full URLs and rely on these parameters being set.
    If you have multiple wgates from different domains to one agate then you cannot live with the 1-1 Situation and you have to overwrite the headers at the wgate side (note 744768).
    Regard,
      Fekke

  • How to config SAF for searching in CRM

    Dear Sir,
    I would like to configure SAF for seach the Knowledge search in CRM, Do you have any step or manual ??
    Thank you and best regards,
    Vimol

    i can find the solution

  • Sales order vs costing variant

    hi
    in production order ,in OKKN we take costing variant for standard cost estimate and calculate in CK11N  and released  then is updated in order CO01 through costing variant in OPL1 here we select 2 costing variant PLAN and ACTUAL. ok
    for sales order in VA01we will calculate costing in menu -extra- costing--
    1. is it standard cost estimate like CK11N,
    2.while creating CO08  for sales order here we enter production order type PP01, in this order type already costing variant PLAN and  ACTUAL would have assigned for oder type
    so how it calculate plan and actual
    or
    first we have to configure all production order setting upto CO01 and after taking production order goods receipt then we we have to create sales order setting like requirement class,type,VA01 and CO08.
    plz tell me sequence for sales related order
    thank you
    sowmya

    Dear Sivani,
    I think that in your MTO scenario Sales Order item is not a cost object. And hence, the production shall be done thorugh a production order and the actual costs of material and activities, overhead shall be compared with Sales order cost estimate. The production order shall be settled to FI and COPA. FI and COPA captures the variances. At the time of billing, the COPA gets the Revenue, COGS and its components. If that is the case the following building block shall be handy in configuring your requirement. Pl go through the same and revert if you need further input.
    E45_BB_ConfigGuide_EN_US
    Trust this helps much!
    Cheers!

  • Config Setps for Trex in CRM 5.0

    Hi All,
    How to config Trex for CRM5.0 ?
    Thanks,
    Nagesh

    Hi Rao,
    I am mailing u a doc for TREX post Installation configuration.
    Im sure it will help u.
    Reagrds,
    Sumit

  • Product Costing - Two Costing Variants - Mark and Release In Same Company Code Same Period

    Hi All,
    We are currently handling a CO-PC project where client has requirement to use two different costing variants in the same period in the same company code. SAP standard does not allow use of two costing variants in the same period for the same company. We can have only One Costing Variant per Co Code for Marking / Releasing Standard Price. 
    There are some materials in Plant 1 or Plant 2 for which cost estimates using costing variant ABC1 calculated and than prices are marked and released (CK24), now same materials are received in Plant3 where mixed costing is used and thus need to have cost estimates from second costing variant ABC3 (second costing variant) marked and released. Object is to have ABC3 cost estimates in material master standard price field, but SAP does not allow to mark and release for second costing variant in the same period for same co code as ABC1 variant already ran for plant1 or Plant2 under same company code,therefore, business is not able update ABC3 prices in Standard price of the material master. 
    Purpose of this second costing variant mark and release run is that for some materials business would like to implement costing at Plant3 level also, where they get same materials from different production sites (Plants). At Plant3 level, business is using mixed costing where the standard price is a weighted Average standard price, taking the different production sites standard cost into consideration in combination of the volume split between those production sites.
    Did any one worked on this kind of requirement? Is there any SAP standard way to handle? Or this will need some ABAP enhancement?
    Kindly advise.

    Hi Atul
    1. You dont need separate Valuation Variant in Plant 3
    2. Use Costing Variant ABC1 and ensure that it has the needed Valuation Strategies in Valuation Variant
    Allow Complete Transfer in the Transfer Control i.e. Cross Plant Transfer in it
    3. Assign the Qty Str Type you have used in ABC3, to ABC1.. i.e. In the Costing Version, assign the Qty Str Type to the Costing Type and Valuation Variant from ABC1
    After this, do CK11N and CK24 for Plant 1
    Then do CK11N and CK24 for Plant 3, using ABC1.. You dont need to change anythiing before doing CK11N for Plant 3
    To make it simple, you can use any one of ABC1 or ABC3 in both the plants.. You only need to ensure that Valuation Variant, TRansfer Control are set up as desired
    Br. Ajay M

  • New Cost Component Structure in new Costing Variant

    Hi gurus,
    i created a new costing variant (to be used for planned prices, for budget purposes), then a new cost component structure.
    Now the system (transaction OKTZ) doesn't allow me to assign the new cost component structure to the new costing variant forcing me to mask the costing variant with ++++.
    But the aim, for me, is just assigning the new cost component structure to the new costing variant only for a company code and only for a plant.
    Does anybody know how i can reach the goal? Am i missing some step?
    Thanks in advance for the collaboration,
    Best regards
    Enrico

    Hi Utenza
    You can very well achieve this
    1. First of all ensure that a masked entry exists i.e. ++++ in Comp Code field, Plant Field, Costing variant Field and assign the Prmary cost comp str here
    2. Then, coming to the new costing variant and new cost comp str,
    a. Enter ++++ in the comp code field
    b. Enter your plant name in the Plant Field (and not ++++)
    c. Enter your new costing variant here.. (This should be the costing variant where costing type is not 01)
    d. Assign your new cost comp structure here against this costing variant
    Regards
    Ajay M

  • How to config a shared cache for multiple environments with C API

    How to config a shared cache for multiple environments with C API?  Just like Java edition. Chapter 2. Database Environments
    I want to open large number of databases, at least 10,000. But as the counts of databases opened increase, the db->open operation become very slow. It almost cost 2 hours to 10,000 databases.
    So I try to distribute these databases to multiple environments ( for example, 5 envs ). And in order to improve the efficient of memory use, I want to share cache between envs.

    Hi,
    It is not clear what you meaning about multiple environments. Do you mean these environments are in different directories or  in the same directory ? If you mean environments in different dirs share the same cache, it is interesting why you need that.
    If you do not use DB_PRIVATE to open the environment, the created cache will be on disk, in the environment directory, so it can be shared by multiple processes and multiple threads. Currently, the cache file is in the environment directory, and we do not support specifying a separate directory for cache only.
    Regards,
    Oracle Berkeley DB.

  • Can we use two costing variants for standards cost estimate release.

    Hi,
    We have 2 plants (plant 5100 and plant 5200) under company code 5000.
    We have run standard cost estimate(CK11N) for material 98001000027 at plant 5100 using costing variant ZG01 and at plant 5200 using costing variant ZG02. First, we released  standard cost estimate (CK24) for this materia at plant 5100 and set (in marking allowance) costing variant ZG01 and costing version 01. Next time when we are trying to release the standard cost estimate for the same material for plant 5200, it is automatically picking ZG01 as costing variant in marking allowance and it is not allowing to change the costing variant to ZG02 saying Company code 5000: Release already carried out, cancellation not possible, Message no. CK797.
    Is it possible to use two different costing variants for release of standard cost estimate for a material at two different plants at the same company code? If so how?
    Please suggest.
    Thanks,
    Bijay

    Hi,
    Thanks for your reply again.
    What is the benefit of assigning "Single Valuation Variant same to different Plants" ? In costing variant also we can assign maximum only one valuation variant and this valuation variant will default for all the plants, and hence I dont think it is necessary to assign same valuation variant to different plants.
    My  issue is :
    Example: ( Standard Cost Estimate for material 98001000027)
    Plant - 1
    Material Cost                                             Rs.100
    Labour Cost                                               Rs.50
    Overheads (10% of Labour Cost)                  Rs.5
    (say ,through costing sheet - 1)
    Total Standard Cost Estimate                      Rs.155
    Plant - 2
    Material Cost                                             Rs.150
    Labour Cost                                               Rs.100
    Overheads (20% of Labour Cost)                  Rs.20
    (say, through costing sheet - 2)
    Total Standard Cost Estimate                      Rs.270
    Now, Please explain why we cannot have two Standard Cost Estimates for a material at two different plants? If it is possible to have two standard cost estimates for a material at two different plants, how to take care of  overheads (rate of which varies) at two different plants (plant - 1 > 10% and plant- 2>20%) as we can assign maximum one costing sheet to a valuation variant variant?
    How to map the system so as to meet the above requirement?
    Thanks,
    Bijay

Maybe you are looking for

  • Http to File Scenario

    Hi, I am doing Http to File Scenario i.e, Receive message via HTTP, Process it and write the file in the target. 1. As Http is the sender, I need not create Sender Communication Channel and Sender Agreement. But While Creating other objects in the ID

  • After canceling a pre-order from iTunes I don't have the money credit back

    I recently pre-ordered an album from iTunes on my iPod Touch. (gift card) After about a week I decided that I'd rather get the actual physical disk from the store once it's released, so I canceled the pre-order and  I was told by the iTunes store tha

  • Error in loading data into PSA from source system.

    Hi Experts !!! Good morning . I am trying to load data from SRM source system into BI system.When I execute infopackage,the data is not loaded into PSA and status of the process immediately becomes yellow.After sometime it gets timed out and converts

  • Installation of Adobe Reader Stops

    I had issues with Adobe Reader so I ran the repair from the Control Panel which did not work then I uninstalled the program.  Now I am unable to reinstall the application as the installation stops before completion.  I went through the troubleshootin

  • Audigy 2zs Gamer and Windows Vista / Windows 7

    .Audigy 2zs Gamer and Windows Vista / Windows 7? Hello, I am just wondering if it is a known issue to have really loud static and crackling when playing games using this card in Vista or Windows 7. I had this issue playing Bioshock a few months back