Costing with special procurement

Hi ,
I have bunch of materilals in 2 palnts (Say A,B) two different company ocdes(Say X,Y) , one plant  (B) which is having F/-/aa , where F is Extrenal Proc/Mrp special -/aa is the Costing Special Proc.key pointing Plant "A" as primary plant
I costed these parts in plant "B" without costing the plant "A" , It Didn't Give Any Error Message And Pulled The Plan Price From"A" plant .
I wonder how can plant "B" pull the price from plant " A"  which is not costed. and surprisingly it costed the primary plant  "A" first just 3 seconds before it costed Plant "B "
how can this possible does CK40N allows to carry other plants cost roll for those which are having like F/-/aa kind of master data even we don't specify those plants in CK40N?
I gave only plant B in the selection but not A
Thank you ,
Paarthu
NOTE:
Pattern F/-/-
F--External pro
Spec.Proc. MRP
Spec.Prcu. Costing
aa is the primary procument plant key  Plant "A"

Hi all,
Thank you for your time,
I found this,
Std.SAP allows that if we are doing a cost estimate using the CK40N and (Ex:1 plant ) , but if that plant is having some materilas which are procured from other plants SAY F/-/ab
"ab" IS THE OTHER PLANT called XY,even though you don't mention the plant for "ab" system wil do cost estimate for taht materila in XY plant and will get the cost estimate and will redo for the main plant which we used in selection parameters,
it is true for different entities/CCOD  if they exixt in same Controlling Area.
Thank you ,
Paarthu

Similar Messages

  • Costing run for materials with special procurement key

    Hello,
    Since moving to ECC6, the costing run for materials with special procurement keys is not pulling the marked price from the materials the special procurement keys point to. Only the released prices are pulled.
    Example:
    Material A, plant A has a future price (costing 2 tab) of 100 and a current price of 99
    Material A, plant B has special procurement key Z1 (costing 1 tab) which pulls the costing from Material A, plant A
    In our old system (46c) the costing run for Material A, plant B would pull 100.
    In ECC6, the costing run for Material A, plant B pulls 99
    Anyone that can push me in the right direction?

    Hi,
    Based on the info provided thus far, the result that you notice in ECC 6.0 is right as it is picking the current standard price based on your setup.
    Now why it is picking the future price in 4.6c, well for that you will have to do a detail check as in which variant is being used etc. I would suggest you to work with your CO personnel on this. Do a costing run for this particular material via CK11n using the variant which you mentioned & see the results.
    Or if you can upload the screenshots (picasaweb or some other portal) of the valuation variant you're using in 4.6c, along with Acctng view 1 & 2, costing view 1 & 2 details of the material it would help to have a better understanding.
    Regards,
    Vivek

  • Sales order with special procurement

    Hi,
    We are having a problem raising a sales order were the material has a special procurement marker as there is a clash between this and the Item category we have to enter on a sales order.
    We get our products manufactured by an outside supplier. To help with lead times we had them build product up to a specific level which we paid for and which we are holding as semi finished goods. To finish these goods we are sending them to the supplier for the final assembly. We are able to do this by linking the materials to a purchase order thus giving us the final assembly value. To allow this we have had to change the special procurement to 30 on the material for subcontracting.
    Now when we try to raise a sales order and enter the item category which we need to enter the system is giving us a error meesage that the category can not be used with a special procurement type.
    Does anyone have any suggestions as to how we can get round this? We have to use the item category in question as it is linked to the plant and material.
    I have not posted on the site before, so please bear with me in regard to my query.
    Thanks Paul

    Now when we try to raise a sales order and enter the item category
    Ideally, item category should flow automatically in sale order and why do you want to input manually?   Moreover, in order to understand your requirement further, please share the configuration settings of your item category and also update what special procurement type is maintained.
    G. Lakshmipathi

  • Special procurement type 40

    Hai PP Gurus,
                 What is the function of SP type 40? Where it is used ?
                 Please put your valuable answers........
    Thanks & regards,
    S.ganeshraja

    Ganesh,
    If a material is always procured from another Plant, then we use Special Procurement Key "40" to do automatic planning so that after MRP run system creates requirement for the supplying plant and PR for the requried plant, when ever there is a demand at required plant.
    You need to configure the special procurement key in transaction OMD9 for the required plant and here you assign the supplying plant with special procurment type as "U". This key you need to assign to the material master in MRP2 view in the required plant.
    You can go through help for details<b>....<a href="http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm">SPK-40</a></b>
    Regards,
    Prasobh

  • Special Procurement and In-House Production on the same plant?

    Hi All,
    There is a Plant A and Plant B. Plant A makes its own stock of material Z and sometimes gets it from Plant B as well through STO. For such cases where a plant gets stock from another stock, we have a special procurement type configured with the supplying plant. Now in material Z's master record (Plant A) I need in-house (E) and external (F) both WITH special procurement type. So I used X (both) and special procurement type. I got a warning that F is required. Saved it. Now when I enter a PIR on Plant A and run MRP, it directly made an STPO for Plant B instead of scheduling production at Plant A itself. There is no fixed criteria except capacity, Iguess. How can I solve this?
    Thanks.

    Hi Bilal,
    There are lot of information about this Quota arrangement in the web, in help.sap.com, in SCN community and many other places on the Internet.
    According to the rules of engagement, you should search before asking:
    The SCN Rules of Engagement
    I put SAP Quota arrangement in google and here you have links with screenshots, documentation, etc..all about quota. E.g.:
    Configure Quota Arrangement in SAP MM
    Quota Arrangements - Material Requirements Planning (PP-MRP) - SAP Library
    Your post will be rejected by the moderator if you don't follow this rules.
    So please try with Quota and if that resolves your issue, please close this thread. If you have specific doubts about the Quota, you can open a thread, but try to find the response by your own before posting.
    Kind Regards,
    Mariano

  • Special Procurement using External Procurement & Subcontracting

    Hello everyone!
    We currently have a material  that is set up as "F" Procurement Type (External) with Special Procurement Type "30" (Subcontracting). We have active scheduling agreements for subcontracting procurement of this material.  User also needs to be able to create scheduling agreements for this material where the special procurement type will be "20" (External) to be able to purchase directly from a different vendor.
    We know that we  can only assign one special procurement method (i.e. subcontract (L)) to a special procurement type for MRP.  Therefore, my challenge to all of you is to help me find a way to procure as an external  part . Is there a process which will allow this?
    I am trying to create new sched. agreements but the system is validating the procurement type we settled for the material as type 30. We know that we can modify the message to a "w" type, but actually  i there any problem expect if we doing it? It is that all that we have to do?
    Any help will be appreciate it .

    In this case, you should look at only keeping Procurement type as "F" and Special procurement key as "blank" which give you the flexibility to do both, subcontracting as well as direct procurement.
    Also is your MRP run resulting in schedule lines being created in the scheduling agreement?

  • Transportation lane for special procurement key is flagged for deletion

    we are on SCM 7.0 and ECC 5.0 and transportation lane records are automatically created for items with special procurement keys (SPK). When we change an SPK, the old record is automatically being locked and flagged for deletion. This is causing planned orders in the old lane to not be replanned. it is therefore incorrectly indicating that a requiremnt is being met by the old planned receipt.
    The documentation indicates that the lane should be locked (not locked and flagged for deletion). When it is locked, the orders are deleted and replanned in the new lane as expected.  Can someone tell me if the correct behavior is for it to just be locked or to set to flagged for deletion? if it is supposed to be flagged for deletion, how do we delete the planned orders in the old lane without switching the record back to locked only?

    Hello,
    Please follow on the SAP Help library:
    Automatic Creation of Transportation Lanes
    http://help.sap.com/saphelp_scm50/helpdata/EN/d4/56ef1a5572544081619 a5f87f4055e/content.htm
    Change of Supplying Plant in the Special Procurement Type
    In the SAP R/3 system, if you have changed the supplying plant in the special procurement type, the SAP APO system creates a new transportation lane for the new supplying plant (from special procurement type) and material/plant combination. The already existing transportation lane and now invalid combination between supplying plant and receiving plant in the R/3 system is locked for orders in the SAP APO system. This can be recognized by the lock indicator X that is set by the system.
    Removal of Special Procurement Type from the Material Master Record
    If you have removed the special procurement type from the material master record in the SAP R/3 system, the SAP APO system locks the already created transportation lane so that it cannot be used in orders.
    Hope it helps in this matter.
    The best regards,
    Michel Bohn

  • Special Procurement costing

    Hello Group
    We have a situation here where our planning team wants to put X as procurement type and also wants to keep special procurement type as 12.(Which is procuring from specific plant)
    Now situation is when we are doing costing system is exploding BOM for plant with 12 special procurment type. I want system to explod BOM for this plant and not of procured from plant.
    We also have cross company code costing active. Do you think by deactivating it will help. Also for profit center valuation and group valuation cross company code was activated long back I am not sure what was a reason to activate those two and not legal valuation.
    1. How to make sure production BOM expode rather than procured from plant's BOM
    2. If we want to remove cross company code costing for profit center valuation and group valuation what are the consequences.
    Thanks,
    Santosh Malisetti.

    How to make sure production BOM expode rather than procured from plant's BOM?
    Have you looked at the Quantity structure data on Costing 1?
    We use it when MAterials are procured from a warehouse plant, but we want to cost from the manufacturing plant.
    Entries on the Costing 1 tab will take priority over MRP2

  • Special Procurement MRP View VS. Costing View

    Hi Experts,
    What's the difference between the 2 Special Procurement Key in the MRP veiw and the Costing View?  Should they always be the same?
    Thanks,
    Kumar

    Hi,
    MRP:
    You use special procurement when you want to be able to override the procurement type in the material master or define the procurement type more precisely.
    If the procurement type is in-house, you can nevertheless force the system to ignore the BOM and routing, and process the material as if it were externally procured, by specifying the special procurement as external.
    Costing:
    If you enter a special procurement type in the Costing view of the material master record, it will be used in costing.
    If you do not enter a special procurement type in the costing view of the material master record, the system will use the special procurement type in the MRP view.
    For further Clarification revert.
    Regards,
    S.Babu

  • BOM where-used list with Phantom item ( Special procurement ) - ALV grid

    Hi Gurus,
    I have a request with tcode CS15 when we use alv-grid.
    We have a component with phantom item indicator because we use the special procurement type 50.
    When we run the transaction we don't use the variable list but we use the alv-grid.
    I change the layout but we haven't the field "Special procurement" or "Phantom item" in the column set
    Thanks in advance
    Marco Ferrari

    dear friend
    you could build a query (t-code SQ01) and make visible any relevant fields.
    before run SQ02 and create an info-set based on a standard logical databse CMC.
    you even do not need an abaper. just try yourself. play in DEV system
    good luck.

  • Copy standard cost with Cost Component from another material

    Hi,
    I need to copy standard cost from another material not only total price but also details of cost component split. I try to used transaction CKUC with procedure of "explode material cost estimate" but the reference material use "mixed costing" and isystem stop explosion.
    There is another procedure in order to make this copy? I can not use special procurement because are different codes (material A / Plant XXX copy froma material B /Plant XXX).
    Thanks for your support.
    Mic

    Hi Chandra,
    thanks for your suggestion, it works but only if I explode a level ... material "B" contains two mix codes  that also contain their mixes. So system shows this message "Mixed cost estimate explosion in level 2 for material xxx" and "Mixed cost estimate exists: maximum of 2 explosion level (s) possible".
    So Is not possible to copy and esploded a standard cost with multi level mix?
    Thanks
    Michela

  • Query related to Stock Transfer special procurement key.

    Hi PP Gurus,
    One conflict I got regarding to Special Procurement Key 40 (Stock transfer). Here in one plant material XYZ is getting produced in-house as well as procured from Alternate plant also.
    Initially I configured Spcl Prct key 40 taking XYZ (for example) in Demanding plant (say 1003) as externally procured through material master with spcl prct key 40 and Supplying plant (say 1001) In-house produced through material master.
    Now the requirement is to produce material XYZ In-house in Demanding plant (1003) as well as Stock transfer through Supplying plant (1001).
    As per my information for material handled through STO in Material master procurement type=F with splcl prct key=40 should be maintained in Demanding plant (1003)
    And
    In Supplying plant (1001) through Material master Procurement type= E without Spcl prct key= 40.
    If we change Procurement type from F to X in Demanding plant material master, does it support special procurement key and STO? Is it possible through some other solution? What could be the impact in Std. cost estimate and Product Cost Collector?
    Thanks & Regards,
    Abu Arbab

    Hi Alex,
    Thanks for valuable reply. SAP doesn't support Special procurement key for stock transfer with Procurement Type=X. I think two options one of the following options are suitable for such scenarios.
    1. Reply from SAP
    2. Quota Arrangement
    3. Creation if New material code and new production version for Semi-finished product in plant 1003. That is some what tedious. There is a valuable reply from Rajesha Vittal in this context to one of my last threads subjected [        Special Procurement Key- Withdrawl from alternate plant (40)|https://www.sdn.sap.com/irj/scn/forums]
    I let decision on Client whatever the way he wants will map the process through one of above options
    Here is the reply from SAP
    Normally for a material which is to be produced internally(inhouse production) and also procured externally the material type 'X' is used in the material master.
    Typically, If the material is sometimes produced in house and sometimes completly procured externally depending upon your capacity availability then the procurement type 'X' could ensure that you always have a
    planned order created in the planning(MRP run).Then you would have to decide later whether the material has to be produced in house or procured externally. If it has to be produced inhouse you could convert
    the planned order to Production/process order in MD04 else if the material is to be procured externally you could rater convert the planned order to a purchase requisition and then later could be
    converted to a purchase order.
    However kindly note that the special procurement type of stock transfer can not work with 'X' in standard, so even if you set the procument key to X in the material master it will not be read as the system will only
    look at the procument key of the special procurement type. This is also apparent in the warning message that you recieve when you set 'X' and 40in the material master: Message no. M3 675 ::The procurement type of the special procurement type is F.
    Unfortunately there is not a setting for X for the special procurement in the transaction OPPQ. To achieve this you will need to implement a modification. Please be aware that modifications are not supported by
    the support department of SAP.
    Workaround:
    Typically, if you have such a scenario I would think that you would set this key for the majority of the transactions, ie, 90% of the time this material is truly stock transferred. However if you have to decide laterwhether the material has to be produced in house or stock transfer you could plan it as type 'X' without the special procurement key and later in MD04 convert the planned order and change the material master back again.
    Or you may set procurement type 'E' and create PO manually for stock
    transfer.
    Best Regards,
    Abu Arbab
    Edited by: abu arbaba on Dec 2, 2008 10:06 AM

  • Special procurement Key in APO

    How do I define in APO the special procurement key relationships between plants within the company or consignment/ subcontracting, just want to maintain the same relationship as in R/3. I know you answered about special procurement type U: stock transfer which I got it, could you please explain how I maintain the above Sp. procurement keys in APO.
    Thanks Mono
    Harish's reply:
    As far as i know you cant maintain Spl procurement keys in APO. This is used as an indicator in the material master for CIF and for creation of Transportation lanes in APO. So if you create manually more transportation lanes in APO to other source locations it will all be considered as sources of supply unlike in R3.

    Hi Mono
    Are you planning to run MRP in R3 and also plan in APO for the same materials. Depending on the sequence one of the runs is wasted
    you normally plan selected materials in APO  and the rest in R3
    You can use the X0 in product master for APO relevant indicator and CIF only these materials to APO and plan it here
    as for the spl procurement keys
    If you have a special producrement key in R3 the Transportation lanes are created automatically with the  correct source of supply or you can ensure you manually create this(and block or delete the others) so the planning  will be the same as it would be in  R3

  • Special procurement

    We have the next case
    A supplier is had with which the subcontracting figure is had; it is to
    say the company facilitates part to him of the required components to
    make the product.
    On the other hand, the negotiation with the supplier is of purchase in
    consignment, therefore the payment to the supplier is made solely when
    the product is consumed
    We have the following problem: When making the entrance of the product
    (101) to the inventory is not possible to leave it in consigment. That
    we can do?
    Exists some form to both have cases of special procurement in one
    single one?

    Hi Yasir,
    You can do that. I think you want to produce semi2 in X plant and after production you want transfer it to Y plant, So material semi2 in material master of Y plant maitain special procurement key=40  or 80 ( i.e., production in alternative(y) plant) then maintain BOM also in Y plant.
    And create same material semi2 in plant X by using procurement key=E (in house production) and maintain same BOM . Then in this plant create work center, routing..etc as master data. Create requirement n run mrp n display stock/requirement list ( here system will display the planned order for perticular qty in one column n in last column system will show you the name of another plant) n create production order. After confirmation n all , MB1B and trasfer the semi2 material to plant Y.
    Hope I cleared you , eventhough lets wait what other experts will reply you.
    Regards,
    Imran Shaikh

  • Which table in APO has the SPECIAL PROCUREMENT TYPE field?

    Hi All,
    I have to enhance the CIF by creating two additional T-Lane on the basis of Special procurement type of the product. For which table in APO can i get this field.
    Also Is there any table in APO containing the value of material type in ECC
    Please Help.
    Thanks and Regards,

    Hi Gaurav ,
    When you have special procurment key settings in R/3  for a material such that location B gets stock from location A (A---> B) , when you CIF the material to APO ,  a transportation lane gets created with source location = A and destination location = B.  This source - destination combination is stored in table /sapapo/TR . If you want to get all products that are available in a particular transportaion lane you have to query table /sapapo/trprod.  Means of transport is stored in table /sapapo/trm.
    Also i dont think material type is available in APO (not very sure ).  Material group is available and it is stored in table /sapapo/matkey.
    Thanks
    Saradha

Maybe you are looking for