Could low priority transmit B2B credit be configured on MDS 9000 switches?
According to cisco "Slow Drain Device Detection and Congestion Avoidance"
Quote as following
"1 in every 8 credits (with a maximum of 15) is reserved for absolute priority traffic only. All the user and data traffic (which could be high, medium, or low priority) is sent using the remaining shared credits."
Is it just a default or configurable setting? If it is not configurable, how if data traffic congested the link? As data traffic can only use low priority B2B credit, total B2B credit will be remaining non-0 all the time, so Link reset will not occur anyway? How could low priority B2B credit get recovered?
Thanks in advance for any of your help!
Number of credits should depend on the receive frame size. If let's say you double the frame size setting, the receive B2B credit should half.
Similar Messages
-
All of a sudden Safari on my MacBook Air won't let me do anything. I have a Mac OS X Version 10.7.5.
As soon as I open Safari, a message comes up straight away saying 'Appliance Error (configuration error) Your request could not be processed because of a configuration error: account is disabled'.
I also can't check for system updates because of a 'network error' and can't connect to the App Store.
My internet is working fine and safari is working fine on both my iPhone and iPad.
I've never seen this message before and I'm not having much luck in searching for an answer.
This may be a silly question, I don't know, but does anyone have a solution?Back up all data.
From the menu bar, select
▹ System Preferences... ▹ Network
If the preference pane is locked, click the lock icon in the lower left corner and enter your password to unlock it. Then click the Advanced button and select the Proxies tab. If any proxy options are selected, make a note of them and then deselect them. You don’t need to change the bypass or FTP settings. Click OK and then Apply. Test. The result may be that you can't connect to any web server. Restore the previous settings if that happens. -
RTSJ thread priorities, Lower priority thread running
Hi,
I'm experimenting with a thread pool that I've written containing javax.realtime.RealtimeThreads. I'm trying to use this to replace a java.util.concurrent.Exectutor type thread pool in an existing application. My design involves a Queue where the RealtimeThreads wait on until a Task is submitted for execution. All the threads in the pool start at the lowest priority and upon the submission of a task, I have written some logic to increase the priorities of the threads that I want run.
At a given time, there could be many threads with tasks assigned to them and some without tasks. My algorithm to decide which thread is to be given the CPU, runs every time a task is submitted to the system as well as at the end of the current thread execution. I assumed that If I set a thread's priority higher than the others it would automatically be given the CPU and all I have to do is to set the Priority using rtThreadObject.setPriority() method. I obtain the highest priority in the system through PriorityScheduler.instance().getMaxPriority() method and do similarity to obtain the Normal and Lowest priorities in the system.
Recently I added some code to change the priority of a thread from another, and noticed that the target thread's priority is higher than the one that is currently running. I'm not sure how a lower priority thread can run, when a higher priority thread is already in the system. I'm wondering whether it's to do with the current thread of execution getting woken up by a task submission (I do a QueueObject.notify() ) and continue to run at the lower priority, I have my doubts on it. Can anyone give some ideas as to how such an instance could exist?
I'm developing on a Linux-RT kernel with RTSJ 2.1
Thanks,
ViduraSorry for the delayed response.
Thanks a lot for the answer. This certainly might be the case in my scenario as well. However, is there a way that I could query the active priority from a Thread and confirm? I also have a few questions just to confirm my thoughts on such a scenario.There is no way to query the active priority of a thread.
1) Can Priority inheritance take place if a high priority thread is blocked on some IO operation say even a simple System.out.println ?Priority inheritance occurs when a thread holding a monitor causes a higher-priority thread to block trying to acquire that monitor. At that point the thread holding the monitor is given the priority of the thread it is blocking. So this can happen anytime a lock is held, regardless of what the thread is doing at the time.
2) In the simple scenario of a couple of threads with different being active at the same time with Java or RTSJ in particular, as long as the threads are not blocked or competing for a shared resource, is it possible to assume that the highest priority thread will get the CPU 100% of the time?The simple answer is "yes" but reality is more complex. Shared resources occur at the application, VM/runtime-library, and OS levels. You would have to avoid them at all levels to ensure the highest base priority thread is also the highest active priority.
3) If we as programmers takes great care in preventing IO operations (or controlling any IO operations, i.e. where to place them in the code) even simple as a System.out, priority inversions or inheritance would not take place?Priority inheritance is not directly related to I/O operations - the issue is whether methods are synchronized or not.
4) In such a scenario highlighted in 3, what practices could be used to debug the code if needed?On Solaris we use DTrace and the Thread Scheduling Visualizer for debugging timing/scheduling relationships. I'm afraid we don't have anything equivalent on Linux at this this time.
As for exactly what I'm trying to do, it's a bit convoluted as I'm trying to achieve predictability in an existing product using RTSJ, that wouldn't be used in the trivial real-time sense, like an embedded environment, rather as a normal application. I will follow up with more details of it if needed.Don't worry, we have numerous users applying real-time Java to "normal" applications. :)
David Holmes -
Worklist has no low priority items (only Very High, High and Medium)
This is the default:
Low
0-25%
Medium
26-50%
High
51-75%
Very High
76-100%
However, the worklist has no low priority, only Very High, High and Medium.Similar situation here. I fitted a BT accelerator a month after the switch to ADSL2+ to get that last little bit of speed and instead it caused repeated dropouts. My IP profile got hammered and SNR set crazily high as a result.
Removed the accelerator and have a rock solid line again. That was 3 weeks ago and my profile is now at 12000 with SNR down to 12db. Hopefully will be back to where I was before the accelerator some time by the end of January.
I am using a Dlink 2460 so could force the SNR down with DMT software but am holding off at the moment as BT's profiling is so aggressive I don't want to give it any excuse to hammer my line again. -
Step by Step Credit Mgmt Configuration
Hi Gurus,
Can any body give me step by step Credit Mgmt.configuration to me?
Points will be awarded for good answers for sure.
Looking forward for your hlep.
VCShttp://help.sap.com/printdocu/core/Print46c/en/data/pdf/FIARCR/FIARCR.pdf
How To Do Configuration For Credit Management
Credit and risk management takes place in the credit control area. According to your corporate requirements, you can implement credit management that is centralized, decentralized, or somewhere in between.
An organizational unit that represents the area where customer credit is awarded and monitored. This organizational unit can either be a single or several company codes, if credit control is performed across several company codes. One credit control area contains credit control information for each customer.
For example, if your credit management is centralized, you can define one credit control area for all of your company codes.
If, on the other hand, your credit policy requires decentralized credit management, you can define credit control areas for each company code or each group of company codes.
Credit limits and credit exposure are managed at both credit control area and customer level. You set up credit control areas and other data related to credit management in Customizing for Financial Accounting. The implementation guide is under Enterprise Structure -> Definition or Assignment -> Financial Accounting and then Maintain credit control area. You assign customers to specific credit control areas and specify the appropriate credit limits in the customer master record.
Settings for determining the credit control area of a document. The settings of items 1 - 4 are taken into account according to their priority. The credit control area found is stored in field VBAK-KKBER.
1. Transaction OB38
Check which credit control area is assigned to the company code.
Company code:
Credit control area:
2. Transaction OVFL
Check which credit control area is assigned to the sales area.
Sales area:
Credit control area:
3. Transaction XD02 or VD02
Check which credit control area is assigned to the payer.
Payer:
Credit control area:
4. Transaction SE37
Is user exit EXIT_SAPV45K_001 being used?
5. Transaction OBZK
For the settings under items 2 - 4, field "All company codes" must be marked in Transaction
OB45, or the credit control area must be entered under the relevant company code in table
T001CM of the credit control areas allowed.
Company code:
Credit control areas allowed:
6. Settings for the credit checks
7. Transaction OVAK
Which settings do exist for the sales document type used?
Sales document:
Check credit:
Credit group:
8. Transaction OVAD
Which settings do exist for the delivery type used?
Delivery type:
Credit group for delivery:
Credit group for goods issue:
9. Transaction OB01
Credit management/Change risk category
Definition of the risk category for each credit control area. This risk category can be
assigned to a credit account by using Transaction FD32.
10. Transaction OVA8
Here, the individual credit checks for key fields
o credit control area
o risk category
o credit group are set. Take these key fields from the above settings and go to the detail
screen. In particular, check whether fields "Reaction" and "Status/block" are set
correctly. To carry out follow-up actions in case of a credit block, the credit check
status must be set (field "Status/block").
11. Transaction FD32
Credit master data for the payer of the relevant document.
Credit account:
Credit limit:
Risk category:
Currency:
12. Settings for updating the credit values Update of the credit values is required for the limit
check (static or dynamic credit limit check).
13. Transaction OVA7
Update of the credit value is active for the corresponding item type if the check box is marked. This field corresponds to
field "Active receivable" in Transaction VOV7.
Item type:
Active receivable:
14. Transaction V/08, Pricing
In the pricing procedure used for pricing, subtotal "A" must be entered in a line for
determining the credit value (mark the pricing procedure and doubleclick on "Control").
Usually, the net value plus taxes is used. This way the system is determined to use this
subtotal for credit pricing. The credit price is stored in field VBAP-CMPRE and used for
update and credit check.
You can find the used pricing procedure of the order under "Item -> Condition -> Analysis".
Pricing procedure:
Line with subtotal = 'A':
15. Transaction OB45
Which update group (field "Update") do you use in the relevant credit control area? The
default setting is "12". If you use another update group, check whether this is fine with
you. If you open an OSS message, please tell us the alternative update group.
Credit control area:
Update:
16. Transaction OMO1
Which kind of update did you choose for structure S066?
In any case, "Synchronous update (1)" has to be chosen as the kind of update.
All other settings will lead to errors.
Regards,
Rajesh Banka
Reward points if helpful -
Windows Could Not Update the Computer's Boot Configuration. Windows Server 2012
I am trying to install Windows Server 2012. When installing, I get the message Windows Could Not Update the Computer's Boot Configuration. Installation
cannot proceed. It cancel the installation. Can anyone help me with my problem?Hi,
Any update about the issue?
Please post more detail information about the issue?
How did your do the installation? clean install or override install?
Regards.
Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Support, contact [email protected] -
Windows could not update the computer's boot configuration. via UEFI installation
I recently performed a clean WIndows 8.1 installation using my new Hard drive. However, under UEFI mode from BIOS, everytime the setup process reaches the "Installing Updates" stage, I kept on receiving an error "Windows could not update the
computer's boot configuration, Installation cancelled.
I was a bit puzzled as everytime I install Windows 8.1 via LEGACY mode from BIOS, setup finishes! I cannot tell whether I need to mod my BIOS or what.
please help.
raymund r
Hi,
Please make sure that Delete all partitions/volumes on the disk # (ex: Disk 0) that you want to install Windows 8.1 as UEFI on until that disk # shows as unallocated space.
Try again to install Windows 8.1 again.
If it still fails, please post back the setuperr.log and setupact.log under C:\$WINDOWS.~BT\Sources\Panther\ for our research. You can copy them out in WinPE command mode.
Also, I would like to check if you use bootcamp to install Windows 8.1 on Mac computer. If so, check the solution here:
https://discussions.apple.com/thread/5491283?tstart=0
Please Note: Since the website is not hosted by Microsoft, the link may change without notice. Microsoft does not guarantee the accuracy of this information.
Kate Li
TechNet Community Support -
HELP!!!
Windows could not update the computer's boot configuration. Installation cannot proceed.
The installation then it says "The installation was canceled" and "Any changes to your computer won't be saved.
I have been trying to sort this out for over 15 hours.
I have the MacBook Pro (Late 2011)
Quad Core i7 (Clocked at 2.2GHz)
4GB Ram
Radeon Graphics (512mb graphics ram)
Running OSX Yosemite (10.10.2)Did you have to modify Bootcamp Inof.plist to see the USB Installer option?
Your USB device needs to be a USB2 device. Here is an example. -
Low priority and high priority queue
Hi
we have high priority and low priority queue's. Functionality wise i know that time critical messages will be sent through high priority queue's and low priority messages will be sent
through low priority queues. But like to know what technicality makes this separation of
low priority and high priority queue's ? The crus of the question is what technical setting(s)
makes the queue as high priority and what technical setting(s) makes the queue as low priority
queue.
Thanks
kumari Michal
I am talking abt queue prioritization on Integration eninge only.
I am good with queue prioritization and am able to successfully implement
the same. We are using only PI7.0.
My question is what is the technical difference between high priority
and low priority queues ? what technical setting makes it a high priority
queue and what technical setting makes a low priority queue ?
Your answer:
how the system reacts to new messages if almost all queues are already blocked
for some types of messages
My comment: what setting makes the system to behave like that ? what property
of that queue makes them to behave like that ?
Thanks
kumar -
Hi,
Could you please tell me how to configure NSP as « trusted » system in the latest trial version of NetWeaver?
Please see the attachment.
Thanks,
MarcHi Marc,
go to transaction STRUSTSSO2, generate a certificate for your system, then add it to certicate list and to ACL for your client.
There will probabely be several parameters to set in instance profile if you plan to use SSO.
Best regards,
Vincent -
Error ''windows could not update the computer's boot configuration"
i have an Hp pavilion dv 6 -3045 product wr747ea#abe ,till now i installed windows 7 on it several times but this time after i formated the partition and started the instalation from usb at completing the installation a message popup ''windows could
not update the computer's boot configuration''.Also i tried with another copy of windows 7 also booted from usb but i get same message at same step. I used a memory stick and bootable windows 7 from usb with Rufus program.
Please any sugestions ?Hi,
Please make sure you have format the system drive and perform a clean install, not just override or upgrade from the previous system.
The bootloaders for Windows Vista and Windows 7 are quite similar, you could have a look at this article and see if it's helpful to you:
When I try to upgrade an earlier version of Windows to Windows Vista, I receive an error message: "Windows could not update the computer's boot configuration"
http://support2.microsoft.com/kb/931697
Karen Hu
TechNet Community Support -
Windows could not update the computer's boot configuration Server 2012
I'm trying to install Windows Server 2012 on another partition (V:) that I create directly from Disk Management. After I create it, I do a simple format of the partition.
Next, I try to Install Windows Server 2012, directly on the recent partition, after the setup is completed, Windows Server 2012 boots to the Getting the devices
ready section, but stops and throws me this error.
Windows could not update the computer's boot configuration
After that the computer, restarts and it goes on and on unable to create a multi-boot environment. What's killing me is that I have done this on the past like 10 times and never run to this problem.
I'm running Windows 7 Home Premium on an ASUS K45 64 bit.Hi,
You can try adding a new boot entry by using bcdedit tool:
Adding Boot Entries
http://msdn.microsoft.com/en-in/library/windows/hardware/ff541231(v=vs.85).aspx
Or you can build a usb-bootable deivce to install the image:
Walkthrough: Create a Bootable Windows PE RAM Disk on a USB Flash Disk
http://technet.microsoft.com/en-us/library/dd744530(v=ws.10).aspx
Hope this helps. -
Credit Card Configuration in SAP
Dear All,
Can I have the information on Credit Card Configuration.
Regards,
GerogeDear George,
Please find the relevant details related to credit Crads as follows:
Overview
This document attempts to explain in the brief the credit card processing in SAP.
SAP provides a flexible and secure payment card interface that works with the
software of selected partners that provide merchant processes and clearing house
services. In SAP the credit card processing is integrated with the sales and
distribution module.
Payment card configuration
Much of what is required for credit card processing to work with VISA, Master
Card, and American Express is already set up in SAP.
For all credit card configurations refer to
Define Card Types
Transaction SPRO IMG Sales and Distribution Billing Payment Cards
Here we define the type of cards that can be used in the system. A four-letter
code is given for each card type. E.g. MAST for Master Card, VSAJ for Visa
Japan. A function module for checking the card number is also specified here.
1. Define Card Types
Credit Card Configuration And Processing In SAP
Maintain Card Categories
(a) Define card Categories: Here we specify the card category of the
payment card. With this the system automatically determines the card
category when you enter a card number in master data or sales
documents.
(b) Determine card categories: Here we specify the acceptable number
ranges for different card types. Also card categories are assigned to the
card types. Even though SAP comes with card checking algorithms
(Function Modules) for standard card types this configuration setting
is particularly useful to those cards that do not contain any standard
checking algorithm already set up in SAP.
2. Determine Card Categories
Maintain Payment Card Plan Type
In this step, you assign the payment plan type for payment cards, the payment
card plan type, to all sales document types in which you will be using payment
cards. You cannot process payment cards if you have not made this assignment
The standard system contains payment plan type 03 for processing payment
cards. 3. Show the screen where this assignment is done.
Credit Card Configuration And Processing In SAP
3. Maintain Payment Plan Type
Maintain Blocking Reasons
In this step, you define blocking reasons for payment cards. You enter these in
the payer master record to block cards. The standard system contains blocking
reason 01 for lost cards.
Risk Management for Payment Cards
Transaction SPRO IMG Sales and Distribution Billing Payment Cards
Authorization and settlement Risk Management for payment cards.
Risk Management plays a central role within Sales, providing you with checks
and functions to minimize your credit risk. In addition to letters of credit and
export credit insurance, payment cards are among the payment guarantee forms
that you can use to insure payment for sales order items. SAP comes with predefined
payment forms of guarantee as shown below. Customer can also
maintain other forms of payment suited for their line of business.
Credit Card Configuration And Processing In SAP
Define forms of payment guarantee
3. Define forms of payment guarantee
Maintain payment guarantee procedures
In this step, you define Payment guarantee procedure. These procedure controls,
which form of payment guarantee, are valid for a particular customer, and for a
particular sales document type.
The various settings done under this configuration are
Define payment guarantee procedures
Maintain customer determination procedure
Maintain document determination procedure
Assign sales document types
Determine payment guarantee procedures
Maintain authorization requirements*
Here requirements* are set to tell the system how and when to carry out
authorization when a sales order is saved. SAP comes with two requirements
Form routine 1. Carry out authorization only when the sales document is
complete. The system carries authorization when the order is saved.
Form routine 2. Carry out authorization only when the sales document is
complete, but the authorization for all the complete documents is carried out in
batch.
Additional requirements* can be assigned here as per the business requirements.
*Requirements are ABAP/4 code. Requirements for various functions can be accessed using transaction VOFM
Credit Card Configuration And Processing In SAP
4. Maintain Card Authorization Requirements
Maintain Checking Groups
How and when authorizations are carried out depends on the setting you make in
the customizing for maintain checking group routines.
The three main settings that influence authorization are:
a) Authorization requirements
b) Authorization horizon
c) Preauthorization
There are two settings under this setting.
Define checking group: Here a checking group is defined and the
authorization requirement (described in the previous section), Authorization
horizon (described below) and preauthorization settings are done for this
checking group.
5. Define Checking Group
Credit Card Configuration And Processing In SAP
Here you can see a checking group C1 is defined with the authorization
requirement 902. Checking the pre-authorization tells the system to carryout preauthorization
if the order fulfillment date falls outside the horizon. The
authorization horizon specifies the number of days before the material
availability date, or billing date, that the system is to initiate authorization. If a
sales order is saved within the authorization horizon, the system carries out
authorization immediately. If a sales order is saved before the authorization
horizon comes into effect, the system does not authorize at all, or carries out
preauthorization.
6. Preauthorization Concept
In this example, the system has been set to authorize one day before delivery
creation. The system does not carry out authorization when the order is saved on
Day 0, rather on Day 2. Note that the authorization validity period has been set to
14 days in Customizing IMG Authorization and settlement Specify
authorization validity periods. The transaction will have to be reauthorized if
delivery activities take longer than 14 days.
Assign checking groups: Here the checking groups defined earlier are
assigned to different sales document types as shown 8.
Specify authorization validity periods
Here number of days that an authorization can remain valid for different card
types are maintained. Refer to 9.
Credit Card Configuration And Processing In SAP
8. Assign checking groups
9. Assign validity period for authorization for different card types
Credit Card Configuration And Processing In SAP
Account Determination
Transaction SPRO IMG Sales and Distribution Billing Payment Cards
Authorization and settlement Maintain Clearing House
In the following steps, you set the condition technique for determining
clearinghouse reconciliation accounts for authorization and settlement. The
system uses the entries here to determine the clearing account for the payment
card charges. When settlement is run, the postings in the receivable account for
the payment card will be credited and a consolidated debit will be created and
posted to the clearinghouse account. These accounts are a special type of general
ledger account that is posted from Sales and Distribution.
Here, you maintain:
Maintain field catalog.
Condition tables and the fields that they contain
Access sequences and condition types
Account determination procedures
You then assign these accounts to condition types.
Add to field catalog
Here you maintain the fields that can be used in the condition table. 10.
Shows the transaction to maintain the field catalog.
10. Maintain Field Catalog.
Maintain condition tables
Here condition tables are maintained with fields that are added to the field
catalog. SAP comes pre-configured with two condition tables 4 and 6. Refer
11.
Credit Card Configuration And Processing In SAP
11. Maintain Condition Table
Maintain access sequences
In this step we define an access sequence and link the access sequence with the
condition tables.
Here an access sequence is defined. SAP comes with the access sequence A001.
12. Define Access Sequence
Once the new access sequence is defined, it is linked to the condition tables as
shown in the next screen.
Credit Card Configuration And Processing In SAP
13. Maintain Access For Access Sequence
Selecting an access and clicking fields will display the fields for the selected
access as shown below for access 10 as shown above.
14. Display Access Fields
Maintain condition types
Here condition types are defined and the access sequence to linked to it.
Condition types are contained in account determination procedures and control
which access sequences the system uses to find condition records.
These are The condition tables.
Credit Card Configuration And Processing In SAP
15. Define condition type
Maintain account determination procedure
In this step an account determination procedure is defined and linked to the
condition type (which in turn is linked to the access sequence).
Define account determination procedure
16. Assign account determination procedure.
Here an account determination procedure CC01 is defined and the condition type
CC01 is assigned to it.
Access sequence linked to the condition type
Credit Card Configuration And Processing In SAP
Assign account determination procedures
In this customizing the previously set up account determination procedure is
assigned to different billing documents.
Assign Accounts (G/L)
G/L accounts are assigned here for the combination of Sales organization, Card
type, chart of accounts and condition types as shown in the 17.
17. Assign G/L accounts
Set authorization / settlement control per account
Each G/L account is assigned an authorization and a settlement function module.
The system will read the configuration a call the authorization and settlement
function module during authorization and settlement respectively.
Credit Card Configuration And Processing In SAP
18. Set Authorization and settlement function module
Maintain merchant IDs per account
A merchant may have one or more IDs for each clearinghouse with which it does
business. Here, you assign these different merchant IDs to their related
receivables accounts.
19. Assign Merchant IDs
Credit Card Configuration And Processing In SAP
Authorization and Settlement in SAP
20. Sales Order Cycle With Credit Card Authorization
When an order is placed through the front-end system, the order information,
credit card information, billing information, shipping information is passed to
SAP. SAP processes the order calculates the taxes, the shipping costs and reads
the configuration information settings and executes the function module setup as
described in Fig. 18. The function module formats the data and makes a RFC *
call to the payment application**.
The payment application screens the order for fraud, encrypts the data and
communicates with the third party processor who in turns communicates with
the card association and card issuer.
*RFC (Remote Function Call)
*Payment Application: Middle ware between SAP and third party processor/bank.
Credit Card Configuration And Processing In SAP
The third party processor responds back with the response whether the
transaction is approved or declined or referred.
Note: When any item in the order does not have a confirmed quantity, then
authorization is not carried out for the full amount. A small dollar amount
usually ($1) is used as the authorization amount. During the rescheduling run
the system will check for the material availability. If the material can be
delivered within the horizon date, a full authorization for the order is carried
out.
Approved: When the credit card transaction is approved the systems checks for
the material availability, confirms the material for the ordered quantity and saves
the order.
Declined: The material availability check for the material is not made, and the
order is rejected.
Referred: The order is saved and is blocked for delivery. In this situation is
merchant calls the bank checks for the available credit on the card and a manual
authorization is carried out.
21. Sales Order Entry Screen in SAP
Payment Card
Information
Credit Card Configuration And Processing In SAP
The first line in payment card screen is the card check performed by SAP system,
using the card check algorithm function module as described in 1. And the
remaining lines represent the actual authorizations that are carried out.
22. Payment Card Screen
Path Header Payment Cards.
Settlement
Legally the merchant can charge the credit card after the order has been
completely processed. In SAP this happens after a delivery is created and the
goods has been shipped. In case there is not enough authorization for the order
to be delivered, the system goes out the get the authorization for the remaining
amount.
In SAP settlement is initiated using the transaction FCC1. All the valid
authorization is submitted in a batch to the payment application at scheduled
intervals as specified by the third party processor.
The payment application encrypts this data and communicates with the third
party processor. The third party processor checks if the settlement request has a
valid authorization against it. The third party processor then transfers the fund
from the cardholders bank to the merchant bank.
Authorization
Response
Credit Card Configuration And Processing In SAP
Regards,
Rakesh -
Low priority VM and Quick migration
Hi ,
When we pause or set one of hyper-v host on maintenance , the fail-over cluster migrate VMs to another hosts , some VMs migrate using live migrated and the others using Quick migrated
I notice the VMs that are prioritized with low priority using Quick migration
Why not all VMs doesn't use live migration ?
thanks
RamyI don't think this is related to priority. My experience has been that VMs that are running are live-migrated, while VMs that are paused or powered down cannot be live-migrated but must be quick migrated. This makes sense if you think about it. Live-migration
migrates a running VM's memory and settings then the storage handle. None of these apply if the VM is down.
Sam Boutros, Senior Consultant, Software Logic, KOP, PA http://superwidgets.wordpress.com (Please take a moment to Vote as Helpful and/or Mark as Answer, where applicable) _________________________________________________________________________________
Powershell: Learn it before it's an emergency http://technet.microsoft.com/en-us/scriptcenter/powershell.aspx http://technet.microsoft.com/en-us/scriptcenter/dd793612.aspx -
Yaourt building aur stuff slowly very low priority
hey guys, all the sudden when yaourt builds aur packages its like +15 priority, very slow, the one iom trying to build this moment is firefox-pgo-beta , its executeing the build commands at ridiculously low priority its been building for 3 days and isnt done, this didnt happen before. ive done allot of research and dont want to bother anyone but though this may have come up for someone else before. Thanks guys
Please don't cross post. Creating new threads because you're impatient is no different than bumping your own thread frequently.
Maybe you are looking for
-
Issue with Multiple Tables in Report
Post Author: dwessell CA Forum: General Hi, I'm using Crystal Reports 2k8. I'm doing a report with three tables, CQ_HEADER, SO_HEADER and SALESPERSON. Both the CQ_HEADER and the SO_HEADER tables link to the SALESPERSON table via a SPN_AUTO_KEY field.
-
Tables parmeters in the subroutienes and function modules
Does we use tables parameter in the sub routienes and in function modules? Moderator message: please search for available information/documentation. Edited by: Thomas Zloch on Mar 10, 2012 4:56 PM
-
Since i did not buy all my music from Itunes i can not put it onto my iphone. Is there a way to access my music from my iphone in a folder on the computer and drag my music there that way? If not, how am i supposed to put my music onto my iphone?
-
Illustrator CS5.1 trial download extracting...taking forever!
After I downloaded a trial version of Illustrator CS5.1, I got the following error message: illustrator_15_1_LS1.dmg error -4960. Then the extracting process started & it's been going on for over an hour! How can I stop this? I even shut down my
-
Manual serial number generation
Hi i have maintained the serial number profile for my material. Now i can maintained the serial number manully, with own nuber range........... please let me know the setting for this manula serial numebr creation